الخبرة العملية

مجموع سنوات الخبرة :13 years, 3 أشهر

Mechanical Engineer في Samsung Saudi Arabia.
  • المملكة العربية السعودية - الهفوف
  • أبريل 2022 إلى نوفمبر 2023

Position : Mechanical Engineer. Project Site: Aramco Huwaiyah Unaiyzah Gas Reservoir Storage Project. KSA. Duration : 26 April 2022 to 30-Nov 2023.

Mechanical Engineer في G. S Construction Arabia Co
  • المملكة العربية السعودية - الشرقية
  • يناير 2020 إلى فبراير 2022

Handling the site execution erection and alignment work at site
Following the Aramco standard for equipment installation alignment inspection Pre-commissioning and Commissioning work.
Follow up HSE and permit to work at site.
Installation all kinds of equipment like Pupm, Motor, Turbine, Compressor, Air Fan Cooler, Expander, Fire Water Pump I.A compressor vessel column, heat exchanger etc
Knowledge and inspection of all piping equipment work.

Mechanical Engineer في G. S Engineering Construction Corp
  • البحرين - اَلْمُحَرَّق
  • أغسطس 2018 إلى مارس 2020

Responsible for installation, Pre-Commissioning, Commissioning & Operations for rotating equipment.
❖Coordination with vendor to complete to carry out work & pre commissioning activities on site.
❖Prepare MRT procedure & check list for all rotating equipment like Compressors, N2 Compressor, Cold Booster expander, Air fan cooler, BOG Compressor, Re-gas, LNG Booster Pump, Fire Water Pump, I.A Compressor, FSU Marine loading arms etc.
❖Conducted quality checks of mechanical equipment’s during construction, Pre-Commissioning and
Commissioning stages. Supported commissioning and start-up activities.
❖Involved to the Pre Commissioning work activity like motor Solo run test of motor, Fire water Pump, Sea Water Pump, chiller compressor, Main air compressor & N2C work in mechanical activity.
❖Handling the site supervision and preparation of lube oil flushing and oil circulation, testing activity under vendor supervision.
❖Maintaining up to date Preservation records sheet activities of equipment before and after installation.
❖Involved all rotating equipment MRT like Main Air Compressor, N2 Compressor, Air Fan Cooler, Cold Booster Expander, Fire Water Pump, Instrument Air & Chiller compressor etc.
❖Mechanical Running Test for all rotating equipment recording data & maintained all record in sheets.
❖Commissioning activities are conducted as per Health, Safety, Environmental & quality policies and Procedures. Activities at site and reviewing project schedule.
❖Checking all the Parameters of Mechanical (MRT) run test during all Variation Point Check Vibration, Temperature, Noise and(If any abnormal sound rectify) recorded all reading in Data Sheet.

Piping Engineer في Dodsal Engineering Construction pte. Ltd
  • الكويت - الجهرة
  • نوفمبر 2016 إلى أبريل 2018

❖Reviewing all IFC Piping drawing and interface with client and engineering for KOC GC-31-Project.
❖Reviewing, Coordinating & monitoring all activities related to the Execution work of Piping installation and alignment of pipe and coordination with Qc for inspection for clearance.
❖Responsible for the Counter Checking by Isometric Piping Plan for the spool erected in correct location Orientation, alignment and Plumpness, Piping Routing.
❖Review and approval of documents submitted by EPC contractor such as, method statement, ITP, Site technical Queries, Material Approval Request as well as review and approval of drawing based on Requirement.
❖Work in multi-disciplinary teams supporting for piping installation alignment and hydro testing team.
❖Review & approval of the Test pack generated by Sub-Con Participating in work down for the verification and Completion of Piping System prior to release for Hydro test / Pre-commissioning / Commissioning.
❖After Completion of line Checking and Short out the Punch line. Client approval for Pre-commissioning and Commissioning procedures, including flushing activities, (Air blowing, Site Integrity Test, Markup P&ID).
❖Coordinate between various interfaces during hydro testing work at Site.
❖Resolving system problems, including submitting Request for Inspection (RFI’s), correcting or suggesting resolutions and Providing written report of the results.
❖Supervision of all construction work related activities and maintain all quality work according with standards.

