أحمد محرم, Senior Mechanical Cost Estimation, Budgeting and Control Engineer

أحمد محرم

Senior Mechanical Cost Estimation, Budgeting and Control Engineer

AlKifah contracting company

البلد
المملكة العربية السعودية - الخبر
التعليم
بكالوريوس, Mechanical engineering
الخبرات
17 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 2 أشهر

Senior Mechanical Cost Estimation, Budgeting and Control Engineer في AlKifah contracting company
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ سبتمبر 2015

1.Establish projects Cost estimation and budgeting.

2. Direct the preparation and maintenance of
project cost control status and review/verify cost control forecasts.

3. Prepare, review and issue overall client and
contractor management cost reports.

4. Establish and maintain change control systems.
Ensure proper evaluation of change notices, determining cost impact on all affected areas.

5. Support project cost monitoring, analysis and forecasting functions, Devise and distribute plans, budgets and standards of performance for every area of activity and through early detection of variations, maximize the opportunity for cost
effective corrective action.

6. Promote cost reduction and search for ways to
reduce the project cost.

7. Manage All Site Cost Control Engineers in Site.

8. Responsible to control and monitor Company
total expenditures to ensure that all projects expenditures are captured, properly recorded and kept within the project budget, monitor that actual productivity rate in site to ensure that the establish cost is beneficial to the company.

8.Coaching and Training All new Cost Control
Engineers to be familiar with Project Control and
PMO Process and procedure.

Senior technical mechnical engineer في Specialized construction company
  • المملكة العربية السعودية - الدمام
  • أكتوبر 2014 إلى أغسطس 2015

Revised & submit all material submittal.
Revised & submit all Shop drawings.
Revised & submit all Hydraulic calculation.
Coordinates between all MEP works with Arch & Structure.

Senior technical support engineer في Alexandria for construction company
  • مصر - القاهرة
  • مارس 2011 إلى سبتمبر 2014

Senior Technical Office Engineer in (Alexandria for Construction Company).


"Extension of Four Seasons Hotel & Resort Sharm El-Sheikh Egypt"

From Dec 2011 until Oct 2014 as (Full time).

Duties including: (HVAC, Plumbing & Firefighting).

Revised & submit all material submittal.
Revised & submit all Shop drawings consultant approval. Revised all & submit Hydraulic calculation consultant approval. Coordinates between all MEP works with Arch & Structure. Coordinates between all MEP works in site.
 Resort Infrastructure Contract from Sep 2013 Oct 2014:

Duties Including: (HVAC, Plumbing & Firefighting).
 Preparing tender documents.
 Revised & submit all material submittal.
 Revised & submit all Shop drawings.
 Make & submit Coordination Shop drawings with Landscape & Planting area.
 Coordinates between all MEP works in site.
(Drainage network, Chilled & Hot water network, Domestic & Firefighting network).

 Phase (2) From April 2013 until Oct 2014:

Duties Including: (HVAC, Plumbing & Firefighting).
 Revised & submit all material submittal.
 Revised & submit all Shop drawings.
 Revised & submit all Hydraulic calculation.
 Coordinates between all MEP works with Arch & Structure.
 Make & submit Coordination builder work Shop drawings.
 Coordinates between all MEP works in site.
1) Guest Room type (C) QTY (2) Nr.
2) Guest Room type (D) QTY (5) Nr
3) Guest Room type (F) QTY (2) Nr
4) Villa Type (K) QTY (23) Nr.
5) Villa Type (M) QTY (2) Nr.
6) Chalet type (H) QTY (2) Nr.
7) Chalet type (J) QTY (4) Nr.
8) Gulf Villa (N) QTY (49) Nr.
9) Miscellaneous Buildings (Arrival lobby, Restaurant, Club lounge, Fitness, Retail… etc).
 Phase (1) From March 2011 Till April 2014:

Duties Including: (HVAC, Plumbing & Firefighting).
 Preparing tender documents.
 Revised all material submittal with project specs.
 Revised all Shop drawings before consultant approval.
 Revised all Hydraulic calculation before consultant approval.
 Coordinates between all MEP works with Arch & Structure.
 Make & submit Coordination Shop drawings.
 Coordinates between all MEP works in site.
1) Employee Hotel 328 Room's.
2) Executive Housing.
3) Mosque.

