احمد محمد طه محمد يوسف النجار, Project Manager

احمد محمد طه محمد يوسف النجار

Project Manager

Luster Design

البلد
مصر - القاهرة
التعليم
ماجستير, MBA - Master of Business Administration
الخبرات
21 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 8 أشهر

Project Manager في Luster Design
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ أغسطس 2014

Responsibilities:
• Manage the delivery of the overall project documents from conceptual design phase to detailed design phase and issuing construction tender package.
• Manage project requirement and constraints from the client's team, concept designer, project operator, specialty consultants (MEP, Str. And etc…), governmental regulations and standards to achieve required quality and fulfill client and end user satisfaction.
• Manage project deliverables according to agreed scope of work
• Ensure a service is delivered throughout the Project, whilst maintaining standards in accordance with the Project Management scope of services.
• Participate in preparing Design Consultancy Services Proposals for prospected projects.
• Responsible for Workshops, Progress Meetings and Design Management meetings and ensuring the production of complete and approved design, tender and contract documentation.

Projects:
• Jeddah equestrian waterfront, Jeddah, KSA.
• Celebration Hall, Al Riyadh, KSA.

Design Manager/ Project Manager في EHAF Consulting Engineers
  • مصر - القاهرة
  • سبتمبر 2008 إلى أغسطس 2014

• Manage the delivery of the overall project documents from conceptual design phase to detailed design phase and issuing construction tender package.
• Manage project requirement and constraints from the client's team, concept designer, project operator, specialty consultants (MEP, Str. And etc…), governmental regulations and standards to achieve required quality and fulfill client and end user satisfaction.
• Integrate changes and solutions and ensure that are implemented and coordinated into the project documentation
• Direct and manage project works and ensure that everybody is doing what they should be doing.
• Monitor and control project works and constantly monitor every single thing.
• Manage project deliverables according to agreed scope of work
• Coordinating between departments and disciplines (Structure, HVAC, Plumping, and Electrical).
• Ensuring project compliance with standards and codes.


Projects:
•Al Kurayat Hotel, KSA.
•Shamla Pharmaceutical Factory, KAEC, KSA.
•Hilton Al Jubail, Al Jubail, KSA
•West Gate mall, Cairo, Egypt
•Shamla Pharmaceutical Factory, KAEC, KSA.
•Ramses Hilton Hotel Renovation, Cairo.
•Bay La Sun, King Abdullah Economic City, Jeddah (EMMAR).
•Import & Export Zone, Jadidat Arar border Gate, KSA (Consist of 17 building) governmental, administrative, hotel, fair center and stores”).
•Ministry of Justice Administration building, Riyadh, KSA.
•Ministry of Justice, Multi-Story Parking building, Riyadh, KSA.
•Al Talah Gedens 3, King Abdullah Economic City, Jeddah (EMMAR).
•Al Kurayat Hotel, KSA.
•Barwa New Cairo Residential Compound (Qatari Diar).
•Al Talah Gedens 2, King Abdullah Economic City, Jeddah (EMMAR).
•Mansour Al Malik Office building, Jeddah.
•Health care center and masjed in Residential Complex at Dorah zone, KSA.
•Nasr City Army Club hotel, Cairo.
•Euromarche mall, Cairo.
•Green Valley Hotel, Taba, Egypt.

Architectural Designer في Free Lance
  • مصر - القاهرة
  • يناير 2010 إلى يناير 2012

Create concept design and redesign of hospitals and healthcare centers:

Projects:
• Re-design Al Hosray Hospital, 6th October City.
• Re-design 6th of October International Hospital.
• Re-design Islamic center hospital at Mostorod.
• Design Oraby Hospital, Al Shourok City.

Senior Project Engineer في Project Management Department, Ministry of Health and Population, Egypt.
  • مصر - القاهرة
  • فبراير 2007 إلى يوليو 2008

Responsibilities:
• Led, Managed followed up the development and reforming of number of hospitals as part of ministry's plan to develop the general and district hospitals, aiming to enhance the quality of the health care services.
• Assessed and reviewed all delivered documents from the consultants, including; space programs, design drawings, specifications, time schedules, cost estimations, method statements, and Ensured the compliance of designs with the international standards.
• Evaluation of the hospitals, solve problems and redesign if needed.

Projects:
• Helwan General Hospital.
• El-Khalifa General Hospital.
• Om El Masryeen General Hospital.
• 15th May General Hospital. • Hosh Essa and El- khazendara general hospitals.
• Alexandria Oncology Center,
• 14 renal dialysis dept.,
• Coptic hosp., El-Tur hosp., and others

Architect في Urban Development Company (El Tanmiah El Omraniah), Seoudi & Partners
  • مصر - القاهرة
  • يونيو 2004 إلى مارس 2006

Responsibilities:
• Prepared shop drawings & M.E.P. co-ordination drawings.
• Presented and discussed the drawings with the consultant.
• Controlled the different issues of the drawings and ensured the compliance of the drawing with the specs. & B.O.Q.
• Responsible of all correspondences of on-hand projects.


Projects:
 Safir hotel renovation  El Zamalek.
 Haliberton branch - Cairo.
 Shooting club  6th October City.`

Architect في Architix Architects
  • مصر - القاهرة
  • أكتوبر 2001 إلى يونيو 2004

Responsibilities:
• Creating Conceptual Designs, 3d models, and animations.


Projects
• The Dome entertainment center, Kuwait.
• AL Sabahia entertainment center, Kuwait.
• EL Gahraa Mall, Kuwait.
• RTA administrative building, Kuwait
• AL Hamad office building, Kuwait.
• Al Sharq office building, Kuwait.
• Al Mohalian hospital, Kuwait.
• Al salimyia mixed-use building, Kuwait

الخلفية التعليمية

ماجستير, MBA - Master of Business Administration
  • في international Business School Of Scandinavia (IBSS)
  • أبريل 2014

Master of business administration was comprised: • Manager of the Future. • Organizational Behavior. • Project Management. • Corporate Communications. • Leadership. • Human Recourse Management. • Sales and Marketing.

دبلوم, Professional Program in Project Management (PRMG)
  • في The American University in Cairo
  • مايو 2007

Program include: • Management of project resources. • Project planning and controls. • Project budget & financial controls. • PRIMAVERA. • Bids & Contracts. • Quality engineering

بكالوريوس, Bsc. Architecture
  • في Faculty of Engineering, Helwan University
  • مايو 2001

bachelor of Architectural Engineering

Specialties & Skills

Design Development
Project Management
Healthcare Design
Design Management
Architectural Design
Architectural Design
Hospitals & Healthcare design according to Egyptian and American Guidelines
MEP Coordination
Project Management
Project Planning
Primavera
Quality Engineering & Quality Control
Design Development
Team Leadership
Projects Assessment and Evaluation
Project Control
Autocad
3D Modeling / 3D Max

اللغات

العربية
متمرّس
الانجليزية
متوسط

العضويات

egyptian syndicate of engineers
  • Member
  • October 2001

التدريب و الشهادات

PMP Exam Preparation (تدريب)
معهد التدريب:
French University in Egypt (FUE)
تاريخ الدورة:
November 2007
المدة:
36 ساعة
International Project Management Association certificate (IPMA) - Qualification Program (تدريب)
معهد التدريب:
EMEND
تاريخ الدورة:
August 2014
المدة:
120 ساعة
REVIT Architecture (تدريب)
معهد التدريب:
CAD MASTER
تاريخ الدورة:
February 2012

الهوايات

  • Reading
    continuously reading in motivation, leadership, business and management.