Ahmed Moshtohry, Project Manager

Ahmed Moshtohry

Project Manager

High Art Co

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Architecture And Building
Expérience
24 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 7 Mois

Project Manager à High Art Co
  • Egypte
  • Je travaille ici depuis avril 2017

Executed Projects:
A- Printing GPS ( APC ) El-Moasser - (10th Ramadan city).
B- Felopateer Palace Mall - (Fifth Settlement).
Scope of work:
Constructions - MEP - High Finishing & Decoration

Projects Manager à Ebtekar for Engineering Solutions
  • Egypte
  • février 2016 à avril 2017

( Member of the Board of Directors)
Executed Projects:
C- Private Apartments- (Fifth Settlement).
D- Private Villa - (Fifth Settlement).
E- Buildings N.33-36 - (Art City compound - Mokattam).
Scope of work:
Finishing & Decoration

General Manager à Innovation Vision for Plaster & Cladding Works L.L.C
  • Émirats Arabes Unis
  • septembre 2014 à février 2016

Executed Projects:
A- (Al-Arif Contracting Co.):
1- Muhaisnah 3
2- Hotel (2B+G+Mezz+12) in Port Saeed - Dubai
B- (A.B Building Contracting Co.), (Modern Building Contracting Co.):
Building (4B+G+3P+22+2HP+S.W) - Jadaf - Dubai
C- (Jscom Contracting Co.):
Building (1B+G+12+2R) - Al-Nahda 2 - Dubai
Scope of work:
Finishing

Projects Manager à Ebtekar for Engineering Solutions
  • Egypte
  • janvier 2010 à septembre 2014

( Member of the Board of Directors)
Executed Projects:
A- Main Data Center - (Ministry of Health).
B- Magales VPN - (Ministry of Health).
C- Call Center (137) - (Ministry of Health).
D- El-Monira Training Center (for IT & Statistics) - (El-Monira Hospital).
E- Data Center (Magales) - (Old Building for El-Magales El-Tbya).
F- Gates of Ministry of Health - (Ministry of Health).
G- Technical Department Requirements - (Ministry of Health).
H- Medical devices Management (Asset Mgmt. System) (Phase 1, Phase 2 )
(9 Hospitals Linked to the Ministry of Health).
I- Break Cafe - (Break for Tourism Investment).
J- Public Transport Hospital (Clinics Building)- (Public Transport Authority).
Scope of work:
Design - Finishing & Decoration - Smart & Security Solutions - UPS & HVAC
System - Fire Alarm/Fighting Systems (Fm200.UL/FM) - Furniture -
Maintenance - IT & VPN - Consultation - Project Management - Landscape.

Department Manager à ELnasr general Co
  • Egypte
  • avril 2005 à janvier 2010

(QC, Occupational Safety & Health administration, Environment management)
Internal Auditing
Executed Projects:
A- New runway (Cairo Airport).
B- New road (Cairo Airport).
Scope of work:
Asphalt - Finishing - Smart & Security Solutions - UPS & HVAC System -
Fire Alarm/Fighting Systems - Furniture - Landscape.

Site Engineer à ELnasr general Co
  • Egypte
  • octobre 2002 à avril 2005

Executed Projects:
A- Faculty of pharmacy - (Ain shams University).
B- Faculty of Dentist - (Ain shams University).
C- Tender studies (Terminal 3) - (for the extensions of the airport).
Scope of work:
Finishing & Decoration - Smart & Security Solutions - UPS & HVAC System -
Fire Alarm/Fighting Systems - Furniture - Landscape.
5
* Studies & Researches:
Studies:
a. Touristic architecture.
b. Natural power resources and traditional architecture.
c. Climate & architecture of hot regions.
d. Theories of architecture.
e. Elements of the architectural structure & design.
Researches:
1. Acoustics of the educational buildings.
2. Acoustics studies and their functioning ways.
3. Drawing some ancient architectural elements, carrying a detailed study for team
(Sultan Hassan Mosque).
4. Adverse in flounce of sun architecture on the architectural expression.
5. Analytical studies for most important elements in designing the administrative Buildings.
6. Natural ventilation and their functioning procedures.
7. Optical studies.
8. Studies of Acoustics and their functioning ways.

Site Engineer à High Art Co
  • Egypte
  • octobre 1999 à septembre 2002

Executed Projects:
Family housing complex - (Ahmed Orabi Residents).
1. (6) Villas luxurious housing with total surface area about (4000 m2
), with a total cost (5
Million) Egyptian pound.
2. A mosque accommodates (300) prayers, total cost (250) thousand Egyptian pounds
including All utilities, Imam Housing and accessories.
3. Fence related to project, total cost (250) thousand Egyptian pounds.
4. Project services building, families meeting place and a swimming pool of area (760 m2
),
total Cost (700) thousand E.P.
5. Road network, potable water and sanitary drain of networks, total cost one million E.P.
6. Underground water tanks (450 m3
) capacity.
7. Garden room building and accessories, electricity and electric generator rooms, (150 m2
).
8. Outside information office and accessories total area (150 m 2
).
Scope of work:
Excavation - Concrete - Civil - Finishing & Decoration - Smart & Security -
HVAC System - Fire Alarm/Fighting Systems - Furniture - Landscape.

Éducation

Baccalauréat, Architecture And Building
  • à Higher Institute for Architecture
  • juillet 1999

courses: QME5. by (Internal Auditing – Quality management control – Occupational Safety & Health administration – Environment management), (ISO 9001_2000,14001_2004) (OHSAS18001_2007), (OSHA).

Baccalauréat,
  • à Higher Institute for Architecture
  • janvier 1999

, ‐

Specialties & Skills

Langues

Arabe
Expert

Loisirs

  • Traveling