أحمد ابوالدهب, Site Manager

أحمد ابوالدهب

Site Manager

Future Pipe Industries Group

البلد
مصر - القاهرة
التعليم
الثانوية العامة أو ما يعادلها, power mechanical
الخبرات
11 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 0 أشهر

Site Manager في Future Pipe Industries Group
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ يناير 2018

Support and managing all related activities to
Industrial, Oil & Gas Site
Typical work activities:
* Communicate with sales team and study the projects requirements.
* Make cost estimation offer for the installation works to be done on
site.
* Make order with all tools and consumable needed prior starting the
project.
* Communicate with the client and prepare the production priorities
and installation schedule as per site requirement.
* Check the best installation way of the pipes.
* Make weekly progress report with all on ongoing projects.
* Resource allocation for the site crew as per site requirement
* Make all site required documents (MS, ITP, WP, etc..)
Some Projects
* Fertilizer Complex in Sukhna - INTECSA/HAC JV
* El Galalah Water Desalination plant - METITO/ORASCOM JV
* El Alamein SWRO Plant - AQUALIA
* Fire Fighting network additional fire hydrant - SUMED
* Modification on firefighting system

Senior Site Engineer في Future Pipe Industries Group
  • الإمارات العربية المتحدة
  • ديسمبر 2013 إلى ديسمبر 2013
senior site engineer في Talaat Moustafa Group (Madinaty
  • أكتوبر 2011 إلى ديسمبر 2011

works as part of the Site
Services Department on Infrastructure, Utilities, Oil
and Gas Projects
Typical work activities:
* Acting as a Team Leader during installation of GRE pipe on Oil &
Gas Projects & Power Station.
* The main technical adviser on installation GRP pipes on
Infrastructure, Utilities projects.
* Review ISO. Drawings with technical office before starting
* ensuring all materials used and work performed are as per
specifications;
* Ensured that drawings were compatible with structure.
* Overseeing the selection and requisition of materials and plant.
Some Projects
* ABO QIR Power station (Egypt)
* ASSIL & KARAM Gas Development Project (Egypt)
* Middle East Oil Refinery (MIDOR) (Egypt)
* Timimoun Field Development - SAMSUNG (Algeria)
* Bethel areas New Trunk sewer lines (Ethiopia)
* Errachidia & Taroudante AEP project

Quality Control Engineer في Inspectorate Egypt LTD
  • أكتوبر 2008 إلى أكتوبر 2011
Mechanical Maintenance Engineer في Shoubra Company for Engineering Industries. Military Factory No. 27
  • يونيو 2007 إلى سبتمبر 2008

Responsible for planning and following up the
production.
Responsible for the inspection and testing of Bullet

Senior Mechanical Engineer في Plumbing, water and waste water systems
  • إلى
senior site engineer
  • إلى

works as part of the site
management team liaising with and working alongside
architects, engineers, construction managers,
supervisors, planners, surveyors and
subcontractors. They share responsibility for site
security, health and safety, and the organization
and supervision of material and human resources.
Typical work activities:
* acting as the main technical adviser on a construction site for
subcontractors, crafts people and operatives;
* Implemented all aspects of plumbing design including domestic water,
sanitary systems.
* checking plans, drawings and quantities for accuracy of
calculations;
* ensuring all materials used and work performed are as per
specifications;
* Ensured that drawings were compatible with structure.
* overseeing the selection and requisition of materials and plant;
* liaising with any consultants, sub-contractors, supervisors,
planners, quantity surveyors and the general workforce involved in
the project;
* Resolving any unexpected technical difficulties, and other
problems that may arise.
* Perform money calculations for subcontractors with quantities of
the performed works

inspector في INSPECTORATE Egypt LTD
  • إلى

EGAC for chlorine
cylinder by using ultrasonic instrument
* Planned and supervised activities concerned with
development, application.
* Planned, reviewed inspection procedures, auditing and
training responsibilities.
Tested and monitored incoming materials to ensure
compliance with requirements and specifications.
* Resolved technical problems affecting quality of parts
and led improvement activities identified in the Quality
Improvement Plan.
* Inspecting Engineering field Such as:
Pumps, Motors, Fans, Chlorine Cylinders, Clarks,
Compressors, Electro-Magnetic Flow Meters,
Steel Coils& Measuring devices
* Team leader during the inspection process.
* Performing Hydraulic Test on Cast Iron Pipes
and Valves
* Tender study and analysis.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, power mechanical
  • في Zagazig University, BenhaMubarak Secondary School
  • مايو 1999

Graduation Project: Study of Infiltration Rate in Cold Stores& Air Conditioning Laboratory Unit Graduation Project Grade: Excellent

Specialties & Skills

MICROSOFT WORKS
MATERIALS MANAGEMENT
OIL PAINTING
CUSTOMER RELATIONS
MANAGEMENT
NETWORKING
PROGRESS
REQUIREMENTS
WORDPERFECT

اللغات

العربية
متمرّس
الانجليزية
متمرّس