أحمد شتلة, Senior Projects Manager

أحمد شتلة

Senior Projects Manager

EUROPTIMA

البلد
مصر
التعليم
بكالوريوس, SC. In Electric Power & Machines Dep
الخبرات
20 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 7 أشهر

Senior Projects Manager في EUROPTIMA
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ فبراير 2016

• Projects management.
• Build and develop the projects teams.
• Loan monitoring report.
• Pre/ Post contract & cost control activities.
• BOQ pricing and market testing.
• Follow up site construction activities.
• Preparing Tender and Contract Documents, Including Bill of Quantities.
• Identifying, Analyzing and Developing Responses to Commercial Risks.
• Review quantities take-off prepared by assistants and quantity surveyors.
• Reviewing & evaluation contractor’s variations.
• Reviewing Contractors offers.
• Review& approval monthly payments from the client& to the sub-contractors.
• Assist the project manager in negotiations related to cost with the project manager organization, client and consultants.

Senior Electrical Engineer “Supervisor” (Consultant) في (EMDEG) Electromechanical Design ENGINEERING Group. CAIRO, EGYPT.
  • مصر - القاهرة
  • سبتمبر 2012 إلى فبراير 2016

Responsibility:-
Supervision of several systems \[(Cables networks), (Lighting -Power System), (Low current systems), (Infrastructure networks), (Medium voltage network)\].
Follow up the site construction activities.
Follow up the time schedule for the project items by daily and weekly reports.
Approving all materials and samples.
Joining the client & contractor in initial and final handing-over documents.
Review and approve the As-built drawings prepared by the contractor/s, as well as the operation and maintenance manuals for E/M equipment.
Check and carry out all required tests for activities where applicable, for compliance with drawings, specifications and standards.
Technical reports preparing.
Organize meetings between the client and contractor/s.

MEP Team Leader Senior Electrical Project Engineer في (EMDEG) Electromechanical Design Engineering Group. Cairo, EGYPT. (Consultation)
  • مصر - الإسكندرية
  • مايو 2013 إلى يناير 2016

 MEP site team leader
 Supervision & follow up the site construction activities.
 Coordinating the effort and resources of the team and coordinating with other stakeholders.
 Planning, scheduling, conducting and coordinating detailed phases of project work.
 Follow up the time schedule for the project items by daily and weekly reports.
 Approving all materials and samples.
 Review and approve the As-built drawings prepared by the contractor/s, as well as the operation and maintenance manuals for E/M equipment.
 Joining the client & contractor in initial and final handing-over documents.
 Check and carry out all required tests for activities where applicable, for compliance with drawings, specifications and standards.
 Technical reports preparing.
 Organize meetings between the client and contractor/s.

Senior Electrical Engineer “Supervisor” (Consultant) في &(EMDEG) (J.V [(Egis-Rail)
  • مصر - القاهرة
  • مارس 2010 إلى سبتمبر 2012

Responsibility:-
Supervision of several systems \[(Cables networks - Bus way System), (Lighting -Power System), (Generators), (Earthing system), (Low current systems), (Earthning protection System), (Infrastructure networks), (Medium voltage network) & (Elevators-Escalators)\].
Joining the client & contractor in initial and final handing-over documents.
Follow up the site construction activities.
Follow up the project (scheduled, scope, cost& budget).
Revising the design drawings and putting all the necessary comments on them.
Approving all materials and samples.
Technical reports preparing.
Review and approve the As-built drawings prepared by the contractor/s, as well as the operation and maintenance manuals for E/M equipment.
Check and carry out all required tests for activities where applicable, for compliance with drawings, specifications and standards.
Check of workmanship provided on site and their work schedule.
Attend co-ordination meetings between the Client, the project manager, the contractor and other parties involved in or affecting the construction and implementation of the project.

Senior Project Engineer (Construction) في Air Technic A/C Systems Co., LLC, (ATC), Dubai, UAE.
  • الإمارات العربية المتحدة - دبي
  • فبراير 2007 إلى مارس 2010

Responsibility:-
Supervision of site activities such as erection, installation, testing and commissioning in close co-operation with and under the supervision of general site Manager or his representative and client.
Follow up Sub-Contractors and Coordinate between Them.
Preparing shop drawings for all projects \[(Cables networks - Bus way System), (Lighting -Power system), (Generators), (Earthing system), (Low current systems), (Earthning protection System)\].
Technical Submittal Preparation and Procurement Process.
Preparing shop drawings, As built &coordination works.
Preparing the handing-over documents.
Preparation of inspection reports, certificates, progress reports and site correspondence.
Construction & supervision for the installation progress and commissioning to the consultant for Coordination between Electrical activities and other trades (Mechanical, structural and architectural).
Preparing and updating of drawings submittals log.
Working in tenders: pricing of several projects.
Study of new projects and determine the project budget and its sailing price per item by making contact with sub contractors &suppliers.
Prepare Inquiry documents about commercial Standards, Technical Specifications, and BOQ’s And Drawings.
Working as a designer of interior works \[(Lighting -Power System), (Earthing systems)\] for several projects (villas, offices & residential buildings, Commercial buildings ….etc).
Participation at meetings.

Electrical Engineer (Construction) في High Dam for Electric and Industrial Project Company (HIDELECO) CAIRO,
  • مصر - القاهرة
  • أكتوبر 2003 إلى فبراير 2007

Responsibility:-
Supervision of several activities (Infrastructure net work \[High voltage Transmutation line& Medium Voltage Networks\].
Supervision of site team.
Supervision of site activities.
Follow the time schedule for the project items by daily and weekly reports.
Participation at meetings.
Technical reports preparing.

الخلفية التعليمية

بكالوريوس, SC. In Electric Power & Machines Dep
  • في Faculty of Engineering, Zigzag University
  • أكتوبر 2002

B.SC. In Electric Power & Machines Dep. Faculty of Engineering, Zigzag University 2002 Project name Electrical power flow Project Evaluation: Excellent

Specialties & Skills

إدراة فنادق
Residential Projects
Commercial Projects
Residential Buildings
Commercial Buildings
Tendering & BOQ Works Preparing shop drawings & Material submittals. Preparing and updating of
Managment
MEP Quantity Surveyor
الرسم

اللغات

الانجليزية
متوسط

العضويات

Egyptian syndicate of professional engineers
  • 48/7262
  • November 2002

التدريب و الشهادات

PMP-Project Management Professional (تدريب)
معهد التدريب:
CAMPUS Training & Consulting center
تاريخ الدورة:
December 2010

الهوايات

  • Reading