Electric Engineer
samsung engineering
Total years of experience :12 years, 7 Months
*Worked in (stx engine) Korean company for electric power station install (5month), my work was supervision
installation of :
1 ) Electrical power transformers 132 \ 11 KV.
2 ) Installation of network transmission line towers capacity of
132 KV .
*Working with Samsung engineering company
(Korean company) ) In west Qurna 2 Oil field in bassrah city , the project was CPF (center process facilities ), my work was supervision installation of :
1 ) Cathode Protection System Install to protect the oil Tanks and oil Pipe line from Corrosion.
2 ) Over Head Transmission Line Tower 132 kv
and 33kv( 64 km).
*Worked in BGP (CNPC china) for survey seismic to discover the oil (1month ) , I worked in quality control inspector (Q.C)