Work Experience

Total years of experience :28 years, 4 Months

Project Manger at Orascom Construction PLC
  • Egypt - Luxor
  • My current job since August 2022

Position Held: Project Manager of Signaling System Moderation Naga Hamdi-Luxor corridor ‘’EPC’’ Project in upper Egypt with the following SOW:
The scope of this project EPC is to transfer to ENR after detailed design, manufacture, import, installation, testing, and commissioning of the Construction of new signalling & control towers divided into 13 EIS stations, & 1 CTC main Station in Luxor equipped with new signalling, telecom, SCADA, & Power cable lines to connect the EIS & CTC stations along the track line through underground trenches to serve the Installation of new track signalling equipment on the track side to assist with traffic monitoring & arranging to establish a safe train operation system through making a mutual interface with the Electronic Interlocking System (EIS), ERTMS/ETCS Level 1(ATP), Central Traffic Control (CTC) and the Communication facilities with additional facilities needed to establish such a system such as buildings and power facilities, shall be provided.
This project has 45 Level Crossing (38 “3.3 KV” and 7 “0.4 KV”) And a Total Build up area of 9, 800 m2 and Total Length of Trenches 273, 174 m (Both Sides), 148 manholes along the trenches Also, length of HDD “Water Crossing”5, 260 meters (Two main and 17 submains).

Design Office Manager at RINA Consulting S.p.A.
  • Egypt - Cairo
  • July 2022 to August 2022

The full responsibility of the final design review and the guideline for the designers of the telecom subsystems for High-Speed Train Green line Egypt.

Deputy PM for E/M & System Integration Manger at Khatib & Alami
  • Egypt - Cairo
  • January 2022 to June 2022

LRT project had been EBC contract built by CRC-AVIC Chinese Consortium, consist of 19 stations connecting Cairo with the new administrative capital equipped with the stat of art technology and CBTC signalling system to be the 1st Rail project in Egypt uses this signalling technology, and OCS 25 kV AC as first time in Egypt as well.
Position held: Deputy PM for E/M & System Integration Manger.
Systems under responsibility: Signalling - CBTC, Telecom, Centralized Control System - SCADA, Power supply HV - MV- LV, Over Head Catenary System, All MEP (FF, HVAC) works, Deport Equipment, Rolling Stock and Automatic Fair Collection.
• My Role to manage all the E/M works in the project and be sure all the interfaces & integration process is in place.
• Review the combined Integration procedure based on the contractors and operator integration process.
• Mange the EWP process based on the Trail & Integration test procedures of the Contractor & the operator and the project requirements.
• Manage the Signaling ISA process to help the employer to get the ISA certificate for revenue service.
• Manage all the E/M systems to deliver the project on the determine date by the employer.

Telecommunication Director at PICORAIL-ITALFER-EHAF JV
  • Egypt - Cairo
  • January 2021 to December 2021

Position Held: Telecommunication Director.
• Prepare the technical tender documents of CML1 ‘’Cairo Metro Line1’’ Rehabilitation Works under ITALFER-EHAF JV with involvement of EBRD Bank.
• Pricing Tender as partners ‘’PICORAIL- Orascom’’ for High-speed Train Project Egypt.
• Pricing Tender as partners ‘’PICORAIL- Orascom’’ for Beni-Souef Corridor Project Egypt.
• Pricing Tender as Subcontractor to Orascom’’ for Naga Hamdi-Luxor Corridor Project Egypt

Communication & Control Systems Project Manager at QDVC
  • Qatar - Doha
  • March 2015 to December 2020

Lusail Light Railway transit system project (LRT) has four main operating lines with a total of 28 km, 28 trams and up to 28 stations: 9 undergrounds including 1 interchange with Metro ‘’cut & cover’’ technique, 1 viaduct and 18 at grade stations including 1 interchange with Metro. The trams are provided with traction power overhead catenary system’’ OCS’’ in the underground stations and catenary-free technology APS in the at grade stations.

