Ahmet Öztürk, TUNNEL TBM CONSTRUCTION MANAGER

Ahmet Öztürk

TUNNEL TBM CONSTRUCTION MANAGER

SALINI IMPREGILO

Location
Saudi Arabia - Riyadh
Education
Bachelor's degree, Geological Engineering
Experience
20 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 5 Months

TUNNEL TBM CONSTRUCTION MANAGER at SALINI IMPREGILO
  • Saudi Arabia - Riyadh
  • My current job since April 2014

ANM /CWG Consortium (Salini/Impregilo - Nesma&Partners - Larsen&Toubro)

Riyadh Metro Line III - Riyadh/Saudi Arabia

Tunnel TBM Construction Manager (2014 April - to date) 3.5 years

Salini Impregilo-Larsen&Toubro-Nesma&Partners ANM /CWG Consortium Riyadh Metro
Package 2 / Line 3-total lenght is 41 kilometres.
Underground stage is included; 8 underground stations and 6 kilometrs tunnel.
1 no’s NFM EPB type 10.16 meters diameter TBM. NFM - NTU070 / 106.
Full responsabilty of design -execution and managing of tunnel construction and related
Activities from design stage to completion of all tunnel excuation.
TBM and site assembling and dismantling activities has been finalized.
Tunnel sealing activities grout and chemical injection has been finalized.
Tunnel infiil concerte works has been finalized.
Allover tunnel and related activities from design stretch to the hand over stretch has been finished successfully on this project.

The responsibilities concerns of the following items.

 Design& Execution of TBM Launching shaft
 Execution& Managing of All Tunnel and related activities
 Implementing quality standards.
 Budget management and procurement
 Building and recruiting a large operational team
 Communicating with the client
 Establishment of Site&TBM Team
 Modification of selected TBM NFM NTU 106 10, 16 m diameter EPB
 Factory Acceptance Test and commissioning of the TBM
 Purchasing TBM and related equipment’s
 Preparation of the launch cavern
 Cost Control
 All Financial Works
 Risk analysis
 Project Planning
 TBM and related equipment’s procurement management
 -Tunnel sealing-secondary grouting (cement/chemical)
 Tunnel finishing concrete &MEP works (rein fill concrete for rails)
 Assembling &Dismantling TBM and all related equipment
 Tunnel handing over MEP works tunnel in fill concrete and clearance -handing over procedures

TUNNEL TBM CONSULTANT ENGINEER at ASTALDI MAKYOL GULERMAK JV
  • Türkiye - Istanbul
  • January 2014 to December 2014

Astaldi-Makyol-Gulermak JV istanbul - Turkiye
Kadikoy Kartal Metro Project

Dogus Construction Company Sofia -Bulgaria
Sofia Metro project

 TBM Site planning
 TBM assembly design
 Risk analysis
 Project Planning
 Assembling design of Herrenknecht EPB TBM S-525 9.45 m
 Assembling design of Herrenknecht EPB S 505 - S 506 9.

TUNNEL TBM CONSULTANT ENGINEER at ASTALDI MAKYOL GULERMAK JV
  • Türkiye - Istanbul
  • January 2014 to December 2014

Astaldi-Makyol-Gulermak JV istanbul - Turkiye
Kadikoy Kartal Metro Project

Dogus Construction Company Sofia -Bulgaria
Sofia Metro project

 TBM Site planning
 TBM assembly design
 Risk analysis
 Project Planning
 Assembling design of Herrenknecht EPB TBM S-525 9.45 m
 Assembling design of Herrenknecht EPB S 505 - S 506 9.

Tender Responsible at GULEWRMAK POLAN WARSAW BRANCH OFFICE
  • Poland
  • January 2014 to April 2014

I worked in tender stage of some Tunnel TBM Projects (Denmark / Copenhagen,
Oslo /Norway, Sofia /Bulgaria etc ...)

TBM MANAGER at AGP Metro Poland
  • Poland
  • January 2011 to March 2014

Astaldi-Gülermak Partnership
- Tunnel TBM Manager (2011 -2014.) Warsaw Metro Line 2 Construction of Metro Systems, Electro-Mechanical Work and Vehicle Available of Work. Turkis-h Italian joint venture project carried out in Warsaw, capital of Poland consists of seven deep underground stations. Vistula river in Warsaw, which divides the city as a two sides of the tunnel system connected to each other, and facilitating access to the city's planned.
4 no’s EPB type 6.30 meters diameter Herrenknecht S 644- S645 -S646-S760 TBM (Tunnel Boring Machine), H+E tunnel conveyor belt systems and transport vehicles MSV have been used in this project.

The responsibilities concerns of the following items.



