Project
Pakistan Engineering Services pv
Total years of experience :9 years, 3 Months
Site supervision and inspection of material quality. To ensure safety measurement and provide awareness. To ensure and perform calculation of quantities and get approval by clients. To perform preliminary engineering responsibilities. Checking of detail designs and drawings. Testing soils and materials to determine the adequacy and strength of the foundations, concrete and steel.
Project cost: 1163 million dollars
Project # 2: Construction of Link Road From Motorway Wali Interchange to Toru Road. Package I and III
Project Including Link Road and Additional Work of Three span R.C.C Bridge, Rehabilitation of Old Bridges and scouring protection works.
I have worked on the project “Construction of Link Road From Motorway Wali Interchange to Toru Road”, which involves resource management and civil engineering works, detail survey of Road alignment, designing of Curves and super elevations, preparation of IPC’s and detail estimates.
The following projects give details of duties and main responsibilities during this period:
Project # 1: Construction of R.C.C Bridge at Village Safiabad Mardan.
Project included single span Bridge with retaining walls and 500 m approach roads on both sides.
Project Cost: Rs.370 Millions