Position Held: Communication & Control Systems Project Manager- (Reporting to QST-Systems General Project Manager) with the following role: Full responsibilities related Communication and Control Systems packages: in terms of development & integration starting from design, installation, T&C actively, Factory acceptance & requirements validation during project phases with all the subsidiaries of the subsystems within the Consortium as Systems Integration and Systems design manger role for the CCS, TVS & ECS.
• Manage the Communication & Control Systems sub-contractor -Thales (France - Italy- Portugal) and be sure the integration with all the subsidiaries of the subsystems in the project are in place (civil, Track, signaling, power, MEP, etc., ).
• Manage project technical team and construction team during design phase and commissioning and testing T&C phases as per Systems Interface Matrix.
• Insure all the integration process are in place during project phase & following the project millstones.
• Manage the following activity with the team reporting to me & under my responsibility:
o Requirement implantation and validation in each phase in the project starting from the design to the implementation and integration.
o RAM’s & Systems Safety and security.
o Verification and Validation (V&V) cycle.
o Configuration management for all the changes.
o Operation and maintenance procedures including the training manuals.
o Systems Quality management.
o Ensure the Integration process with all Consortium subsystems is in place and fulfilled.
I was responsible to follow all the above activity starting from verification & validation in each phase in the project starting from the design to the implementation and integration.
• All ISA comments & Concerns response was managed by me with my team to provide suitable response according to the standards and project requirements.
• Mange the Integration and interfaces with all the involved parties in the consortium (Civil, rolling stock, Power, MEP, signaling, etc..).
• Managing all Contractual disputed items, budget, planning and identify the critical millstones & priorities for the Project.
• Starting from September 2018 I was nominated to manage as well Environmental Control System Package ECS.
• Starting from November 2019 I was nominated to manage all systems within Systems departments under the General project manager in LRT project (Tunnel Ventilation System TVS & Ministry of Interior & Qatar Armed Forces projects).
• Starting from July 2020 I was nominated to be The Systems Manager for LRT Consortium to manage MOTC and MOI approvals and issues, in addition to all Telecommunication issues in LRT project with the Client and the Subcontractors.

Middle East Director at AUTOLOCATOR –Megapage Ltd
  • Egypt - Cairo
  • April 2012 to February 2015

Position Held: Middle East Director reporting to CEO.
• My role is to establish a branch for the new Telematics service business in Egypt and in the near future to use this branch as Middle East call center for all the Arab countries.
• Managing and prepare the budget and business rules strategy.
• AUTOLOCATOR is the most successful brand in the Telematics service provider in Russia and the CIS country and owned by Megapage Ltd.
• We are an international Telematics Service Provider to major automotive brands adding value to their cars, offering Insurance Telematics with Collateral Management System with financial institutions and more.

System Integration Manger (Project Manager) at Raya Smart Buildings
  • Egypt - Cairo
  • June 2013 to January 2014

Position Held: System Integration Manger (Project Manager)- reporting to Executive director of RFM and CEO of RSB
• My role is to manage all the low current projects in Raya Smart Buildings, in addition I was the project manger for Galleria 40 Mall and administrative offices in 6 October city.
• I was managing the maintenance actively for all the building owned by Raya smart building and provide the services for the customers occupies the buildings.
• We are working as system integrator with Siemens and Jonson Controls International.

Communication and Rail Systems Integration Lead Engineer at SYSTRA/PARSONS (The Engineer)
  • United Arab Emirates - Dubai
  • August 2006 to December 2011

The Dubai’s Metro project consists of two metro lines red line and green line equipped with the latest art of technology and Dubai Metro was the 1st driver less metro the middle east which composed of:
Red line: 29 stations consist of 4 underground 24 Elevated and 1 at grade with 2 depots and 44 trains.
Green line: 20 stations consist of 8 underground 12 Elevated, 25 trains
Each line has 2 stations are common: transfer stations shared.

Position Held: Communication and Rail Systems Integration Lead Engineer - Dubai Metro
Responsibilities and duties included:
• Tender Preparation: Participate in tender perpetration for Green Line extension.
• Reviewing the detailed design documents of the communication systems: MSN (Multi Service Network), FON (Fiber Optic Network), TN/ECB (Telephone Network/Emergency Call Button), IAS (Intrusion Alarm System), PAS/PIS (Public Address system / Passenger Information System) and TDS (Time Distribution System) for the entire Red & Green lines.
• Insuring all the integration process are in place for the subsystems under my responsibilities.
• Review and approve the ICD interface control documents.
• Handling the design resolving issues meetings and workshops with the contractor and the client.
• Supervising the site acceptance tests and reviewing the test reports for the different communication systems and the integration test with the other sub-systems.
• Handling the interface documents/ matrix between communication systems and all other systems.
• Review and approve the material/cabinets /cables/accessories for communication systems.
• Review the combined services drawings (CSD).
• Have in depth experience in communication systems and SCADA. Performed coordination and interface related activities with signaling and power supply systems from design through to testing and commissioning which enables me to play integration role.
• Participating in Factory Acceptance Test (FAT) for:
 MSN FAT in Milan Italy at Alcatel-Lucent Italy, for MSN Multi Service Network from 10/12/2007 to 14/12/2007.
 TDS FAT in Toreboda Sweden at Westerstrand, for TDS Time Distribution System from 10/1/2008 to 11/1/2008.
 TN FAT in Brest France at Alcatel Business System, for TN Telephone Network from 14/1/2008 to 16/1/2008.
 IAS FAT in UAE at Tyco fire & Security, for IAS Intrusion Alarm system from 21/1/2008 to 22/1/2008.

