Ahmed Al-Bishbishi, Electrical Engineering Projects Manager

Ahmed Al-Bishbishi

Electrical Engineering Projects Manager

Cleopatra Hospitals Group

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Electrical
Expérience
25 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :25 years, 2 Mois

Electrical Engineering Projects Manager à Cleopatra Hospitals Group
  • Egypte - Le Caire
  • octobre 2022 à octobre 2023

Job Description
Plan and manage all Electrical Engineering projects by taking a hands-on approach to the job, to ensure that verification and electrical engineering design methodologies support product and safety requirements and that development processes fall within established timelines and established standards.
Define project requirements, develop RFPs, estimate costs, obtain approvals, engineering design, procure materials, supervise construction and assist commissioning.
Organizes and monitors the work of support staff, refinery personnel, contractors and vendors during all project phases including; engineering, drafting, construction, and inspection. Testing and commissioning.
Core Responsibilities Management
* Manage the effective achievement of the Electrical Engineering unit objectives through managing the performance of the engineering team, contractors and consultants.
* Prepare and recommend the Electrical Engineering project's budget and monitor financial performance versus the budget.
* Ensure compliance to all relevant safety, security, quality and environmental management procedures and controls across the Electrical Engineering unit activities.
* Determine the requirements for developing group projects and prepare initial technical reports for new projects. Perform electrical designs, editing & reviewing of master electrical specifications & BOQS.
* Provided Engineering support to new business development activities including conceptual engineering studies complete with planning and costing of development options. Provide electrical engineering recommendations and technical support on electrical engineering reviews, strategic plans, and projects.
* Manage and follow up with consultancy offices and contractors during the stages of project implementation through setting parameters to mitigate unexpected problems.

Resident Engineer-Electrical Construction Head à ECG Engineering Consultants Group .S.A
  • Egypte - Le Caire
  • mars 2021 à septembre 2022

- Project Manager of BENYA Factory of Fiber Optic Cables (SIDIC) since February 2022 till September 2022 performing all the duties of project manager at the same time holding the position of Electrical Construction Head with the duties shown below
- Establish Construction supervision plans for all the projects under scope .
- Assign and Manage the Senior Site Engineers and site Engineers for all supervision activities . provide evaluation reports and appraisals for them .
- Follow up QA/QC procedures on sites .
- Attend periodic sites visits to ensure achievement of both progress and quality .
- Coordinate with the Resident Engineers for all technical and management issues .
- Coordinate and share the related Technical Office reviews and approval .
- Coordinate with the design sector for all related design issues and follow up RFI’s.
- Attend Follow up meetings with the clients and main contractors .
- Apply quality assurance audit and reviews for all technical and supervision reviews including some factory tests for major Electrical Equipment for witness satisfying the specification requirements .
- Provide Corrective action plans for all construction supervision defects .
For the Following Projects Scope :-
• The National Program for Plasma, 23 Center all over ARE .
• Suez Canal Zone Hospital -National Medical Insurance Program - 8 hospitals .
• Logistics Centers -(SAFAGA, Port Tawfeek ) -MTS and MI -Engineering
• Benya Offices Building - Waterway -Benya Corporation
• Benya Fiber Optic Cables Factory - Benya Corporation
• Cleopatra Mall - Cleopatra Group
• Palm Parks Phase 2 - Palm Hills Group
• Aeon Towers - 6th October City - Value Exceed one Billion EGP - Client Marakez -Egypt
• Mall of Kattamya (District 05) - Value touch 1.5 Billions EGP - Client Marakez - Egypt

Senior Electrical Engineer à ECG Engineering Consultants Group .S.A
  • Egypte - Le Caire
  • juillet 2019 à février 2021

