Total des années d'expérience :14 years, 9 Mois

Executive Director à BIM Works LLC
  • Egypte - Le Caire
  • Je travaille ici depuis septembre 2021

✓ Projects study, tendering, Pricing, estimation, and quotation.
✓ BIM team sourcing, interviewing, selecting.
✓ Point of contact with client (contractor, consultant) technical and BIM team.
✓ BEP preparation, BIM workflow as per Iso 19650, RIBA workflow.
✓ Mentorship and training of the Junior BIM Stuff.
✓ Team production planning, setting goals, supervision, Model QA/QC.
✓ Set KPI for every individual in order to control the collective output.
✓ Software/ hardware test and selection as per projects requirements.
✓ Quality Check for all produced models, providing feedback for service providers.
✓ Progress Follow-up and Prepare commercial/ Technical offers

BIM Consultant à Freelance
  • Egypte - Le Caire
  • janvier 2021 à septembre 2021

Projects Estimation and quotation

Technical BIM manager à Arabtec Construction
  • Émirats Arabes Unis - Dubaï
  • janvier 2019 à décembre 2020

Our main scope was landscape zone C-38 including the water feature- underground utilities, with different traffic requirements (pedestrians/ light vehicles/ fire truck route) giving the complexity of design major modification has taken place to consider the exits- building levels
● I originated the BIM execution plan elaborating my company’s approach to satisfying the end-user requirements directed and coached the team to Deliver the fully integrated BIM Level 2 Model in The Project which supports different BIM uses such as 4D, 5D, ABS, sustainability, asset management, record model.
● I outpaced the productivity (quality and quantity) of technical submittal by removing duplication in tasks, delegating coordination tasks to the team, and identifying a clear scope for each individual.
● I cooperated with the QS team to validate the extra excavation quantities giving the required excavation slopes.
● I slashed the changes fees with suppliers, service providers based on contract terms which result in a reduction of fees up to 40% of the original Variation order value.
● I collaborated with conceptual designers and design consultants to forge a customized solution to overcome the project conditions/ solve the level coordination issues for such iconic projects.

Structural BIM coordinator and CUC Lead Engineer à Arabtec Construction
  • Bahreïn - Manama
  • novembre 2016 à décembre 2018

In this project, We had 4 main items (CUC service building for utilities- Terminal building- viaduct and West Car park)
I had few challenges that we overcome such as base point difference for each building, old services underground that don’t have a model for it, but by combining the Civil 3D files for utilities and road with Revit 3D building files we could catch up with all the coordination issues, for viaduct we used the surface extracted from Civil 3D to align the precast structural elements in Revit to provide survey points to the site team to enhance the site execution:
● I established the troubleshooting process for all the Civil/Structural/Architectural issues.
● I supported the QS team by providing the Cut and Fill calculation by comparing the final model against the Survey surface model.
● I orchestrated weekly coordination meetings using 3D models with the design consultant which supported the understanding of constructability issues and expedited the shop drawings approval.
● I also engineered the LOD Specs that satisfied Engineer/client requirements for O&M using Maximo. Furthermore, I conceptualized and spearheaded the dependency of 3D models for technical team design review which had a tremendous value for the quality of all design team drawings.

Sr. BIM Engineer à Consolidated Contractors Group (offshore)
  • Egypte - Le Caire
  • juillet 2016 à novembre 2016

Projects: Abu Dhabi Airport Project, Riyadh Rail, Dubai Opera, Abu Dhabi plaza towers, Qatar Faculty of Islamic studies, Lusail multipurpose hall.
● I composed and design structural and civil 3D BIM models including the arrival landside of Abu Dhabi Airport terminal.
● I coordinated the models of elevated/underground/on-grid stations of the Riyadh metro project during my work in the CCC-Cairo office.
● I teamed up with engineers from other departments for design coordination,
● I trained and mentored newly joined engineers and helped them to blend in the team harmony.
● I produced and extracted QS reports/ technical queries from Project design documents.
● I developed a model simulation to support safe site execution for complicated tasks such as removing burnt sliding formwork.
● Supported cost and BOQ comparison, alongside claim management.

Sr. Structural BIM engineer à Arabtec Consolidated Contractors JV LTD.
  • Kazakhstan
  • janvier 2015 à juin 2016

▪ Support construction methodology through 3D Simulation and drafting coordination drawings
▪ Organizing and Extracting look-ahead concrete quantities from 3D models according planned activities schedule to enhance coordination of site Activities.
▪ Checking sub-designer Structural model against design drawings and feedback Engineering team with problematic areas to update before site execution.
▪ Studying architectural and engineering drawings and specifications for cost loading, and preparing detailed Material Takeoff tools to assist in budgetary control
▪ monitoring changes to designs, reflect in 3D BIM models, assessing effects on quantities /cost, and measuring, valuing design variation.
▪ Support Crane study by 3D crane simulation / clash checking.
▪ Support multi-trade design coordination by highlighting problematic zones with 3D clash test reports.

structural Engineer (BIM) à consolidated contractors company (CCC)
  • Egypte - Le Caire
  • janvier 2012 à décembre 2014

▪ Increasing coordination of construction documents
▪ Embedding and linking of vital information such as vendors for specific materials, location of details and quantities required for estimation and tendering
▪ Increasing speed of delivery
▪ Reducing costs.
▪ Clash detection and solving
▪ Preform Crane study through different phases of project
▪ Support in developing exchange methodologies across different BIM platforms through Industry Foundation Classes “IFC”
▪ Develop fully coordinated model for different trades in the project.
▪ Develop plans, sections, elevations and details cut from a 3D model for large scale projects.
▪ Generating bill of quantities “CSI formatting” (based on QS rules such as “POMI”)
▪ Involved in preparing CCC BIM implementation plan for different project.
Business or sector Construction & engineering.

