Expériences professionnelles

Total des années d'expérience :23 years, 10 Mois

Technical Office Director à SHTB ltd development
  • Egypte - Le Caire
  • Je travaille ici depuis mars 2022
Technical office director à SHTB ltd development
  • Egypte - Le Caire
  • Je travaille ici depuis mars 2022

As a technical office director for its projects in finishing & interior design

PROJECT MANAGER THEN TECHNICAL DIRECTOR à TABARAK HOLDING
  • Egypte - Le Caire
  • octobre 2020 à mars 2022

- As a project manager for 90th avenue compound located at 5th settlement second phase project .

-Then as a technical director for TABARAK holding .

Regional Construction & Maintenance manager à AES engineering services
  • Egypte - Le Caire
  • juillet 2019 à octobre 2020

-As a regional construction & maintenance manager for EGYPT hospital initiated and operating projects (Cairo & Alex) at different phases.
-In addition to partial follow up for Hospital projects at K.S.A.

Construction Project Manager à Construction & design
  • Egypte - Le Caire
  • juillet 2018 à juillet 2019

As a project manager for AEON compound (Core and Shell project)
- Consultant: EHAF.
- Total contract value: 150 million EGP
- Buildings foot print area: 15, 000 m2
- No. of stories: 4 then pent house

Risk & Deputy Project Manager à REDCON construction
  • Egypte - El-Alamein
  • octobre 2017 à juin 2018

As a Risk & Deputy Project Manager concerned mainly with Alamen project Which consists of:
a- A tower with a podium
- Consultant: E.C.G.
- Total skeleton letter of award value: 1.2 billion
EGP
- Building foot print area: 32, 000 m2
- No. of stories: 4 /podium then 36 / tower
- Systems used: End boring piling system, slip form formwork for cores, DOKA TM formwork systems, pre-stressed concrete systems, slip form system.
b- Entertainment Area
- Consultant: E.C.G.
- Total skeleton letter of award value: 400 million EGP
- Building foot print area: 16, 000 m2
- No. of stories: 3
- Systems used: stone piling system

Quality control manager à SIAC constuction
  • Egypte - Le Caire
  • août 2009 à septembre 2017

i. 2009-2011 A zone construction manager
a- Oriana Villas Project Cairo Festival City (CFC)
- Main contractor: MIVAN ltd. Ireland
- Consultant: EHAF
- Total original contract value: 1 billion EGP / 230 villas
- No of stories: 2 / pent house / basement
- Systems used: MFE aluminum formwork, PVC insulation systems.
Number of subordinates (Engineers): 5

b- Hyde Park Malls fifth settlement (Core & Shell project).
- Consultant: E.C.G.
- Total original contract value: 150 million EGP
- Building foot print area: 30, 000 m2
- No of stories: 2
- Systems used: cup lock formwork systems.
ii. 2011-2013 As a senior cost controller
a- Polygon Mall at Beverly Hills SODIC (Turnkey).
- Consultant: EHAF
- Total original contract value: 550 million EGP
- Foot print area: 32, 000 m2
- No of stories: 3 + basement
- Examples of sub-contractors: Siemens, HAZ Marble, Alu -Nile, A- Build, France
Metal, Tech Electrique revolving doors, Epco steel doors, Intergroup soft escape,
OTAK earthing systems.
b- Two water desalination plants (just renovations).

iii. 2013-2017 As a quality control manager
a- Initiating quality control paper work for Mostorod Refinery Project.
- Owner: Egyptian Refinery Company (ERC)
- Main contractor: GS (Korean company)
- Total contract value for civil works (SIAC scope): 170 million EGP
- Project elements: 2 substations, 1 dehydrator, 1 operator shelter.