Duties include lead group of Engineers to apply project management and construction supervision to survive the quality assurance requirements, achievement of the implementation of the Electrical Works within planned timescale. the major responsibilities including the following : -
- Study drawings, specification and contractual obligations, keeping abreast of all revisions.
- Review and approval of material submittals.
- Review and approval of shop drawing.
- Maintain daily diaries of events associated with the work on site by using ECG related form.
- Plan / schedule work priorities.
- Monitor the work being undertaken by the junior Engineers and site supervisors, taking any necessary remedial action to ensure full compliance with contract documents, specifications, method statements, policies and procedures.
- Ensure that work practices are compliant with codes, policies and procedures including ISO, local labor laws and safety procedures taking appropriate corrective action and/or reporting where non-compliance is identified.
- Record / input into data collection systems, produce standard reports to ensure project delivery.
- Produce weekly program, method statements, risk assessments.
- Monitor reviews, comments and reports on progress payments, quality control and safety.
- Prepares /initiate draft correspondence for approval and issuance by Construction Manager / Resident Engineer.
- Assist as applicable, with Pre-tender and pre-construction activities for contracts relative to the site / sites under my scope, provide input for all change orders and claims analysis, study, and give comments on Contractors Claims.
- Assist the Construction Manager / Resident Engineer in preparing the monthly progress reports.
- Reviews and approval of the As Built drawing.
- Witness and supervise the commissioning and start-up activities.
- Assist in preparing the final acceptance and completion report.
- Review and present the evaluations of contractors payments.
For the Following Projects ( Client Marakez ) :-
- Aeon Towers
The first high rise towers in 6th October city, 3 towers 22 floors sharing a podium of 2 levels including Residential Apartments and recreation facilities ( Swimming Pool, Gym, SPA…etc. ) with a luxury level . The project is addition to the land mark Mall of Arabia and complement to the (G+3) compound .
The Project Value exceeds one Billion EGP investment . Main contractor is HAC (Hassan Allam Construction ) .
- Mall of Kattameya
The Land Mark of the district 5 project which is developed by Marakez at south west of Cairo ( Egypt ) . High standard shop mall with complete facilities at the state of art for all Electrical and Mechanical . Competitive Architectural and Electromechanical Design by ECG . Luxury finishes and smart controls . with investments touches one Billion EGP by Marakez ( The fast Growing Developer), The Construction Contractor is GAMMA .

Senior Electrical Engineer à NKY Architects & Engineers
  • Arabie Saoudite - Jeddah
  • octobre 2014 à octobre 2018

Client: Ministry of Interior-KAP-2 (King Abdullah Project Phase 2) - Mega Project total value touching 26 Billion SAR
As a part of Project Management team
I had the responsibility of Electrical Head of site supervision of Jeddah area (4 sites ) . (Package Value exceed one Billion SAR
Responsibilities : -
* Manage the Electrical Site Engineers and Electrical Inspectors, guide and direct them technically to provide the most efficient site supervision and control on contractor's electrical works execution .
* Follow up the site progress and apply the necessary coordination with all disciplines at site and technical office .
* Advise the technical solutions and approve the site inspection requests technically .
* Review the weekly plans and advise the required correction .
* Review the material deliveries and technical approval of the material inspection requests .
* Review and approval of shop drawings .
* Review and technical approval of field change requests .
* Review and technical replies to the contractor's request for information .
* Apply QA/QC for all Electrical works .
* Follow up site progress and project achievements with respect to the baseline through Bi-weekly follow up meetings with stakeholders( all disciplines, client and contractor) .
* Issue the site instructions and NCR's.
* Review and technical approval of the pack up calculations of the executed works .
*Review and technical approval for the Electrical Work Notification for starting new activity or new work zone .
During the first 10 months in my employment I was in main head office until the jeddah area sites startup, during this period I have the responsibilities of the technical office as follows:-
* Design Review and design verification .
* Review and technical approval for material submittals .
* Review and technical approval for contractor's shop drawings .
* Review and technical approval for all project plans (QA/QC, DC, ...etc.).
* Review and technical replies to RFI's

Deputy MEP Branch Manager à NATCO - The National Est. For Trading & Construction
  • Arabie Saoudite - Jeddah
  • juin 2011 à mars 2014

Projects:
- General Science Labs and Auditoriums, Faculty of Engineering - KAAU - King Abdulaziz University.
- Cosmetics Warehouse, MEP, Client - Radwa Group.
- Furnished VIP Suits, MEP, Client - Private.
- Residential Podium, MEP, Client - Private.
- Zone S2- Towers H10 and H11 Jabal Omar Development Project, MEP, Client Nesma Contracting.
- Zones S3 and S4 Podium, Jabaal Omar Development Project, Electrical, Client Baytur Contracting .

Achievements :
Achievement of increasing projects turn over from 10 Millions up to 150 Million SAR /Year .
Executing Multiple MEP projects small and medium value starting from estimation, tendering, project initiation, stakeholder's meetings . up to projects’ testing and commissioning for hand over through perfect projects management criteria .

