Chief Surveyor & Design Engineer
United Gulf Construction Company
Total years of experience :16 years, 3 Months
Project: A;Seeb Sewage Collection and Conveyance System - Al Khoudh Gravity Sewer Networks
My responsibilities are:
• Leading the team of surveyors working with construction section (one surveyor per each working group). That includes, technical support, directing methodology, supply hardware and their maintenance, checking works at the site periodically.
• Design works for gravity network and all pressure pipelines in the project, that includes, checking the Contract pipeline routes and the selection of the feasible path, and suggest modifications as necessary, draw the required shop drawings for alignment and plan & profile.
• Follow up the site works for gravity network and pressure pipeline network and make the necessary modifications due to unforeseen site condition in cooperation with design manager.
Project: Contract (DS.126) Irrigation mains from JABL ALI STP.
Was in share of
*Surveying and setting out works for 24 K.m by GPS (Trimble)
*Installing pipes (2000 mm)
*Data Operator for Surveying works.