Electrical Engineer
Kerala State Electricity Board Ltd
Total years of experience :9 years, 6 Months
110kV Substation, Mundakayam (India)
▪ Inspection of substation equipment.
▪ Installation, Operation and Maintenance of the Extra High Voltage Substation equipment’s such as
Power Transformers, Current Transformers, Potential Transformers, SF6 Circuit Breakers, Vacuum
Circuit Breakers, Isolators, Protection relays, Battery & Charger, C&R Panel Operation, LT Panel
according to procedures and requirements.
▪ Carry out isolation/normalization of equipment as required by the Permit-To-Work System.
▪ Troubleshooting of faults and malfunctions in the electrical system.
▪ Preventive Maintenance & Testing of Power Equipment.
▪ Record substation operating data.
▪ Maintaining relevant registers and submission of monthly reports.
▪ Ensuring uninterrupted Power Supply and responsible for overall working of the Substation
CGPA:-7.39 no backlog history