Principal Electrical Engineer /Um AL-Qurra University à SAUD CONSULT
  • Arabie Saoudite - La Mecque
  • décembre 2009 à juin 2011

Client : Um Alqura University -UQU Campus Alabdeya - Mega Project total 4 Billion SAR running projects .
I have joined the Team Which employed by Saud Consult Upon Selection done by the University Management to perform the Project Management of the running Projects and update future master plan for next 10 and 25 years.
• Lead group of engineers to implement Design Review, Shop drawing Review, Material approvals, Respond to Contractor clarification request (DCR), monitor the sites activities ensuring complete contractors commitment to Specifications, Contract and technical comments on submittals, Issue Non Compliance Reports (NCR)and Site instructions (SI). Review the Interim Payment Certificates (IPC) and Supervise Electrical Power demand studies (done by Zuhair Fayez Consultants) for updated Master Plan 10 years and Master Plan 25 years.
Type of Project Packages inside The UQU Campus:-
*Chiller Plants. *Hospital 400 bed Capacity. *Administration Building. *Medium Voltage Distribution Network. *Housing for both students and Professors (4-Stages) *Various Types of Collages, Academic buildings, stores and Medical Lab *Educational Media Center. *Health Club and Stadium.
The Campus designed to be served by Central BMS System, Central IP Telephone & Data System and Central Fire alarm System.

MEP Coordinator à Advanced Vision -CPC -SBG Group
  • Arabie Saoudite - La Mecque
  • juillet 2009 à novembre 2009

Project : JODP - Jabal Omar Development - High Rise Towers MEGA Project Value touching 8 Billion SAR
• Lead group of engineers to implement, develop and review the MEP coordination and coordinate with the designers to survive the construction needs and supervise the construction as well.

Electrical Department Manager à NATCO - The National Est. For Trading & Construction
  • Arabie Saoudite - Jeddah
  • avril 2007 à juillet 2009

Projects:-
- Pertro-Rabiegh, ARAMCO-KSA, Project include - 6 types miscellaneous purpose building.
- King Abdullah Air Defense Collage Stadium and multi-purpose halls-Al-Taef.
- Lenoture Restaurant, AL-Tahliya Street, Jeddah.
- The 4.400 project (General science Labs &Auditoriums) Faculty of Engineering KAU, Jeddah.
- Low current installations (First Fix) in King Abdullah Palace, AL-Rawdah dist. Riyadh.
- Flood Lighting Control and High Masts, King Abdullah Stadium (KAUST) Thuwal .
- Early childhood center (3 Nos. Typical Buildings), King Abdullah Stadium (KAUST) Thuwal .
- Installation of complete CCTV system in 14 airports upgraded to international grade, all over KSA, The system include both digital and IP camera types.
• Establish, develop and manage teams of engineers to implement the Engineering (shop drawings and material submittals), Procurement and construction management, plan and monitoring the cash flow, establish long term accounts with the suppliers of common resources depending on history of good deals. Managing the tendering for new projects, Attend the negotiation meetings with the clients to solve the contractual issues, ensure payments schedule, achieve new contracts and variation orders.

Site Electrical Engineer à Samir Radwan Contracting Company
  • Arabie Saoudite - Jeddah
  • juillet 2006 à avril 2007

AL-Farsi North Towers are, 3 Nos. High Rise Towers (34-Storeys ), direct on the Red Sea Beach on North Jeddah, My Responsibility is to manage The Electrical Works in The North Tower (No.1 ) and the recreation area ( Podium Level ).

Electrical Engineer à AL-Awael Consultants
  • Arabie Saoudite - Riyad
  • septembre 2004 à octobre 2006

As Consultant Representative Electrical Engineer, AL-Awael Engineering Consultants office, in the Ministry of Education, Girls Div .
I Have managed successfully as a consultant Representative 18 girls Schools different types and sizes in Qassim includes Low Voltage systems and Low Current Systems. In addition to install CCTV system in1-Girls Collage and Fire alarm System in 49 old schools, also responsible of bidding BOQ and Specs Preparations, Approval of material and contractors.