 Preparation of the jobsite for TBM S644-S645/S646- S760 Herrenknecht of 6.30 m diameter
 Assembly of TBM S 644-S 645 -S646- S760 Herrenknecht EPB TBM.
 Preparation of all service line and construction of launch constructions.
 Preparation of TBM thrust frame
 TBM monitoring
 Assembly of TBM.
 Inspector of production stage and assembling on 4 TBMs at Herrenknecht AG Factory Germany/ Schwanau.
 Supervise the establishment and commissioning of segment precast factory. The segment precast was manufactured in this factory for to build inside the tunnels at Warsaw project.
 Supervise the establishment and commissioning of TBMs site which is located Rondo Daszynskiego.(TBM S 644&645)
 Supervise the ground improvement process; HDD (Horizontal Directional Drilling).HDD was done at 48 points with cement and chemical injection. The aim of this issue is for to pass Historical Building of Praga with TBMs in safe condition and It worked successfully.
 Supervise the establishment and commissioning of TBMs site which is located Rondo Wilenski (TBM S 646&760).
 TBM Manager of TBM S646, managing of this Tunnel and all related activities.
 The most critical points in this project for TBM were under passing of Praga Historical Buildings and Vistula River, both of them was passed with TBM successfully.
 Disassembly &packaging of TBM S646-S760 and related tunnel and site facilities.
 Establishment of Tunnel& Site team.
 Crisis management
 Communicating with the client (Metro Warsawzski)

INTERN ENGINEER at General Directorate Of State Hydraulic Works
  • Türkiye - Ankara
  • March 2013 to December 2013

I completed my intern in The State Water Supply Administration - underground water departmant. During my internship I worked as a intern engineer in Bolu-Koprubasi
Dam project and another small projects close to Ankara.

Site Manager at Gulermak-Dogus Joint Venture
  • Türkiye - Istanbul
  • January 2006 to January 2011

In Gulermak Ahmet was responsible for: the coordination of the tunnel and field. He worked as an engineer at the completion of the 5.5 km long route. 2-Gulermak- Dogus Joint Venture-Site Manager (2010-2011) within the scope of the job tasks that İstoc and Sanayi Metro Station to the station infrastructure and miscellaneous works (back fill,
displaced infrastructure works, asphalt works, water pipeline, concrete paving and curbs, landscaping works, PVC
membrane application works) . Rails work station and the tunnel entrance, to a permanent rail assemblies (excavation of the tunnel for the first studies rails concrete beams, prefabricated building element assemblies, permanent rail assembly and welding works)

TUNNEL TBM Engineer at Gülermak Doğuş Joint Venture
  • Türkiye - Istanbul
  • January 2006 to January 2011

The responsibilities concerns of the following items.

In this project I was responsible for: the coordination of the tunnel and field.I worked as an engineer at the completion of the 5.5 km long route LRT line and
6, 5 km long route 2 Metro Line 6, 56 meters, 4 EPB TBM machine was used In this project .
Excavation of 14 km Metro tunnels with two 6.5m diameters TBM S-325
Herrenknecht ( EPB Shield) and Lovat RME257SE series(Mixed Face, EPB
TBM, including, the preparation of portals for TBMs, connecting headings,
fire safety connections( 8 pieces 9 meter long cross-passage tunnel construction), shaft
excavation, changing the cutter head and maintenance of TBM, controlling sub-contractors,
reporting and calculation of financial wright



 Preparation of the jobsite for TBM Herrenknecht S 325 and TBM Lovat 6.56 m diameter
 Assembly of TBM S 325 Herrenknecht EPB TBM.
 TBM Site planning



Gulermak-Dogus JV (2010-2011) 1 years

Otogar-Ikitelli Metro Project Istanbul-Turkiye

Site Manager of 2 underground stations

Gulermak- Dogus Joint Venture- within the scope of the job tasks that İstoc and Sanayi Metro Station to the station infrastructure and miscellaneous works (back fill, displaced infrastructure works, asphalt works, water pipeline, concrete paving and curbs, landscaping works, PVC membrane application works). Rails work station and the tunnel entrance, to a permanent rail assemblies (excavation of the tunnel for the first studies rails concrete beams, prefabricated building element assemblies, permanent rail assembly and welding works).

 Contract Management
 Overseeing and enforcing safety issues for site.
 Implementing quality standards.
 Budget management
 Building and recruiting a large operational team
 Communicating with the client
 Overseeing sub-contractors
 Crisis management
 Financial Works
etc...

QA/QC Chief at MNG Company Mapa Co
  • Türkiye
  • January 2004 to December 2005

MNG Company In. Mapa Construction worksite at Trabzon, Black Sea Coast Crossing Road Project. I worked as a quality control chief of concrete
Jobs ( concrete designs, aggregate testing’s, concrete testing and concreting etc.)

Laboratory test of aggregate and concrete samples.
Concrete design and reporting.
Material quality test.
Responsibility of batching plant.
Reporting of test results to project management.

Education

Bachelor's degree, Geological Engineering
  • at Hacettepe University
  • June 2004

Specialties & Skills

Languages

Danish
Beginner
English
Expert
Turkish
Expert

Memberships

Humed
  • Hacettepe University member
  • January 2003
TMMOB-Chamber of Geological Engineers
  • Member
  • January 2004

Training and Certifications

TBM Operator Instructor-Lovat Brand TBM driving certificate (Certificate)
Date Attended:
June 2007
Valid Until:
July 2007
English Language Certificate (Certificate)
Date Attended:
June 1999
Valid Until:
June 2000
OHSAS 18001 (Certificate)
Date Attended:
September 2007
Valid Until:
October 2007
Herrenknecht TBM Certificate (Certificate)
Date Attended:
January 2011
Valid Until:
March 2011
English Grade Certificate (Certificate)
Date Attended:
May 2007
Valid Until:
June 2007

Hobbies

  • Travelling all around the world-swimming-tennis-reading etc.