Start the Full Operation phase as Senior Engineer
o Indar scope in Haramain High Speed Rail project is technological scope. Indra is providing proprietary solutions in specific segments in transportation. they install and operate all telecommunication network, signaling integration with and the control room Data center. Provide all support system to train station like Passengers information, public announcement auto fare collection and many more.
o As support Engineer I had the chance to provide the support to many systems like SCADA, telecommunication network and CDC to the end user in this project during construction and operation days.
o Testing and commissioning ERCS (Electrical Remote Control System) integration, HVPS integration, LVPS integration to PSCC (Power Supply Control Center) system.
o Coordinate with all stakeholder and the Consultant to progress the project tasks.
o follow up and update the project status to direct manganese.
o Managing and handling new project in (Discrete Automation and motion Division) DM department.
o Project manager responsibility start in early stage in the design phase after the sales team handover the P.O. his responsibility will cover coordination between the engineering team and the customer and all the stakeholder overall to execute the project with the highest KPI.
O Following the technical requirements to for the design approval to get the manufacturing release.
O Make sure that all phases of the project are being on time and meeting the deadline and improving the delivery time if possible.
o Coordinate with logistic team to deliver the materials to the site.
o Kickoff meeting with sub-contractor and vendor to deliver all scope of work and P.O.
requirement to deliver the project.
O Maintain communication and an executive summary with the all stakeholder of the project.
o Prepare the required progress report on a project specific basis.
http://new.abb.com/middle-east
o Managing new SCADA and Telecommunication project.
o Ensure that the technical competence of electrical personnel under supervision is matched to the work in hand
o Ensure that the work output of electrical personnel under supervision complies.
o Provide technical assistance to electrical personnel as required
o Ensure as far as practically possible all assigned work is carried out in compliance with agreed budget and schedule
o Ensure that results of any development work are fully utilized in electrical activities
o Provide technical assistance to other disciplines as required
o Provide documentation and drawing deliverables for inclusion in work packs.
o Participate as necessary in discussions with Clients.
o Assist the Electrical Engineers when requested in the execution of their responsibilities and duties.
o Prepare weekly electrical progress on a project specific basis.
o Review shop drawings to ensure conformity with engineering designs.
o Provide technical guidance, advise and instruct project team.
o Preparing the technical submittal for material approval base on the B.O.Q and the budget.
o Temporally managing the Mechanical department in the project.
The position is Electrical Project Engineer for Salman Bay Housing Project. The position is responsible for developing the technical deliverable required for power and communication systems. This position is responsible for the development of power distribution system concept, load studies and analysis, grounding, lighting, coordination. As well as coordinating with consulting and the reset of other project division approving the design and supervise the project process. This position is also responsible for approving electric and electronic materials for the project.
Communication Engineer
o Supervised and maintained, control room network.
o Supervised and helped technicians with the installment of new equipments.
o Instructed new Technicians.
o Involved in end-to-end test for many communication equipment.
URL: http://www.se.com.sa/SEC/English/default.htm
Analyst Assistant
o Assisted customers in completing questioner via phone.
o Analyzed questioner results.
Trainee
o Trained for eight weeks in Transmission Department and Optical Fiber Maintenance Center.
o Under Supervision, trouble shooting fiber optic line technical failures.
o Instructed how to report technical failures.
URL: http://www.stc.com.sa
Personal department, updating the employee's personal data.
In summer 2006 I was awarded a scholarship from the Ministry of Higher Education (King Abdullah scholarship program). I started the MEM master program in Spring 2008 in Lawrence Technological University after one semester in MS, Electrical and Computer Engineering program. In May of 2009 I earned my MEM, Masters of Engineering Management degree. with GAP 3.75 out of 4.
In summer 2006 I was awarded a scholarship from the Ministry of Higher Education (King Abdullah scholarship program). I started my master program in fall 2007 in Lawrence Technological University after finishing the preparation of university requirements. I joined the MS, Electrical and Computer Engineering in fall 2007. In January of 2009 I earned Student office award for the Academic Excellence in MS program. in May 2009 I earned my MS with GPA 3.74 out of 4.
After high school I enrolled in King Abdul Aziz University engineering school. in spring 2004 I earned a Bachelor of Science Degree in Electrical Engineering, Electronics and Communication Engineering. (fall 1998- Spring 2004) during my bachelor degree time I had the opportunity to work in summer job, Summer Training, and part time job. Graduated with GPA: 3.64 out of 5