أحمد أسامة جمال, Planning Team Leader

أحمد أسامة جمال

Planning Team Leader

Orascom Construction

البلد
مصر - القاهرة
التعليم
دكتوراة, Construction Management and Engineering
الخبرات
14 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 9 أشهر

Planning Team Leader في Orascom Construction
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ مارس 2015

• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.
• Prepare baseline schedule, revised schedules and recovery schedules considering all inputs (manpower, equipment and materials) availability, production and construction sequences.
• Develop and update resource (manpower and equipment) histogram weekly or monthly as required
• Evaluate allocation of resources and provide recommendations to maintain required progress
• Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analysis deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
• Preparation of accurate Earned Value and Budgeting reporting in monthly basis
• Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
• Study and analyze the impact of any event or variation on the time schedule and prepare the EOT claims.

Project Controls Engineer في rmc consulting
  • مصر - القاهرة
  • سبتمبر 2012 إلى فبراير 2015

· Assisting in establishing a client's requirements and undertaking feasibility studies
· Preparing tender and contract documents.
· Tender Evaluation; which includes detailed financial review and analysis of the submitted offers, Contractual review and evaluation and comprehensive Technical review
· Reviewing project Schedule, Full Loaded Baseline, updates and all Deliverables prepared by Contractor
· Reviewing and Approving Variations and Claims submitted by Contractor
· Reviewing and Approving EOTs Submitted by Contractor
· Monitoring and Controlling at Project’s Time and Cost using EV analysis
· Attendance of progress meetings with owner, PM and CS and preparation of meetings minutes

PLANNING ENGINEER (part time) في AL-ANSARY FOR CONTRACTING
  • مصر - القاهرة
  • أكتوبر 2012 إلى ديسمبر 2013

• Preparation of Baseline Program for project at the tendering stage as per the scope of work using Primavera 6 according to Contract stipulations.
• Complete resource planning including labor & non labor as per project scope.
• Preparing a narrative progress report at monthly basis that depicts clearly status of the project progress.
• Preparation of related reports (lookaheads, resource histograms, cash flow … etc)
• Cost loading and monitoring the cash flow & project progress.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame of the project.
• Preparation of detail documents for extension of time for the project.
• Preparation of recovery plans and corrective actions.
• Preparation of proposed plans

Planning Engineer في El Nasr of Civil work
  • مصر - القاهرة
  • سبتمبر 2009 إلى أغسطس 2012

• Prepare Master schedule and Budget
• Prepare detailed schedule using Primavera P6 (Mobilization, Engineering, Procurement, Construction Schedule and
Material Delivery).
• Evaluate Main Contractors Proposals and Award one based on the evaluation Criteria
• Monitor and Control the Construction Schedules and Costs.
• Monitor Critical/ Near Critical Paths.
• Monitor Main Contractor Payments.
• Revise the schedule & create new version of baseline if needed
• Preparing and Reporting a narrative progress report at monthly basis that depicts clearly status of the project progress
and issues of concern with regard to constraints.
• Performing any necessary adjustments or/and recovery plans to the program to respect the time frame.
• Review Technical Specification, BOQ, drawings and quantity take off.

الخلفية التعليمية

دكتوراة, Construction Management and Engineering
  • في Cairo University
  • ديسمبر 2015

Ongoing

ماجستير, CONSTRUCTION MANAGEMENT AND ENGINEERING
  • في CAIRO UNIVERSITY
  • فبراير 2014

• Courses: - Construction Economy and Accounting - Infrastructure Asset Management - Artificial Intelligence in Construction Management • Thesis: “Decision Support System for Mixed Infrastructure Management”

دبلوم, PROJECTS MANAGEMENT
  • في CAIRO UNIVERSITY
  • يناير 2012

• Courses: - Construction Management - Cost Estimate and Control - Construction Laws and Contracts - Organization Behavior - Projects Planning and Control

بكالوريوس, Civil Engineering
  • في CAIRO UNIVERSITY
  • سبتمبر 2009

اختبارات بيت.كوم

IQ Test
IQ Test
Score 88%

Specialties & Skills

Quantity Surveying
Planning
Cost Management
Project Management
Primavera P6
Primavera 6
Risk analysis
AutoCAD
excel VBA

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Contractual and Legal Aspects in Construction (CLAC) (الشهادة)
PMI Scheduling Professional (PMI-SP) (الشهادة)
Project Management Professional (PMP) (الشهادة)

الهوايات

  • Reading