Technical Support Engineer في Alexandria for construction company
  • مصر - القاهرة
  • مارس 2008 إلى مارس 2011

Technical Office Engineer in (Alexandria for Construction Company).

From March 2008 until March 2011 as (Full time).

Duties Including:
Quantity survey, Tender & Preparation submittals for the following projects: -

1) HVAC, Firefighting & plumbing Systems for Four-seasons Staff Accommodation Building

In Sharm Elshikh, Egypt.

2) HVAC System for Four Seasons Hotel in Louxr, Egypt.

3) HVAC System for Mostafa-Kaml Hotel in Alexandria, Egypt.

4) Madinty Sport Clubs fifteen water fountains.

5) Madinty Sport Club Water Tanks for Fire Protection System with capacity 500 m3 (Electric pump, diesel pump 1000 GPM@ 12.5 bar head & Jockey pump).
6) Madinty Open Air Mall Water tanks for fire protection system with capacity 300 m3 (Electric

pump, diesel pump 1000 GPM@ 12.5 bar head & Jockey pump).

7) New Cairo Water Treatment Plant With Capacity 500, 000 m3/day.

8) Madinty Sewage Treatment Plant With Capacity 160, 000 m3/day.

9) Madinty 10 Nos. Sewage Lifting Station.

10) Madinty Temporary Water Lifting Station 5000 m3.

(5 Nos. Horizontal split case pumps wit capacity 220L/sec @ 135 m head).

11) Madinty Irrigation Lifting Station 10, 000 m3.

(5 Nos. Horizontal split case pumps wit capacity 135L/sec @ 60 m head).

12) Almraya, Kingmariout & Alnobarya Sewage Lifting Station. Make & Submit shop drawing for the following projects:-

1) Madinty 10 Nos. Sewage Lifting Stations.

2) Madinty Temporary Water & Irrigation Lifting Station.

3) Water tanks For Fire Protection System.

4) Almraya, Kingmariout & Alnobarya Sewage Lifting Station.

5) Madinty Sport Club Water tanks For Fire Protection System.

6) Madinty Open Air Mall Water tanks For Fire Protection System.

Mechanical Engineer في Proservice contracting company
  • مصر - القاهرة
  • سبتمبر 2006 إلى أغسطس 2007

IAQ Executive engineering in (ProService) the Engineering Company for Projects Service.
From Oct. 2006 to July 2007.

# Project Location Year

1 Pride North America (RIG) - Offshore Egypt Dec06 To Mar07

 All building Duct & Coil cleaning.

 Replacement of 5 Nos. of Condescending units with a total cooling capacity of 45 T.R



2 SEVOTEIL El-Maadi Hotel Egypt May07 To Jun06

 Duct & Coil cleaning and system calibration for the
HVAC system serve the hotel wedding halls.

 13 Nos. AHU's maintenance, testing and balancing work

الخلفية التعليمية

بكالوريوس, Mechanical engineering
  • في Menoufia University
  • سبتمبر 2006

Mechanical engineering

Specialties & Skills

Plumbing Design
Fire Fighting
HVAC Design
Cost Control
Mechanical Engineering
Good knowledge about Project Planning
Using Elite FIER FIGHTING professionally
AutoCAD 2017 program professionally & all previous versions
Using HAP professionally.
MS Office 2016 different applications
Project Management Professional Preparation Course 40 Hr

اللغات

الانجليزية
متمرّس
العربية
اللغة الأم

العضويات

Egypt engineering council
  • Engineer
  • September 2006
Saudi Engineering council
  • Engineer
  • September 2015
Saudi council of engineering
  • Mechanical engineer
  • September 2015

التدريب و الشهادات

PMI-Risk management professional (PMI-RMP) (الشهادة)
تاريخ الدورة:
February 2024
Project management proficienal (الشهادة)
تاريخ الدورة:
January 2024

الهوايات

  • football
  • Sport
  • Reading