Operation Superintendent
Schlumberger
مجموع سنوات الخبرة :17 years, 11 أشهر
Employer: Schlumberger
Project: KOC - Sabriya and East Raudhatine JPFs - Kuwait
Job Title: Operation Superintendent
- Looking after Schlumberger production facilities in North Kuwait (Sabriya and East Raudhatine.
- Interfere with the client (KOC) for production requirement and technical queries.
- Management of manpower in both sites.
- Follow up on production rates and specs.
- Contentious communication with higher management for site feedback.
- Prepare Weekly and monthly site review for management meeting, including Production, HSE,
KPIs and Audit compliance
Employer: Schlumberger
Project: KOC - Sabriya and East Raudhatine JPFs - Kuwait
Job Title: Act As Operation Superintendent
- Looking after Schlumberger production facilities in North Kuwait (Sabriya and East Raudhatine.
- Interfere with the client (KOC) for production requirement and technical queries.
- Management of manpower in both sites, specially during the pandemic and Kuwait lockdown.
- Follow up on production rates and specs.
- Contentious communication with higher management for site feedback.
- Prepare Weekly and monthly site review for management meeting, including Production, HSE,
KPIs and Audit compliance.
Employer: Schlumberger
Project: KOC - Sabriya and East Raudhatine JPFs - Kuwait
Job Title: Operation Team Leader
Occasionally Act As Operation Superintendent
Employer: Schlumberger
Project: OQ (Formerly OOCEP) - Bisat EPF - Block 60 - Oman.
Job Title: Operation team leader
- Startup Early production Facility Bisat A, for Oil and Effluents treatment and export
Employer: Schlumberger
Project: Zohr Gas Processing Plant - Petrobel & ENI - Portsaid - Egypt
Job Title: Operation Team Leader
Achievements:
Prepare Training package for ZOHR EPF operation, and implement it with Trainees from Schlumberger School in
Huston USA.
Employer: Schlumberger
Project: KOC - East Raudhatine JPF - KOC - Kuwait
Job Title: Operation Team Leader
Responsibilities:
- Startup oil Train (Separation, Desalting and Stabilization)
- Startup Gas Train (Gas Compressors, Gas Sweetening Unit and TEG Dehydration Unit)
- Startup SRU
- Startup Utilities (Effluent Water treatment, VRU, IA units, RO water units, Nitrogen Unit and
Hot Oil Heaters).
Employer: Schlumberger
Project: Zohr Gas Processing Plant - Petrobel & ENI - Portsaid - Egypt
Job Title: Shift Supervisor
Responsibilities:
- Report to Operation Manager
- Preparation of Daily, Weekly and Monthly Production Reports.
- Troubleshooting and monitor the performance of EPF (Early Production Facility)
- Keep communication with the client regarding production rates.
Employer: Schlumberger
Project: Zohr Gas Processing Plant - Petrobel & ENI - Portsaid - Egypt
Job Title: Control Room Operator
Responsibilities:
- Report to ShiftSupervisor
- Participate in commissioning and startup of the EPF
- Operate and monitor the performance of EPF (Early Production Facility)
Acid Gas Removal (AMINE unit)
Sulfur Recovery (THIOPAQ O&G)
Sour Liquid and MEG separation unit
BOP (Instrument air unit, Chilled water unit, closed drain unit, HP & LP flare, Hot oil unit)
- Safe start up and shutdown of the plant facility in accordance with equipment’s vendor
recommendations and guidelines, both in normal and emergency situations.
Diagnosing and troubleshooting plant operation
1- Report to Offshore Project Manager
2- Handover from Leighton Offshore Company.
3- Operations and Maintenance of the new facilities on board the existing client facilities (ABOT) and new client facilities (CMMP) This includes SPMs, SCADA, communications equipment, emergency power and metering
4- Maintaining communications with Al-Faw Central Control Room and the tanker
5- Continually manning and monitoring of the MTU and reporting all loading data of the 3 SPMs to project manager.