Electrical Design Engineer /Part Time à AL-Kawther industries Ltd.
  • Arabie Saoudite - Jeddah
  • juillet 2006 à octobre 2006

Electrical Design Engineer, AL-Kawther Industries Ltd, In the field of water treatment plants, designing 1500 m3/day sea water treatment plant for Arabian Cement Company (ACC) factory in Rabiegh, KSA, The Design include the sizing and selection of Electrical Equipment, Protection, Cables, Panels and Process Automation System automated By PLC and Managed by SCADA system . Also administration of panel Manufacture and Pre-Site Commissioning.

Maintenance Engineer -Technical Office à ALNASR CASTING
  • Egypte - Le Caire
  • février 2002 à septembre 2004

Main Plant produce ductile Iron pipes (range 100 to 1000 mm diameters) and its accessories by the centrifugal casting technology, which utilizing. Hydraulic system Mannesmann Rexroth oil hydraulic devices. This System is Integrated with DC-motor drives Siemens Ranges up To 100 KW and whole System is automated by PLC Siemens S5 , internal transportation is done by DEMAG cranes.
• Implement technical analysis of stoppage times in order to improve The Availability. Provide technical solutions, long term plans and procedures for Troubleshooting of any stoppage by maintenance or modifying circuitry without affecting operation and guided by know-how documents and adding new feature or parts and upgrading of control electronic parts .ensure spare parts availability of old version with local reverse engineering.

Project Coordinator - System Engineer à Private Buisiness - for Multi-M Group
  • Egypte - Le Caire
  • août 2003 à octobre 2003

I had unpaid holiday from El-Nasr Casting Company to be free for Planning for updating of control system of planner and milling machine for big work pieces, The project include Planning, Design, Selection, Installation, Calibration, Programming and Testing which all under my supervision . The result is converting the machine system from Hard wired control to the programmable logic control with the advantage of the HMI ( Human Machine Interface ) system .and installing new drives to achieve quality of surfaces. The project succeeded to achieve the quality and cost saving.

Design Coordinator à Four-Dimension ALAASER
  • Egypte - Le Caire
  • juillet 1997 à février 2002

• I worked about 3 years as a designer and a supervisor in the field of Interior Design .note that the 3-years are discontinuous periods, cause, my study.

Éducation

Baccalauréat, Electrical
  • à Ain Shams University -Faculty of Engineering
  • juin 2001

Graduation Project : Excellent

Specialties & Skills

Decision Making Skills
high computer skills
Industrial Production Lines control Engineering, Planning and Maintenance.
Using Technical software (ECODIAL - DOCWIN – DIALUX – AUTOCAD – WORD –EXCEL).
Construction Management for all Electrical Systems (MV, LV and LC) and MEP Coordination
Manage group of Engineers to implement Design and Engineering for All Electrical Systems
MEP Projects Management, Procurement, Pricing estimation, Tendering and Commercial Management.
Forecasting
Communication
Budget Compliance
Communication trainning
Business Development
Business
Facility Management
Budgeting
Inventory Management
Working Experience
Interpersonal Skills
Teamwork
Work Breakdown Structures
Cash Flow
Power Distribution
Team Management
Project Management
Skill Developement
Technical Services
Bid Process
Contract Requirements

Langues

Anglais
Expert
Allemand
Débutant

Adhésions

Egyptian Engineers sindigate
  • Electrical Engineer
  • August 2001
Saudi Council of Engineers
  • Professional Engineer
  • August 2012

Formation et Diplômes

PMP - on going Preparation (Formation)
Institut de formation:
PMI
Date de la formation:
October 2018
PLC programming ( Siemens S5 ) (Certificat)
Date de la formation:
August 2002
Valide jusqu'à:
September 2002
Control Basics and components (Hard Wired Control). (Certificat)
Date de la formation:
May 2002
Valide jusqu'à:
June 2002
DC drives (Installation and Commissioning). (Certificat)
Date de la formation:
November 2003
Valide jusqu'à:
December 2003
Integrated Maintenance Management System (Certificat)
Date de la formation:
April 2003
Valide jusqu'à:
May 2003
Practice of Electrical Maintenance Procedures on Aluminium Extrusion Production Lines (Certificat)
Date de la formation:
July 1999
Valide jusqu'à:
August 1999
Induction Furnuces maintenace and control (Certificat)
Date de la formation:
March 2003
Valide jusqu'à:
March 2003