Visiting Structural Engineer (BIM) à consolidated contractors group
  • Qatar - Doha
  • juillet 2012 à octobre 2012

• Making updates on model of Qatar faculty of Islamic studies project \[QFIS\] with the cost of 750 million USD, clash detection, discrepancy solving with consultant &site engineers, quantities, coordinates, dimensions, as-built modeling -reports and Coordination.

designer engineer à EOC
  • Egypte - Le Caire
  • novembre 2010 à novembre 2011

Designer engineer using SAP, AUTOCAD, revising tenders and BIDS and BOQ, general conditions for steel and concrete buildings
Projects:
• Design and review of EIPET factory ( 2 silo buildings-2 SSP buildings - 2 CP buildings, some facilities buildings) in Egypt (the second biggest factory in its industry worldwide) with a total cost of 100, 000, 000 LE;we started in revising the contracts, general condition to the financial, technical comparison of the offers, then we started to check the calculations and the drawing of TATA consultant which was designing by American codes
• Design and reviewing of Egypt-china industrial city project in EL Ain -EL sokhna Which contain VIP hotel and a Mall with a total cost of 60, 000, 000 LE
• Some villas and office buildings on New Cairo.
• Shop drawing of concrete buildings using British Standards

junior engineer à engineering consulting association
  • Egypte - Le Caire
  • septembre 2010 à novembre 2010

shop drawing & quantities calculation for concrete buildings using British standards and numbering system
design of villas and commercial buildings in fifth settlement (new Cairo)

trainee engineer à orascom for housing communities
  • Egypte - Le Caire
  • août 2009 à septembre 2010

orascom
building law cost houses which is mostly from 2 floors with the minium steel and cement and areas of varied from 48 sqm to 70 sqm in Haram city where is in the middle of the desert and tough life

quality control Engineer (trainee) à Madenaty (Talaat Mostafa group) ,
  • Egypte - Le Caire
  • juillet 2009 à août 2009

madinaty
I joined the quality control team as we were building villa compound
our role was to see if the building processed as required and then we show it to the quality assurance committee

trainee engineer à EMCON(Egyptian metal constructions)
  • Egypte - Le Caire
  • juillet 2009 à août 2009

we visited and supervised the constructions of two factories
1) a 6 floor steel factory which produce chemicals
2) a crystal asfour extention factory in cairo

Éducation

Baccalauréat, civil engineering public works section,environmental& sanitary engineering (graduation project)
  • à Ain shams university
  • juillet 2010

* Auto cad course and got excellent degree in it *enterprising Course from INJAZ *SAP 2000 course *self learning of watercad 8 (make my graduation project) *self learning of sewarcad * Engineering Yields Economy conference 08 reception head; so I have good leadership skills, crisis and stress management * HR member in Alashanek Ya Balady, how to document and how motivate and evaluate people and work * Reception member in Annual Conference for Engineering Students 08 conference; the first organizing position I hold so it was the peak of my add as I was not only a rec. member I was trying to learn more about other committees and collect as much as I could * Smart family coordinator & vice president how to manage long number of people (in the trips) * Engineering Yields Economy 07 participants; I studied finance and marketing and knew about decision making * I’m now founder and marketing specialist * Under graduate member in Institution of Civil Engineers which working under British Engineers Institution Egypt

Specialties & Skills

Construction Engineering
Civil Engineering
Design Development
Technical Management
ms word
autocad
staad founfations
quantum GIS
MS excel
sewer cad 5.6
ms powerpoint
watercad 8
SAP2000
MS outlook
microstation
REVIT 2015
4D planning
Navisworks 2015
bentlley Aecosim
Power Inroads

Langues

Anglais
Expert
Français
Débutant
Russe
Débutant

Adhésions

Engineering Yields Economy conference 08
  • reception head
  • October 2007
Institution of Civil Engineers
  • member
  • May 2006
Egyptian engineers syndicate
  • member
  • October 2010
Arab Engineers syndicate
  • member
  • October 2010
Board of Professional Engineers of Queensland
  • Civil Engineer
  • October 2018

Formation et Diplômes

Certified Planning and Scheduling Course from PMI, PDU=15 (Certificat)
Date de la formation:
April 2014
Valide jusqu'à:
April 2014
Certified Risk Management course from PMI ,PDU=15 (Certificat)
Date de la formation:
February 2013
Valide jusqu'à:
February 2013