Project Manager
Glassline Industries
مجموع سنوات الخبرة :13 years, 8 أشهر
project manager following projects from bidding stage to specification, materials, approval, engineering, fabrication, installation, cost control, handing over, budgeting... etc
Project mechanical engineer working on: 1. Maintenance 2. Mechanical repair 3. Parts ordering 4. Management on site 5. Inspection 6. Cash flow 7. Cost control 8. Quarry and crusher production 9. Breakdowns and production reports 10. Assessment reports 11. Blasting plans 12. Procurement
• June 2011---Present, Glassline industries, Glazing aluminum and steel.
Project engineer position, working on:
1. Site management
2. ISO forms for all dimensions
3. Technical details for different profiles and accessories used
4. Material orders
5. Procurement
6. Cutting list check
7. Weekly meetings with the client and the main contractor
8. Variation orders
9. Payment certificates
10. Weekly reports
11. Internal and external inspection
12. Cost control
13. Budget for materials and installation
14. Shop drawings
15. Letters for the client
16. Clarification requests
17. Installation cash flow
18. Planing
Site management, cutting lists, technical details, material requests, full reports about installation, and field inspection.
• January 2011---June 2011, Wakim Enterprises, electromechanical.
Site engineer in:
Garden view (solider)
The Courtyard (solider)
HVAC systems, drainage, plumbing and firefighting
Site management, shop drawings, material requests, inspection, and technical
details.
• June 2010----sep 2010, Cogemore, electromechanical.
Site engineer in the Ukrainian embassy (Baabda)
HVAC systems, drainage, plumbing and firefighting
Site management, shop drawings, material requests, inspection, and technical
details.
• June 2009----Sep 2009, Hitek sin el fil, electromechanical. (Training)
HVAC systems, drainage, plumbing and firefighting in different sites.
Oct 2005---June 2012, NDU • BE in Mechanical engineering.