QA/QC ENGINEER
MADINA GROUP WLL
Total years of experience :24 years, 6 Months
Responsibilities:
Project Reviews and Technical Support: Reviewing the Electrical & Instrumentation related
documents (such as Single Line Diagram, Load lists, equipment’s data Sheets, Load calculations, Cable
Sizing, lighting power adequacy check reports, lighting calculations, Instrument air tubing hook ups,
Instrument wiring hook ups, impulse line hook ups, tie-in lists, Alarm set point list, DCS I/O
assignment list etc).
Project Execution: Overall Supervise construction effort to ensure project is constructed in
accordance with design, budget and schedule. Includes interfacing with client representatives, other
contractors, etc. Educate the installation procedure of various instruments like gas detectors,
analyzers, vaporizers, mixing vessels, indications panels, transformers, motors, RMUs, MDBs, PDBs,
temperature/pressure transmitters, thermos wells, control valves etc to job engineers as well as
supervisors
AJAS MUHAMMED PAGE 3
RESUME
Offshore Project: Co-ordination and direct involvement for QatarGas offshore shutdown project 2016
and PCI project “Replacement of RG alpha water makerRGCP-464”.
Coordination with Management: Co-ordination with the project manager, construction managers,
senior engineers and QC Inspectors of other disciplines to solve critical issues regarding the project.
Co-ordinate with HR department for the requirement of manpower mobilization and de-mobilization
as per site necessities
Documentation: Developing and implementing project procedures, material approvals, technical
queries, job safety analysis, etc.
Field Engineering: Provide on-site administrative and technical management of field related
activities on construction project site.
Review and Approval: Review detailed engineering deliverables including documentation,
requisition for procurement monitor approval submission of related discipline documentation.
Coordination with Others: Require interaction with third-party contractors, Operations dept. and
provide commissioning
Management Meeting/Client meetings: Attend weekly management/client’s meetings and
understand & fulfil their requirements and suggestions
Staffing: Managing the E&I staffing including all Engineers and supervisors, ensures all the quality
requirements are met
Team Selection: Select team members and, if cross-functional as the Core Team Leader, select Core
Team Members.
Project Resources: Apply project resources according to the approved project plan
Design Review: Involve functional expertise in design reviews and key decisions as well as risk
strategies
Vendor Coordination: Close analyzing the requirement of vendors for the project execution, inviting
and arranging them for implementing their role if required
JSA/JHA Review & Approval: Reviewing, correcting and approval for the JSA/JHA prepared by job
focal points prior to submit to client
Generation of Electrical & Instrument ITP’s/QCP/Material Approval Request prior for project plan
execution.
Conduct and supervise Receiving Inspection, In-Process Inspection and Final Inspection of electrical
and instrumentation related products and construction work.
Visual, Close and Detailed inspection for E & I equipment installed at site.
Check installation are maintained in accordance to standard/hook-up drawing and satisfactory
condition for hazardous area.
Review, verify and ensure timely completion of Mechanical Completion Dossiers, As-Built drawings
(PEF’s/P&ID, Hook-Up, Single-Line Diagram, Block Diagram, ILD, Interconnection Wiring diagram)
and liaise with the Client’s representatives.
Assist in carrying out a variety of construction/pre-commissioning/commissioning related tasks.
Projects involved:
Upgrade of Power Transmission lines at Abqaiq area, in SAUDI ARAMCO
Power Supply to Future ESP’s and WIP’s in Abqaiq area, in SAUDI ARAMCO
Responsibilities:
AJAS MUHAMMED PAGE 4
RESUME
Documentation: Preparing project documents like method statements, technical queries, technical
approvals, JSAs etc
Co-ordination with Designers: Coordinate with designer for all MRs and rectification of client’s
comments on it and with manufacturer for the NMRs submission and rectification of client’s
comments on it. Provide an Engineering coordination and management function for the Projects and
act as a
(ELECTRICAL)
Projects Involved:
Replace control system at East west pipe line pumps stations, in SAUDI ARAMCO
Khurais WIF & Utilities-Saudi Aramco Mega Project, in SAUDI ARAMCO
Controllers Replacement of Power Generators, in PETROKEMYA SABIC
Testing & Oil filtering of Power Transformers, in SHARK SABIC
Responsibilities:
Preliminary Site Reports: Prepare preliminary work for the beginning of the project work at site
IFC Drawings: Reviewed IFC Drawing as per the site conditions
Construction Scheduling: Prepared the construction schedule for the next two weeks
Procurement Inspection: Assumed responsibility for all the material receiving inspection with the
concerned QC Inspector
Inspection: Complete Installation and supervision of Reel cable testing of power Control &
instrumentation cables
AJAS MUHAMMED PAGE 5
RESUME
Fire Alarm System: Supervised the process of the installation of fire alarm system and assumed
responsibility for the functional testing of fire alarm system & HVAC system in the presence of
vendors
Internal Notifications: Providing internal notification to QC Inspector for raising the RFI (Request for
Inspection)
Coordination with Senior Engineers: Co-ordination with the senior engineers and QC Inspectors of
other disciplines to solve critical issues regarding the project
Technical Query: Prepared Technical Query (TQ) and provided red marked drawings to the site
management
Testing and Pre Commissioning: Supervised the testing & pre commissioning activities of dry type
transformer, low voltage panel boards, circuit breakers etc
Energization Package: Prepared Energization package for all the low voltage systems.
Fire Alarm System: Assumed Complete Responsibility for the installation, maintenance and testing
of the fire alarm system
Technical Query: Prepared Technical Query (TQ) and provided red marked drawings to the site
management
Solution of Critical Issues: Coordinated with the senior engineers and QC Inspectors of other
disciplines to solve critical issues regarding the project.
Activities of Foreman: Coordinated the activities of Foremen and obtain the targets, schedules and
budget.
Notifications for RFI: Provided internal notification to QC Inspector for raising the RFI (Request for
Inspection).
Project Management: Coordinated with Senior Engineers for the successful completion of the project.
Daily Reports: Submitted daily report of the achievements and work completed at site to their
IN