Total des années d'expérience: 35 Années, 7 Mois
décembre 2015
A décembre 2021
IMAR, Engineering Consultants
à IMAR, Engineering Consultants
Lieu :
Arabie Saoudite
(KSA) (from 05/12/2015 until 15/12/2021), Electrical Consulting
Engineer Site Manager at the Ministry of Finance in a Power Plant Project new Installation
Consists of an 8th Diesel Generators sets every one 4.2MW/13.8KV/60Hz, 900rpm and its all Auxiliaries.
Engineer Site Manager at the Ministry of Finance in a Power Plant Project new Installation
Consists of an 8th Diesel Generators sets every one 4.2MW/13.8KV/60Hz, 900rpm and its all Auxiliaries.
mars 2014
A décembre 2015
Electrical Consulting engineer
à Consulting Offices (Alzaid)
Lieu :
Arabie Saoudite
(from 01/03/2014 until 1/12/2015) Electrical Consulting engineer at the
Ministry of Health (Hospital) and Ministry of Higher Education. At the Following : (M.V and LV
Power Plant), Generators, Transformers, ATS, RMU, MDB, EMDB, UPS, Earthling Sys. Lightning Sys.
And (Low Current) Like: I.P Telephone Sys., F.A.S., Data Sys. C.C.TV, Public Address Sys. M.A.TV,
C.A.TV, Clock Sys. & B.M.S. .
Ministry of Health (Hospital) and Ministry of Higher Education. At the Following : (M.V and LV
Power Plant), Generators, Transformers, ATS, RMU, MDB, EMDB, UPS, Earthling Sys. Lightning Sys.
And (Low Current) Like: I.P Telephone Sys., F.A.S., Data Sys. C.C.TV, Public Address Sys. M.A.TV,
C.A.TV, Clock Sys. & B.M.S. .
novembre 2008
A mars 2014
Site Project Manager
à Al-Taif for Installation, Operation and Construction Co.
Lieu :
Arabie Saoudite - Riyad
Project manager Responsible for operation
And maintenance and installation, (KSA)(from 08/11/2008 Until 08/03/2014) In Olympic Committee
And Sport Cities & Swimming pools, Soccer Fields and MV Switchgear & Low Voltage DB. In the Sites
Of the General Presidency for Youth Welfare.
And maintenance and installation, (KSA)(from 08/11/2008 Until 08/03/2014) In Olympic Committee
And Sport Cities & Swimming pools, Soccer Fields and MV Switchgear & Low Voltage DB. In the Sites
Of the General Presidency for Youth Welfare.
avril 1996
A avril 2008
Electrical Maintenance Engineer
à National Telecommunication Co. Ltd.(Natel)& Delta Electromechanical Co.
Lieu :
Arabie Saoudite - AlQasim
Electrical Maintenance Engineer of Power Plant, (KSA) (from 10/04/1996 until 30/04/2008) Overseeing maintenance Programs and operation for Television Broadcasting Stations project (TV Station) to transformers, switch gear(ATS's), generators Sys.(2Generators Caterpillar each 900KVA /380V /3ᴓ), and its control panels, Aux. etc., Uninterruptible Power Supply 60KW(UPS), Studio Control Lighting, Low Voltage Device, Water pumps, Air Compressors, Chillers(3x120Ton's), AHU's, FCU's and all related accessories.
octobre 1992
A novembre 1994
Electrical Maintenance Engineer in MV Power Plant
à Iman Trading & agencies & contracting Co
Lieu :
Arabie Saoudite - Alquryat
Electrical Maintenance Engineer in MV Power Plant, (KSA) (from 23/10/1992 until 30/11/1994) Operation and Maintenance of Radio Broadcasting Stations Affiliated to the Ministry of Information in the field of Generator power station 11KV. Each
Generator 3.5MVA (6 generators -diesel engine, 4Gen. Synchronizing), (Oil, SF6) CB's & Operation, Maintenance and Calibration of Protective Devices & Transformers & Batteries and related Accessories.
Generator 3.5MVA (6 generators -diesel engine, 4Gen. Synchronizing), (Oil, SF6) CB's & Operation, Maintenance and Calibration of Protective Devices & Transformers & Batteries and related Accessories.
mars 1990
A janvier 1992
General of Electrical Engineer (Hospitals)
à Walled Alyahyai establishment for trading
Lieu :
Arabie Saoudite - AlQatif
General of Electrical Engineer (Hospitals), (KSA) (from 1/3/1990 until 31/1/1992) Head of the Department of electrical and electronics of the of Saudi hospitals : In Generators, switch gear, Automatic Transfer Switches (ATS), control panels, Low Current devices, elevators, …etc.
octobre 1986
A janvier 1990
Electrical Power Engineer
à General Company for Food Trade: Electrical Power Engineer
Lieu :
Irak - Bassorah
(Iraq) (from 26/10/1986 until 24/1/1990) Responsible Department Working and Operating Complex Refrigerated Warehouse and Frozen and Consequently: Freezing and Cooling Stores (10 Stores, each capacity 2000tons), Cooling Towers, Water Pumps, 4Electrical Generators (Pillar each 500KVA), ATS's, Transformers (4x500KVA), MV Switch Gears, Lightings, All control panels and all related accessories.
mars 1982
A janvier 1985
Electrical maintenance engineer in Glass factory
à El-Nasr Company for electric and electronic "equipment's" Philips”
Lieu :
Egypte - Alexandrie
Electrical maintenance engineer in
Glass factory, (Egypt) (from 27/3/1982 until 24/1/1985). Installation and Overall there are two Generators
(Cummins each 500KVA /380V /3ᴓ), ATS's, Electric Crane, Air Compressors, Water pumps &
Temperature, levels, Pressures Transmitters and Controller of Glass Furnaces and all related accessories.
Glass factory, (Egypt) (from 27/3/1982 until 24/1/1985). Installation and Overall there are two Generators
(Cummins each 500KVA /380V /3ᴓ), ATS's, Electric Crane, Air Compressors, Water pumps &
Temperature, levels, Pressures Transmitters and Controller of Glass Furnaces and all related accessories.
Partager sur Facebook
Partager sur Twitter
Partager via Email