Mechanical Engineer في Target Engineering Construction Company
  • قطر
  • أبريل 2015 إلى سبتمبر 2016

Review and approval of documents submitted by EPC contractor such as, method statement, ITP, Site technical Queries, Material Approval Request as well as review and approval of drawing based on Requirement.
❖Work in multi-disciplinary teams supporting for piping installation alignment and hydro testing team.
❖Review & approval of the Test pack generated by Sub-Con Participating in work down for the verification and Completion of Piping System prior to release for Hydro test / Pre-commissioning / Commissioning.
❖After Completion of line Checking and Short out the Punch line. Client approval for Pre-commissioning and Commissioning procedures, including flushing activities, (Air blowing, Site Integrity Test, Markup P&ID).
❖Coordinate between various interfaces during hydro testing work at Site.
❖Resolving system problems, including submitting Request for Inspection (RFI’s), correcting or suggesting resolutions and Providing written report of the results.
❖Supervision of all construction work related activities and maintain all quality work according with standards.
❖Reporting and submit on time daily scheduled and Progress Of Worked directly to the Manager. Received approved
Drawings and following as Per QP Specification as Per Project Standard.
❖Coordination with QC and PMC for final inspection of the line Checking with Packages.
❖Plans and lay-out work from oral and written instructions, assigns and supervises to the work of piping engaged the installation, repair and maintenance of plumbing, firefighting system $ Sprinkler fixture accessories.
❖Looking for all U/G & A/G Piping, Cement line Carbon Steel & Cu-Ni Firefighting sprinkler system work.
❖Participating in mechanical completion walk down for piping and mechanical work through at site.
❖ Follow up the work schedule & Co-ordination with client and sub-contractor for work progress.
❖Overall site Responsible for (Mechanical/Piping/Steel) Monitoring and prepare tie-in points & Tie-in packages
Rising work inspection requests after completion of each activity (Coordinate with site QC representative)
❖Co-ordination with QP for inspection works during final inspection.

Mechanical Engineer في Samsung Engineering Co.Ltd
  • الإمارات العربية المتحدة - أبو ظبي
  • أغسطس 2012 إلى سبتمبر 2014

Installation alignment and inspection of all type of equipment like Turbine, Compressor, Pump, motor, Air Fan Cooler, Lube oil Cooler, Lube Oil Console, heat exchanger Column Vessels, Scrubber etc.
❖Follow up the Rim & Face, Reverse and Laser Alignment of Pumps, Compressor, Turbine, etc.
❖To Check the availability and fitness of Construction equipment and of to Check the Personnel Mobilization and Demobilization.
❖Plant utilities startup (Nitrogen Generation unit, Instrument air Unit, Utility water Pumps) and operation
Self-motivated and able to work as part of a work team.
❖Prepare Piping & equipment system punch list and familiar all type of equipment Package.
❖Assembly, Erection, Commissioning & Operation of EOT 10T, 15T, 60T & 100T EOT Crane.
❖Planning & Scheduling for Mechanical Works, Vendor selection for site execution.
❖Inspection & final box-up of equipment. Handling drawings, manpower control, and site work execution.