6- Interface with other agencies onboard the ABOT directly and by Radio
7- Responsible for training of localized nationals
8- Advise and assist on technical issues as required during the CMMP installation and commissioning .
9- Responsible for training of localized nationals
10- Produce clear handover notes at the end of tour
Training Courses
-Offshore Survival
“GTSC Gulf Technical & Safety Training Center - AbuDhabi -UAE
-Permit To Work with Task Risk Assessments
“Petrofac”
-CALM BUOY Single Point Mooring Operation & Maintenance
“SBM & Petrofac"
1 - Monitoring and operating the compression station equipments from control room through DCS.
2 - Responsible for controling and adjust gas quantities exported through The 36”, 90 km subsea Export Pipeline from Al Arish Gas Compression Plant in Egypt
3 - Responsible for safe start up and shutdown of the plant facility in accordance with equipment vendor recommendations and guidelines, both in normal and emergency situations.
4 - Diagnosing and troubleshooting plant operation where particular operating problem exist and apply the operating and test procedures.
the operating and test procedures.
Training:
- Compression station operation “Technip KTI”
- DCS control system “FOXBORO”
- SGT 700 (Siemens Gas Turbine-700) training. "SIEMENS"
- Gas Turbo Compressor (STC - 12 MV 8A) "SIEMENS"
- RO Desalination unit “Bono Artes”
- Fire Fighting training "Petrosafe"
- Pipe Line Modeling Software (leak detection system) "S.E.I.C"
- Frist aid and Rescue training “Petrosafe”
- OSHA General Industry ID 900163971
- OSHA Construction. ID 600388359
1-Responsible for preparing & Safe start up for all the plant
2-Field and DCS control of the compression station. Responsible for safe operation of plant, start up, shut down and carry out the trouble shootings of the plant
3-Apply the operating and test procedures in local.
4-Operate manually the field equipments in case of failure of automated signals from the DCS.
5-Monitor the plant performance and the 1st alert for any non conformity in the plant.
6-Line-up the system for the Control Room Operator in order to be able to start shut down & monitor the unit.
7-Check the system periodically for problems such as leakage & outage of equipments and report it to the maintenance department.
8-Operate desalination water unit
Training
- Compression station operation “Technip KTI”
- DCScontrol system “FOXBORO”
- SGT 700 (Siemens Gas Turbine-700) training. "SIEMENS"
- Gas Turbo Compressor (STC - 12 MV 8A) "SIEMENS"
- RO Desalination unit “Bono Artes”
- Fire Fighting training "Petrosafe"
- Pipe Line Modeling Software (leak detection system) "S.E.I.C"
- Frist aid and Rescue training “Petrosafe”
- OSHA General Industry ID 900163971
- OSHA Construction. ID 600388359
1-Preparation and applying the flushing procedure of all the plant's systems:
- Filtering system - Metering station
- Discharge cooler - Pig launcher
- Compressor suction & delivery - Utilities.
2- Equipment hand over
• Siemens gas turbine "SGT 700"
• Siemens turbo compressor "STC- 12 MV 8A"
• Air compressors "Atlas copco ZR 145"
• Diesel generator "C.T.M Italy"
• Potable water unit "Bono Artes s.p.a."
• Fire fighting sys.
3- Leak test using Air, N2 & Natural Gas
4-Testing the ESD system.
5-Follow up test procedure & preparation for Siemens (SGT 700 )
6-Testing and hands over of DCS andSCADA system.
7-Participating in Starting Up the project
Training:
- Compression station operation “Technip KTI”
- SCADA control system “FOXBORO”
- SGT 700 (Siemens Gas Turbine-700) training. "SIEMENS"
- Gas Turbo Compressor (STC - 12 MV 8A) "SIEMENS"
- RO Desalination unit “Bono Artes”
- Fire Fighting training "Petrosafe"
- Pipe Line Modeling Software (leak detection system) "S.E.I.C"
- Frist aid and Rescue training “Petrosafe”
- OSHA General Industry ID 900163971
- OSHA Construction. ID 600388359