Ahmed Sukar, Project Manager

Ahmed Sukar

Project Manager

M/s Arabian Construction Company

Lieu
Émirats Arabes Unis - Al Ain
Éducation
Baccalauréat, Civil Engineering
Expérience
20 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 8 Mois

Project Manager à M/s Arabian Construction Company
  • Émirats Arabes Unis - Al Ain
  • Je travaille ici depuis août 2018

Projects Handled:
• Aug 2018 - Present: Wahat Alzaweya Development Roads and Infrastructure works (Alain)
• Contractor: M/s Arabian Construction Company
• Client: Wahat Alzaweya
• Scope: Storm water network, sewerage networks, Irrigation network, Potable Water network, Telecommunication network, Road Crossing Ducts and Road works

Career Accomplishments & Accountabilities:
• Identifying, developing, implementing and maintaining regulations, processes, methodologies and systems for the effective management of various infrastructure projects. Skilled in handling multiple competing project priorities; scheduling and achieving objectives on schedule within budget.
• Ensuring that the project ongoing in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards.
• Supervising complex highway utilities and structures including infra structural networks such as drainage, sewer, storm water, portable water and irrigation.
• Pushing contractors, subcontractors and consultants for timely completion of works. Controlling quality, progress, cost and safety of works.
• Coordinating the use of available equipment, materials, and personnel to obtain maximum effectiveness and economy.
• Highly skilled in documenting project progress through quality control inspections, field logs, photographs, records, communication, meeting minutes, etc.
• Leading project executions as per the stipulated norms, design guidelines and within the estimated cost, timeline & quality. Monitoring required changes in designs, anticipating any possible delays and taking advance actions.
• Acting as a specialist in the application of advanced concepts, principles, techniques and procedures for an assigned area of responsibility.
• Planning, directing and coordinating site activities, carrying out on-site inspections and ensuring quality implementation of constructions as per specifications, drawings and method statements
• Preparing all associated calculations, reports and spreadsheets, ensured the project runs to time/budget and is safe to work on.
• Coordinating with the Clients, Contractors and major asset owners and stakeholders observing a policy of open communication to reduce risk significantly and flawless execution
• Ensuring that projects are designed, built and certified to the required standards and costs are rigorously managed and expenditure is recorded accurately at all times.
• Effective team builder who can motivate and create ownership concept among team members with transparent Supervision techniques.

Project Manager à M/s Fibrex
  • Émirats Arabes Unis - Abu Dhabi
  • juin 2016 à juillet 2018

• Jun 2016 -Jul 2018: Alreef 2 (Abu Dhabi)
• Contractor: M/s Fibrex
• Client: Manazel
• Scope: Storm water, sewerage networks and road works

Project Manager à Ammana
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2015 à mai 2016

• Apr 2015-May 2016: Design Exclusive Storage Facilities at Western Region
• Contractor: Ammana (Abu Dhabi)
• Client: Adnoc
• Scope: Earth work (excavation and backfilling), Road Working, Kerbstone, Interlock, Road marking, road signs, Storm water network, Sewerage network).

Project Manager à Drake & Scull
  • Émirats Arabes Unis - Abu Dhabi
  • novembre 2014 à avril 2015

• Nov 2014 - Apr 2015: 3000 TR Chiller Plant in Masdar City
• Contractor: Drake & Scull
• Client: Masdar
• Scope: Build two Substations buildings and construct a pumps room

Construction Manager à M/s Fibrex
  • Émirats Arabes Unis - Abu Dhabi
  • octobre 2013 à octobre 2014

• Oct 2013 - Oct 2014: Private Property Management (Abu Dhabi)
• Contractor: M/s Fibrex
• Client: Private Property Management
• Scope: All infrastructure work (storm waters, sewerage, water Supply, cable lying, chilled water, irrigation, roads, kerbstone, footpath), Build 9 Substation rooms.

Construction Manager à Al Habtoor Murray & Roberts JV
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2012 à octobre 2013

• Jan 2012-Oct 2013: Zayed University (Abu Dhabi)
• Contractor: Al Habtoor Murray & Roberts JV
• Client: Mubadala
• Scope: infrastructure works (storm waters, sewerage, water Supply, chilled water, irrigation, roads, kerbstone, footpath).

Project Engineer à Al Habtoor Murray & Roberts JV
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2010 à janvier 2012

• Jan 2010- Jan 2012: J.W. Marriot Resort & Spa (Site 276) (Road and Civil Works) (Abu Dhabi)
• Contractor: Al Habtoor Murray & Roberts JV
• Client: Abu Dhabi National Hotels
• Scope: Infrastructure works (storm waters, sewerage, water supply, irrigation, roads, kerbstone, footpath)

Project Engineer à Al Jurf Development Projects LLC.
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2008 à janvier 2010

• Jan 2008 - Jan 2010: Sheikh Zayed Grand Mosque
• Contractor: Al Jurf Development Projects LLC.
• Client: Dept. of Municipalities & Agriculture
• Scope: infrastructure works (storm waters, sewerage, irrigation).

Site Engineer à Arabtec/Efeco Construction (L.L.C)
  • Émirats Arabes Unis - Dubaï
  • juin 2006 à janvier 2008

• June 2006 -Jan 2008: Mohammad Bin Rashid Housing Program-Al Warqah Construction of 544 Villas (Dubai)
• Contractor: Arabtec/Efeco Construction (L.L.C)
• Client: Emaar
• Scope: Infrastructure works (storm waters network, sewerage network, roads works, kerbstone, footpath)

Site Engineer à Al Habtoor Engineering
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2005 à mai 2006

• Jan 2005 - May 2006: Waterfront Residential Complex (236 villas) at Officer's City-Road Works (Abu Dhabi)
• Contractor: Al Habtoor Engineering
• Client: FGB
• Scope: Infrastructure works (storm waters network, sewerage network, roads, kerbstone, footpath, Road crossing ducts, Telecommunication)

Site Engineer à Target Engineering
  • Émirats Arabes Unis - Abu Dhabi
  • octobre 2003 à décembre 2004

• Oct 2003 - Dec 2004: NEB Phase 1 development (Administration, Accommodation and Police Camp (Abu Dhabi)
• Contractor: Target Engineering
• Client: Adco
• Scope: Road Works (Asphalt, Subbase, Subgrade, Excavation and Backfilling, Storm water network, Sewerage network, Telecommunication)

Éducation

Baccalauréat, Civil Engineering
  • à University of Kufa
  • juin 2003

Specialties & Skills

Engineering
Site Management
Project Management
Construction & Property
Civil Engineering
Microsoft Project
Problem Solving
Highways, Roads, Bridges, Utilities and Structures
Risk Assessment
Contracts Management & Negotiations
Data Base Management Systems for budgeting and cost monitoring
P& L Accountability
Project Management
Civil Engineering
Budgets & Forecasting
Lean Principles
MS Office
Design Review
AutoCad
Team Management/ Leadership
Multi-Site Operations
Planning & Coordination
Cost Controls
Quantity Survey
Industry Codes & Standards

Langues

Arabe
Langue Maternelle
Anglais
Expert