Technical Office Manager
The Arab Contractors (Osman Ahmed Osman & Co.)
مجموع سنوات الخبرة :15 years, 1 أشهر
6th of October Monorail
The Egyptian Islamic Culture Center in The New Capital
Tahrir Square Development
Saft el Labn Pumping Water Station & Water Network Pipelines
Rod El Farag Corridor
Saft el Labn Pumping Water Station & Water Network Pipelines
• Working as a Technical Office Engineer in “10th of Ramadan Water Treatment Plant” at “The Arab Contractors Co.” from 1\1\2012 till now.
Project details: Capacity 600000 m3/day, Civil works cost 120, 000, 000 LE.
-Working as a Site Engineer in “10th of Ramadan Water Treatment Plant” at “The Arab Contractors Co.” from 1\3\2010 till 31/12/2011.
(Project details: Capacity 600000 m3/day, Civil works cost 120, 000, 000 LE.)
-Working as a Site Engineer in “EL MARG Water Treatment Plant” at “The Arab Contractors Co.” From 1\4\2009 till 1\3\2010.
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.