b- A senior quality control/ quality assurance manager in Mivida project owned by EMMAR and managed by TURNER (4 Packages).
- Owner: EMAAR
- Project PM: TURNER
- Consultants: EGEC, ELAMMAR, ABCG
- Total contract value: 550 million EGP
- Project packages: 4 packages (2 skeletons villas packages, 1 turnkey villas package,
1 infra structure package).
Number of subordinates (Engineers): 15
c- A quality control/ quality assurance manager at MAHMOUDIA SIMPLE CYCLE POWER PLANT, a fast track project
- Main (EPC+ Funding) contractor: PSP ELSEWEDY
- Consultant: E.C.G.
- Total contract value for civil works: 150 million EGP
- Project elements: skids, GIS building, central control building, 2turbines footing,
2fin fan cooler, 2 diffusers, 2 air intake, 2 Pcc buildings, trenches.
- Systems used: end boring piling system, mass concrete systems, steel work.
Number of subordinates (Engineers): 8
d- A quality control/quality assurance manager at BEYTI juice factory located at Nubaria. (Turnkey)
- Consultant: HOWEEDY
- Total contract value: 150 million EGP
- Building foot print area:4200 m2
- Project elements: production & warehouse building, utilities buildings, electric room
Transformers & ammonia building.
- Systems used: Twin-Tech, Vibro floor, Zamil steel, King Span, France Metal.

Construction Project Manager à Alex. for construction (TMG group)
  • Egypte - Le Caire
  • juin 2008 à août 2009

As a project manager for B6 service-building project consisting of: (Turnkey)
- Owner: TATWEER
- Consultant: E.C.G.
- Total contract value: 115 million EGP
a- Administrative Building with foot print area: 2000 m2.
b- Mosque with foot print area: 7, 500 m2.
c- Market with foot print area: 8, 000 m2.
d- Nursery with foot print area: 1000 m2.

Construction Manager à SQUARE engineering firm
  • Egypte - Le Caire
  • février 2005 à mai 2008

a- As a construction manager for Square Plaza project which is a highly finished tower as for the four seasons hotel standards (Turnkey).
- Total contract value: 17 million EGP.
- Building foot print area: 1000 m2.
- No. of stories: 11 / Basement
- Systems used: G.R.C., chilled water system, firefighting system, curtain walls for
facades, false ceiling.
b- As a zone construction manager in Madinaty Club.
- Consultant: E.C.G.
- Total contract value: 1.2 billion EGP
- Building foot print area: 32, 000 m2
- No. of buildings: 5 (2 club house buildings, 2 youth buildings +1 kids’ arena)
- Systems used: Cup- Lock system.

construction manager & owner representative à AL-Ofok Company for Touristic Investments
  • Egypte - Hurghada
  • mars 2003 à janvier 2005

a- As a construction manager for My Fair House Building which is a highly finished and furnished hotel apartments (Finishing & MEP Works)
- No. of stories: 10 / Basement
- Systems used: chilled water system, firefighting system, curtain walls for facades,
false ceiling.
b- As an Owner Representative for Zahraa Hurghada Resort.
- Total contract value: 300 million EGP
- Project elements: Hotel & 200 Chalets
- Building foot print area: 50, 000 m2

Project engineer à MOLTAKA ELKANAWAT
  • Émirats Arabes Unis - Al Ain
  • janvier 2001 à janvier 2003

a- KSA, Jeddah; as a Project Manager for:
i. Construction & Finishing works of a villa.
ii. Skeleton works of a 10 floors building.
iii. Pre-Cast wall.
iv. Studying the tender for the Egyptian council in el rehab district Jeddah
b- U.A.E., Al-Ain, Abu- Dhabi; As a Project Manager for construction works of villas

Site Engineer à Dream land in house departement
  • Egypte - Le Caire
  • juin 2000 à janvier 2001

• A zone manager for sector 4L including 7 buildings (Finishing Works only).

Éducation

Master, Risk Management
  • à Cairo UniversityCairo University
  • janvier 2015

Studies 1- Certified from IPMA (International Project Management Association).

Diplôme supérieur, IPMA certified
  • à International project management association
  • janvier 2015

Studies 1- Certified from IPMA (International Project Management Association) 2- Renewed two times

Master, MBA
  • à Cairo University
  • mai 2012
Baccalauréat,
  • à Cairo University
  • janvier 1999

with cumulative rate of appreciation Good. Major: Design of Reinforced Concrete Structures with grade Good.

Specialties & Skills

Project Management
CASH FLOW
COST CONTROL
COUNCIL
CUSTOMER RELATIONS
ENGINEERING
MANAGEMENT
MEETING FACILITATION
MICROSOFT OFFICE
MICROSOFT WORKS
PROCUREMENT