Ahmed Elwan, Senior Instrument Engineer

Ahmed Elwan

Senior Instrument Engineer

GS E&C

Location
Egypt
Education
Bachelor's degree, ELECTRICAL , COMMUNICATION & ELECTRONICS SCIENCE
Experience
21 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 0 Months

Senior Instrument Engineer at GS E&C
  • Egypt - Cairo
  • My current job since April 2014

Responsibilities:
• Review all the documents and drawings for the project.
• Review the submitted documents which send by the subcontractor to be approved.
• Ensure the effectiveness of the contractor's quality system and the total implementation of the relevant quality control procedures, inspection and test plan (ITP).
• Approval of defined quality documents and records submitted at site.
• Provide Technical Support to the Contractor.
• Ensure that all allocated responsibilities are dealt with in accordance with agreed procedures & standards.
• Coordination between vendors to at chive the scope of work and method of statements.
• Good implement the project health, safety and environmental requirements like; Permit to Work System (PTW), Confined spaces, Safety site instructions of (Excavation, Electrical, Working on height, Hot works, lifting works...etc.).
• Ensure the most current design/Engineering document is used to complete the work and that all design changes are approved prior to implementation.
• Ensure that required design/Engineering information is available to the contractor when needed.
• Reporting progress and issues of concern to Planning, Engineering & Management and propose solutions.
• Attending daily & weekly construction & coordination meetings with the Client Sub-Contractors and vendors.
• Safety site instructions of (Excavation, Electrical, Working on height, Hot works, lifting works...etc.).

• Supervision for Installation all kinds for instrumentation, Fire &Gas Devices, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection, Inspection, Punch List.
• Ensure that project discipline engineering activities are executed within budget and schedule, while maintaining technical integrity.

Senior Instrument Engineer at ENPPI (ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES)
  • Egypt
  • August 2012 to January 2014

Responsible of instrumentation construction and inspection activities for the following:
•Ensure the effectiveness of the contractor's quality system and the total implementation of the relevant quality control procedures, inspection and test plan.
•Approval of defined quality documents and records submitted at site.
•Provide Technical Support to the Contractor.
•Ensure that all allocated responsibilities are dealt with in accordance with agreed procedures & standards.
•Coordination between vendors to at chive the scope of work and method of statements.
•Witness the instrument calibration and checks.
•Inspecting instrumentation with the client, producing check lists, punch lists and signing green light for commissioning.
•Punch list follow up and finalization attitude.

Senior Instrument Engineer at ENPPI (ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES)
  • Egypt - Alexandria
  • July 2011 to August 2012

REPRESENT GASCO COMPANY IN THE MAXIMIZATION OF C2 & C3 FROM WDGC AND LPG PLANT PROJECT AND IN THIS PROJECT
Responsible of instrumentation construction and inspection activities for the following:
•Ensure the effectiveness of the contractor's quality system and the total implementation of the relevant quality control procedures, inspection and test plan.
•Approval of defined quality documents and records submitted at site.
•Provide Technical Support to the Contractor.
•Ensure that all allocated responsibilities are dealt with in accordance with agreed procedures & standards.
•Check, Review and Approve for Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection.
•Check, Review and Approve for Installation DCS & ESD Panels, and Fire & Gas Cabinet, Cable Laying, Cable Connection.
•Coordination between vendors to at chive the scope of work and method of statements.
•Coordinate with planning department to achieve work target and avoid risk management.
•Review and approve the calibration procedure of the installation team/subcontractor (s) in accordance with the project calibration requirements and check the adequacy of the calibration site lab facilities.
•Witness the instrument calibration and checks.
•Check and Review the material receiving.

Senior Instrument Engineer at ENPPI (ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES)
  • Egypt
  • August 2010 to July 2011

REPRESENT BURULLUS GAS COMPANY IN THE DELTA DEEP MARINE
PHASE VII MAIN COMPRESSION PROJECT and in this project Responsible of instrumentation construction and inspection activities for the following:
•Provide Technical Support to Company.
•Check, Review and Approve for Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection.
•Check, Review and Approve for Installation all kinds for Gas Detectors, Fire Control Panel, Mimic Panel, Cable Laying, and Cable Connection.
•Check, Review and Approve for Installation DCS & ESD Panels, and Fire & Gas Cabinet, Cable Laying, Cable Connection.
•Coordination between vendors to at chive the scope of work and method of statements.
•Quality control inspector for site construction to hand over loops relevant for commissioning department.
•Appling for permit to work in running plant, and discussing the over ride required plan.
•Coordinate with planning department to achieve work target and avoid risk management.
•Review and approve the calibration procedure of the installation team/subcontractor (s) in accordance with the project calibration requirements and check the adequacy of the calibration site lab facilities.
•Witness the instrument calibration and checks.
•Check and Review the material receiving.

Leader Instrument Engineer at Toshiba Power System
  • Egypt
  • March 2009 to August 2010

Responsible of instrumentation construction and inspection activities for Electrical package CP-117 & Mechanical package CP-118 for the following :
•Supervision for Installation all kinds for instrumentation, Hookup, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection, Inspection, Punch List.
•Making the necessary drawings if request.
•Provides and directs the technical services functions on-site & Resolves job site technical issues encountered during execution of the project.
•Supervision for Installation the Fire alarm System.
•Installation of flushing part for fisher control valve.
•Supervision for Installation Fire Alarm System.
•Supervision for the Vendor Programming for Fire Alarm System.
•Making the commissioning for Fire Alarm System.
•Preparing turn over package documents.
•Witness the instrument calibration.
•Review all the As-Built Drawings.

