Planning Team Leader
Orascom Construction
مجموع سنوات الخبرة :14 years, 9 أشهر
• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.
• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.
· Assisting in establishing a client's requirements and undertaking feasibility studies
· Preparing tender and contract documents.
· Tender Evaluation; which includes detailed financial review and analysis of the submitted offers, Contractual review and evaluation and comprehensive Technical review
· Reviewing project Schedule, Full Loaded Baseline, updates and all Deliverables prepared by Contractor
· Reviewing and Approving Variations and Claims submitted by Contractor
· Reviewing and Approving EOTs Submitted by Contractor
· Monitoring and Controlling at Project’s Time and Cost using EV analysis
· Attendance of progress meetings with owner, PM and CS and preparation of meetings minutes
• Preparation of Baseline Program for project at the tendering stage as per the scope of work using Primavera 6 according to Contract stipulations.
• Complete resource planning including labor & non labor as per project scope.
• Preparing a narrative progress report at monthly basis that depicts clearly status of the project progress.
• Preparation of related reports (lookaheads, resource histograms, cash flow … etc)
• Cost loading and monitoring the cash flow & project progress.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame of the project.
• Preparation of detail documents for extension of time for the project.
• Preparation of recovery plans and corrective actions.
• Preparation of proposed plans
• Prepare Master schedule and Budget
• Prepare detailed schedule using Primavera P6 (Mobilization, Engineering, Procurement, Construction Schedule and
Material Delivery).
• Evaluate Main Contractors Proposals and Award one based on the evaluation Criteria
• Monitor and Control the Construction Schedules and Costs.
• Monitor Critical/ Near Critical Paths.
• Monitor Main Contractor Payments.
• Revise the schedule & create new version of baseline if needed
• Preparing and Reporting a narrative progress report at monthly basis that depicts clearly status of the project progress
and issues of concern with regard to constraints.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame.
• Review Technical Specification, BOQ, drawings and quantity take off.
Ongoing
• Courses: - Construction Economy and Accounting - Infrastructure Asset Management - Artificial Intelligence in Construction Management • Thesis: “Decision Support System for Mixed Infrastructure Management”
• Courses: - Construction Management - Cost Estimate and Control - Construction Laws and Contracts - Organization Behavior - Projects Planning and Control