Total Years of Experience: 17 Years, 6 Months
January 2011
To Present
Chemical engineer (Senior shift incharge )
at Emirates steel
Location :
United Arab Emirates - Abu Dhabi
Job Description:
-During the commissioning: Supervise and coordinate with the main contractor "DANIELI" for all the required modifications,
-preparation for the Standard of Operation (SOP).
- Monitoring the HMI in order to ensure the plant and processes are operating within set parameters and take the required actions for smooth operation.
- Preparing Safety Work Permits and ensure all safety measures are taken before handing over equipments for maintenance.
- Monitoring the chemical dosing system as well the quality of water in open and close circuits and prepare chemicals consumption reports.
-Prepare list with any abnormalities and follow up with maintenance during down days.
-Prepare the daily water consumption.
-Prepare the daily report from SMP&DRP&RM-WTP and air compressors.
-During the commissioning: Supervise and coordinate with the main contractor "DANIELI" for all the required modifications,
-preparation for the Standard of Operation (SOP).
- Monitoring the HMI in order to ensure the plant and processes are operating within set parameters and take the required actions for smooth operation.
- Preparing Safety Work Permits and ensure all safety measures are taken before handing over equipments for maintenance.
- Monitoring the chemical dosing system as well the quality of water in open and close circuits and prepare chemicals consumption reports.
-Prepare list with any abnormalities and follow up with maintenance during down days.
-Prepare the daily water consumption.
-Prepare the daily report from SMP&DRP&RM-WTP and air compressors.
March 2010
To January 2011
Process Design Engineer in industrial oil & gas division
at Engineering consultants group S.A
Location :
Egypt - Cairo
Preparing the following
and instrumentation diagrams (P&ID).
Process flow diagrams (PFD).
Heat calculation.
Pipe line sizing calculation.
and instrumentation diagrams (P&ID).
Process flow diagrams (PFD).
Heat calculation.
Pipe line sizing calculation.
December 2007
To February 2010
chemical engineer
at Alex fiber company which belong to Aditya Birla Group
Location :
Egypt - Alexandria
Alex fiber company (Petrochemicals Co.) which belong to Aditya Birla Group (From 1/12/2007- till now)
Job Description:
Good experience in chemical process and operation.
Good experience in PLC & DCS operation.
Good experience in process of polymerization and Dope area.
Responsible for the following areas in the new project in AFCO:
•Water treatment plant with total capacity 270 m³/hr.
•Brine chiller with capacity 1860 TR.
- Supervision for the maintenance of MYCOM compressor under the supervision of KLIMA's engineers.
- Operation of the Refrigeration cycle at the best conditions with reference to KLIMA's training.
- Supervision for pre-commissioning and commissioning of Brine Chiller.
•Cooling tower with capacity 885 m³/hr.
•Air Compressors with capacity 2000 m³/hr.
•Nitrogen plant with capacity 25 m³/hr.
Studying and make a comparison between the existing R.O unit and new one.
Co-ordination and Supervision for the design & erection works of Brine
Chiller, water treatment plant and Compressors.
Studying all process and operation of existing line.
Good experience in reviewing process diagrams (P&ID).
Job Description:
Good experience in chemical process and operation.
Good experience in PLC & DCS operation.
Good experience in process of polymerization and Dope area.
Responsible for the following areas in the new project in AFCO:
•Water treatment plant with total capacity 270 m³/hr.
•Brine chiller with capacity 1860 TR.
- Supervision for the maintenance of MYCOM compressor under the supervision of KLIMA's engineers.
- Operation of the Refrigeration cycle at the best conditions with reference to KLIMA's training.
- Supervision for pre-commissioning and commissioning of Brine Chiller.
•Cooling tower with capacity 885 m³/hr.
•Air Compressors with capacity 2000 m³/hr.
•Nitrogen plant with capacity 25 m³/hr.
Studying and make a comparison between the existing R.O unit and new one.
Co-ordination and Supervision for the design & erection works of Brine
Chiller, water treatment plant and Compressors.
Studying all process and operation of existing line.
Good experience in reviewing process diagrams (P&ID).
October 2006
To November 2007
chemical engineer
at Target Water Treatment specialists
Location :
Egypt - Alexandria
1- - Design Engineer for Water Treatment Units
(Softeners, different Filters and Deionizer)
2- Solving all Problems of Water inside Boilers, Chillers and
Cooling towers
3- Calculate the required chemical for Boilers Chillers and
Cooling towers
(Softeners, different Filters and Deionizer)
2- Solving all Problems of Water inside Boilers, Chillers and
Cooling towers
3- Calculate the required chemical for Boilers Chillers and
Cooling towers