Senior Instrument Engineer at TECHINT
  • Egypt
  • October 2008 to March 2009

•Review the main cable tray drawings and make the necessary modification if required for construction.
•Prepare secondary cable tray drawings.
•Review all the documents and drawings and make the necessary modification if required for construction.
•Provides and directs the technical services functions on-site & Resolves job site technical issues encountered during execution of the project.

Senior Instrument Engineer at ENPPI (ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES)
  • Egypt - Cairo
  • June 2008 to October 2008

REPRESENT KHALDA IN 24"PIPE LINE QASR ELSALAM PROJECT
Responsible of instrumentation construction activities for the following
•Check, Review and Approve for Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection.
•Check, Review and Approve for Installation all kinds for Gas Detectors, Fire Control Panel, Mimic Panel, Cable Laying, and Cable Connection.
•Check, Review and Approve for Installation DCS & ESD Marshling, and Fire & Gas Cabinet, Cable Laying, Cable Connection.
•Check, Review and Approve for Fiber Optic Cable Splicing and Testing.
•Review and approve the calibration procedure of the installation team/subcontractor (s) in accordance with the project calibration requirements and check the adequacy of the calibration site lab facilities.
•Witness the instrument calibration and checks.
•Check and Review for Block Valve Testing, Inspection.
•Check and Review the material receiving.
•Preparation / Review of Punch lists.
•Review all the As-Built Drawings.

Instrument Engineer at BP(BRITISH PETROLUM)
  • Egypt
  • March 2008 to May 2008

SAQARA OIL &GAS PLANT PROJECT Responsible of commissioning activities

Senior Instrument Engineer at CCC (CONSOLIDATED CONTRACTORS COMPANY)
  • Saudi Arabia - Eastern Province
  • July 2006 to February 2008

Responsible of Field and Bench Calibration
Smart and Foundation Field Bus transmitters
•Pressure & Pressure Differential Transmitters (Yokogawa & Rosemount)
•Flow Transmitter ( Yokogawa & Rosemount)
•Level Transmitter ( Yokogawa )
•Level Transmitter(Displacer) ( Fisher)
•Level Transmitter(Radar) (Interrogation) (Magnetrol)
•Temperature Transmitter (Yokogawa & ABB )
•Pressure & Temp. Gauges ( Wika & Ashcroft)
•Digital Pressure & Temp. and Level Indicators ( Yokogawa & Bika
•ON-OFF Valve (Fisher & Masoneilan)
•Control Valve (Fisher & Masoneilan)
•Pressure & Temp. and Level Switches (Beta & Delta & Magnetrol)

Instrument Engineer at ABB AUTOMATION
  • Egypt - Alexandria
  • September 2005 to July 2006

ALEX.FERT. (ABO_QIR IV ) PROJECT
Responsible of instrumentation construction activities for the following
•Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection, Punch List.
•Installation all kinds for Gas Detectors, Fire Control Panel, Mimic Panel, Cable Laying, Cable Connection, Punch List.
•Installation DCS & ESD Marshling, C.I Cabinet, Operator Consol, Telecommunication Cabinet and Fire & Gas Cabinet, Cable Laying, Cable Connection, Punch List.
•Installation of Air Tubing for Control Valves.
•Prepare As-Built Construction Drawings.

Instrument Engineer at DELTA GAS
  • Egypt
  • March 2005 to July 2005

Responsible for Reviewing all Instrument erection according to P&ID and Hook up.
Making the required As-Built.

Instrument Engineer at DLC (KBR HALLIBURTON, JGC AND TECNICAS REUNIDAS JV)
  • Egypt
  • May 2003 to December 2004

LNG- DAMIETTA PROJECT
Responsible of instrumentation construction activities for the following
•Supervision for Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Conduit Pipe, Cable Laying, cable connection, Inspection, Punch List.
•Supervision for Installation all kinds for Gas Detectors, Fire Control Panel, Mimic Panel, Cable Laying, Cable Connection, Inspection, Punch List.
•Supervision for Installation DCS & ESD Marshling, C.I Cabinet, Operator Consol, Telecommunication Cabinet and Fire & Gas Cabinet, Cable Laying, Cable Connection, Inspection, Punch List.
•Supervision for Fiber Optic Cable Welding and Testing, Inspection, Punch List.
•Supervision for Installation Public Address System, Telephone System, CCTV System, General Site access Control System, Inspection, Punch List.

Instrument Engineer at FIRST FOR GENERAL CONTRACTORS
  • Egypt - Alexandria
  • July 2001 to December 2001

EXPORTING ASPHALT AND SOFT FAX
Responsible of instrumentation construction activities for the following
•Installation all kinds for instrumentation, Hookup, J.Box, Local Panel installation, Cable Tray, Cable Laying, cable connection.
•Installation all kinds for Gas Detectors, Fire Control Panel, Cable Laying, Cable Connection & Gas Cabinet, Cable Laying, Cable Connection, Inspection, Punch List.

Education

Bachelor's degree, ELECTRICAL , COMMUNICATION & ELECTRONICS SCIENCE
  • at Faculty Of Engineering
  • July 2001

Specialties & Skills

Construction & Property
Instrumentation
Quality Inspection
Navis work Jet Stream.
o An Intelligent Internet (Surfer, Searching, Sending, Receiving Faxes And Dealing With Network ).
o Autocad (10,13,14,2000,2002,2004,2006,2008 )
Autoplant
Microsoft Office
Smart Plant Viewer
o Microsoft ( Windows 3x , Windows 9x , Windows NT $ 2000 ,Windows XP And Windows Vista )

Languages

English
Expert

Memberships

the Egyptian Engineering Syndicate
  • memeber
  • August 2001