Deputy Project Manager at Alcatel Italy -SPA
  • Egypt - Cairo
  • November 1996 to July 2006

The line is 29 km with 13 km are in tunnels. It serves 20 stations, of which 12 are underground with 2 interchange stations, 6 at grade, 2 viaduct and 1 depot.

Positions Held & Job descriptions:

• Deputy Project Manager (From January 2005 till July 2006)- attending all the client meeting and prepare the monthly invoices and reports.
• Maintenance Manger & Technical manager (From August 2003 till July2006) - follow up the maintenance activity and arrange monthly planning, prepare the monthly Maintenance report and attend maintenance meeting with the client and subsidiaries of the subsystems in the project to ensure that all integration process is in place.
• Testing and commissioning Manger (From August 2003 till July2006) - prepare all the T&C documentation and testing tools for the T&C teams, maintain the T&C activity they are performed as per the approved schedule and project millstones.
• Deputy of the technical & maintenance manager (From January 2000 till July 2003) - follow up all the site maintenance activity and manage the maintenance team 24/7.
• Spare Parts Department Manger (From January 1997 till December 1999).
• Project engineer and Depot team leader: Commissioning, startup, and maintaining of telecommunication systems in Greater Cairo Metro Project, manager and maintain all systems in the depot (From November 1996 till December 1999).
o Cables laying, Equipment installation, Systems start up and systems Commissioning supervision.
o Preventive & corrective Maintenance.
• Management of Spare Parts Department (responsible of handing over & test all spear parts of Cairo greater metro L2 of all our systems).
• Responsible of preparing all Test Reference Systems (connection, start up, & training of the ENR Engineers of this equipment).

Training of the following Systems:
• Direct Telephone System (ALCATEL TF-1401)
• Transmission Network System (ALCATEL 1513MX 2Mbit/s Flexible Multiplexing)
• Clock System (BODET)
• Train to Ground System (Radio System ALCATEL 9890)
• Fire detection System (NOTIFIER AM 2020)
• Public Address System (PHILIPS SM-40)
• CCTV System (PHILIPS LDH 5304)
• PABX BOSCH (I33x-E)
• Intercom System (ALCATEL)
• Supervisory System (ALCATEL)
• Recording System (Racal ICR-64)

System under responsibility:
• All the Telecom systems of Cairo Grater Metro line 2.
• Store Management.

Tender (2005-2006) and design documents Preparation:
• Participate in tender perpetration of several projects (The new Terminal 3 in Cairo airport, San Stefano Grand Plaza project in Alexandria, Cairo Greater Metro Line 3 and Dubai metro project.
• Prepare all the design, operation and Maintenance documents required for the Cairo Greater Metro line2.

Maintenance Engineer at Servotronics
  • Egypt - Cairo
  • April 1996 to October 1996

• Working as maintenance engineer in Maintenance Hardware to the electronic cards PCB.

Project Engineer at Giza Project Company
  • Egypt - Cairo
  • August 1994 to January 1995

Job descriptions: project Engineer: responsible for the installation/ startup/ commission of fire alarm, fire fighting and security systems in different projects in 6th October City:
• Land of Culture and Sciences (6th October University).
• Beutux Misr Factory.
• Irrigation Research Center.

Tender and design Preparation:
• Participate in tender perpetration of some security project (Fire alarm system for administration building Bristol-Myers Squibb Biopharmaceutical Company in Cairo and Access/ attending control system for Reuters news agency in Cairo).
• Prepare the complete design and the required installation drawing for the fire alarm system projects (Land of Culture and Sciences -6th October University and Beutux Misr Factory).

Education

Bachelor's degree, B.Sc. in electronics and computer
  • at Higher Technological Institute - Egypt
  • August 1994

• 1989 – 1994 B.Sc. in electronics and computer from Faculty of engineering-HIGHER TECHNOLOGICAL INSTITUTE tenth of Ramadan city Grade: good. • Project: spectrum analyzer Design and produce control circuits to convert the oscilloscope to Spectrum Analyzer.

Specialties & Skills

Organised
Interfacing
Integration
Telcommunications
Telecom & Control Systems Design
Client Representative
Rail Systems Integration
Problem Solving
Project Management

Languages

Arabic
Native Speaker
English
Expert

Hobbies

  • Reading , Listen to music & Play Squash.