مجموع سنوات الخبرة: 12 سنوات, 3 أشهر
أغسطس 2013
إلى حتى الآن
Technical Lighting Engineer
في Noortek - Lighting Technology Factory (Alnasser Group).
البلد :
المملكة العربية السعودية - جدة
o Specifying the suitable lighting fixtures or alternatives as specification (ceiling mounting, Wattage, Lumen, application, IP, Ballast or driver for LED).
o Preparation of Quotations and Submittals
o Assisting sales people by giving presentations of products for interior designers, consultants and contractors.
o Writing formal documents such as technical submittals, compliance sheets, comparison sheet and compliance statement.
o Technical submittals review in compliance with Project requirements
o Providing technical clarification to Clients / Consultants.
o Coordinating and communicating with the suppliers for technical reviews as per project specifications.
Job Training:
o DIALUX Introduction
o LED Technology
o Preparation of Quotations and Submittals
o Assisting sales people by giving presentations of products for interior designers, consultants and contractors.
o Writing formal documents such as technical submittals, compliance sheets, comparison sheet and compliance statement.
o Technical submittals review in compliance with Project requirements
o Providing technical clarification to Clients / Consultants.
o Coordinating and communicating with the suppliers for technical reviews as per project specifications.
Job Training:
o DIALUX Introduction
o LED Technology
نوفمبر 2011
إلى يونيو 2013
High Voltage Power Tendering Engineer – Overhead Transmission Lines and Underground Cabl
في Energya Elsewedy
البلد :
مصر - القاهرة
--Job Description:
o Review Tenders and Determine Tender requirements and specifications like ( Type of towers, Insulators, Conductors, Cables, OPGW, Accessories and foundation)
o Preparation of tender Documentation and materials costing.
o Prepare and Estimate Bill of Quantity for overhead transmission lines.
o Site Survey and attend meetings and visits for new projects
o Receive offers and revise it with the technical guarantee tables and technical specification as technical evaluation.
o Compare and Select the appropriate technical and commercial offers received from suppliers and sub contractors.
o Provide technical assistance to suppliers.
o Coordinating with the Procurement Group in order to prepare material specification, requisitions.
o Search for new suppliers and build relation with them.
o Follow up with the suppliers and remind them periodically.
o Writing reports and documentation to managers.
--Projects:
Overhead Transmission lines Tenders:
The construction of 130 Km of 33 KV overhead lines from Lumwana substation to the proposed Kabombo substation (Zambia).
Supply and installation of distribution substation (11/33) KV, medium voltage lines, transformers and connection of customers in non-electrified district headquarter and other rural areas (Tanzania).
Design and construction works for transmission lines and substation construction of 110KV transmission line 40KM (Rawanda).
Turnkey construction of the osana van bach booster II 66KV transmission line (Nambia).
Underground Cables Tenders:
Lot 1, replacement of 11kV switchgear, Lot 2, Replacement of 33kV cables, Lot 3 and upgrading of 33kV & Lot 4 Upgrading of 33k OHTL
220 K.V UNDER GROUND XLPE CABLES FOR Connecting Suez Steel Company S/S To Attaka PIS Approximately 3.3 km route length ( Single circuit ) and 220KV Switchgear (Egypt)
15th of May city Social housing project (Housing Family) 12/20 kv XLPE (Egypt).
Studies:
Financial evaluation study for Sierra Leone power plant 120 MW and its Transmission Grid \[BOOT (Build-own-operate-Transfer)\].
Financial evaluation study for Sierra Leone power plant 500 MW and its Transmission Grid (BOOT).
Financial evaluation study for Sierra Leone power plant 400 MW and its Transmission Grid (BOOT).
Site Survey
Site Survey Training at Suez Steel Company and Attaka Station.
Training:
Site training at Mall of Egypt Project (Underground Cables)
Job Activities:
Make data base for local and national suppliers.
Coordinating & integrating all my team’s activities.
o Review Tenders and Determine Tender requirements and specifications like ( Type of towers, Insulators, Conductors, Cables, OPGW, Accessories and foundation)
o Preparation of tender Documentation and materials costing.
o Prepare and Estimate Bill of Quantity for overhead transmission lines.
o Site Survey and attend meetings and visits for new projects
o Receive offers and revise it with the technical guarantee tables and technical specification as technical evaluation.
o Compare and Select the appropriate technical and commercial offers received from suppliers and sub contractors.
o Provide technical assistance to suppliers.
o Coordinating with the Procurement Group in order to prepare material specification, requisitions.
o Search for new suppliers and build relation with them.
o Follow up with the suppliers and remind them periodically.
o Writing reports and documentation to managers.
--Projects:
Overhead Transmission lines Tenders:
The construction of 130 Km of 33 KV overhead lines from Lumwana substation to the proposed Kabombo substation (Zambia).
Supply and installation of distribution substation (11/33) KV, medium voltage lines, transformers and connection of customers in non-electrified district headquarter and other rural areas (Tanzania).
Design and construction works for transmission lines and substation construction of 110KV transmission line 40KM (Rawanda).
Turnkey construction of the osana van bach booster II 66KV transmission line (Nambia).
Underground Cables Tenders:
Lot 1, replacement of 11kV switchgear, Lot 2, Replacement of 33kV cables, Lot 3 and upgrading of 33kV & Lot 4 Upgrading of 33k OHTL
220 K.V UNDER GROUND XLPE CABLES FOR Connecting Suez Steel Company S/S To Attaka PIS Approximately 3.3 km route length ( Single circuit ) and 220KV Switchgear (Egypt)
15th of May city Social housing project (Housing Family) 12/20 kv XLPE (Egypt).
Studies:
Financial evaluation study for Sierra Leone power plant 120 MW and its Transmission Grid \[BOOT (Build-own-operate-Transfer)\].
Financial evaluation study for Sierra Leone power plant 500 MW and its Transmission Grid (BOOT).
Financial evaluation study for Sierra Leone power plant 400 MW and its Transmission Grid (BOOT).
Site Survey
Site Survey Training at Suez Steel Company and Attaka Station.
Training:
Site training at Mall of Egypt Project (Underground Cables)
Job Activities:
Make data base for local and national suppliers.
Coordinating & integrating all my team’s activities.