Senior Bridge Engineer
Systra Arabia
Total years of experience :12 years, 10 Months
Design of the site wide infrastructure for Neom Industrial City NIC
Design of bridges and highway utility structures and also design of RC and prestressed concrete strucures
Solve site construction issues and perform coordination in the construction phase in the third Saudi expansion of the Holly Haram in makkah.
Design and analysis of various types of bridge decks including design of prestressing cables and detailing of the Super structure, also design of substructure including piers, abutments and foundations.
Design and prepare preliminary and detailed calculations and drawings for various structural elements such as slabs, beams, cores, shear walls, foundation weather shallow or deep, also experienced in performing analysis weather static or dynamic, linear or non linear, also can perform staged construction analysis and use time dependant material properties in the analysis.
GPA 3.5
The main topic of the master of engineering research is the analysis and design of cable stayed bridges. GPA 3.45
Study all branches of structural engineering as concrete design, steel design, structural analysis, structural dynamics, bridge design and geotechnical engineering.