Technical Office Engineer
AJYAD HOTEL & HOSPITAL MAKKAH )in (BIN LADINPRECAST FACTORY)
Total years of experience :8 years, 5 Months
Deep foundations and ways to implement and how to overcome their problems and
follow-up and monitoring of construction projects in (Al-MOQAWLON Al-ARAB
COMPANY).
* Productive training on construction symbols under the supervision of the Egyptian
Ministry of Housing.
* Post-tensioning system
18, 500 m2 of steel structure including MEZZANINE area, MV-LV ROOM, Camp area, R.C. works, Mechanical works.
Infrastructure, 5 Typical building 5 floors, Mosque & Restaurant .
- Bahrah : 18, 500 m2 of steel structure including MEZZANINE area,
MV-LV ROOM, Camp area, R.C. works, Mechanical works.
Job Responsibilities:
Shop drawing, Inventory quantities & Invoices .
Checking propriety of materials and mixtures as developed by an outside testing
laboratory, or proportioning a mix, evaluating it in relation to both design and
production requirements.
Inspection and verification of the accuracy of dimension of units, quantity and
location of reinforcement and cast-in times, form and mold layout.
Periodic inspection of concrete batching, mixing, handling, placing, consolidating
, finishing, and product handling and storage procedures.
Inspection of all finished products for conformance with shop drawing and
specifications.
Supervise steel erection, as required, to insure units are erected in the most
efficient and safe manner including proper erection sequence.
Since