Mechanical Engineer في Samsung Engineering Co Ltd
  • الهند - Bharuch
  • يوليو 2011 إلى يوليو 2012

❖Installation alignment and inspection of all type of equipment like Turbine, Compressor, Pump, motor, Air Fan Cooler, Lube oil Cooler, Lube Oil Console, heat exchanger Column Vessels, Scrubber etc.
❖Follow up the Rim & Face, Reverse and Laser Alignment of Pumps, Compressor, Turbine, etc.
❖To Check the availability and fitness of Construction equipment and of to Check the Personnel Mobilization and Demobilization.
❖Plant utilities startup (Nitrogen Generation unit, Instrument air Unit, Utility water Pumps) and operation Self-motivated and able to work as part of a work team.
❖Prepare Piping & equipment system punch list and familiar all type of equipment Package.
❖Assembly, Erection, Commissioning & Operation of EOT 10T, 15T, 60T & 100T EOT Crane.
❖Planning & Scheduling for Mechanical Works, Vendor selection for site execution.
❖Inspection & final box-up of equipment. Handling drawings, manpower control, and site work execution.
❖Monitoring of heavy equipment erection, Like Compressor, Turbine, Column vessels etc.
❖Project scheduling, progress monitoring & follow-up, Co-ordination with client and sub-con for progress.
❖Handling the Pre-Commissioning activity and Commissioning work along with Preservation & Operations for all rotating equipment.
❖Coordination with Mechanical, Piping, Civil Engineers, Discuss technical aspects of Mechanical system with Contractor towards successful completion of project

Mechanical Engineer في Metal Craft Contractors Pvt Ltd
  • الهند - Bharuch
  • مايو 2010 إلى يونيو 2011

❖Handling Piping Installation alignment and inspection work as per project standards
❖Supervision of Pipe erection on site and proper orientation Gap check and vertical check by plum.
❖Mechanical completion walk down for piping and mechanical work through at site.
❖Overall site Responsible for (Mechanical/Piping/Steel) Monitoring (Coordinate with site QC representative)
❖Co-ordination with EIL for inspection works during final inspection.
❖Reporting and submit on time daily scheduled & progress of worked directly to manager.
❖Successfully managed the erection, testing and commissioning of Process equipment’s and piping.
❖Good technical team and interpersonal skills Inspection of piping fabrication as per the isometric Drawing.
❖Witness of Hydro Test and Pneumatic test of piping at work site
❖Coordinate with client and QC inspectors for arranging inspections for piping work activity.

QC Piping Inspector في B. S. T Engineering Construction Co
  • الهند - دلهي
  • سبتمبر 2009 إلى مارس 2010

❖Supervision and inspection of Pipe Fit-up checking visual inspection
❖Co-ordination with for inspection works during final inspection.
❖Reporting and submit on time daily scheduled & progress of worked directly to manager.
❖Successfully managed the erection, testing and commissioning of Process equipment’s and piping.
❖Good technical team and interpersonal skills Inspection of piping fabrication as per the isometric Drawing.
❖Witness of Hydro Test and Pneumatic test of piping at work site
❖Coordinate with client and QC inspectors for arranging inspections for piping work activity.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Jawaharlal Nehru Technological University
  • مايو 2010

Mechanical Engineering from Jawaharlal Nehru Technological University Hyderabad (A.P)with 1st Division in 2010.

الثانوية العامة أو ما يعادلها, B-Tech Mechanical Engineering
  • في Royal Institute of
  • أبريل 2010
الثانوية العامة أو ما يعادلها, B-Tech Mechanical Engineering
  • في Jawaharlal Nehru Technological University
  • أبريل 2010

Specialties & Skills

Equipment Installation
Mechanical Aptitude
Equipments
ENGINEERING
GRAPHIC DESIGN
LAYOUT DESIGN
PERSONNEL
CUSTOMER RELATIONS
MECHANICAL
OIL & GAS
COMMUNICATION SKILLS
MICROSOFT WORKS
COMMISSIONING

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس

التدريب و الشهادات

ASNT LEVEL II (الشهادة)
تاريخ الدورة:
March 2009
صالحة لغاية:
October 2024
ISO 9001-2015 QMS (تدريب)
معهد التدريب:
CQI IRCA CERTIFIED
تاريخ الدورة:
December 2022
المدة:
36 ساعة

الهوايات

  • Reading a book
    I like to read a noble or some famous book