Planning Engr
Al Fouzan Construction
Total years of experience :36 years, 0 Months
Makes Schedule for the project, Updating Weekly, Monthly using Primavera P6. Generating 2Weeks Look Ahead, for the Site Engr to follow, Review subcontractors baseline recovery if matching with the approved baseline schedule. Conduct weekly internal progress meeting with all engineers and discussed progress percentage attained and to be completed for the following weeks,
Prepares Construction Schedule. Using Primavera P3, P6 Microsoft Project Office 2007
Certify the monthly progress invoice and charge orders
Review of construction drawings, specifications and BOQ
Site Inspection to monitor work progress
Monitor quality of work in accordance to specified standard.
Inspection of steel work prior to concrete pouring
Approve/ Disapprove all RFI’s based on specs
Monitor field test and laboratory result.
Review of material submittal.
Review of shop drawing submittal.
Attend site weekly progress meetings.
Coordinate to client and contractor..
Coordinate with the 3rd party regarding concreting works
Witness all compaction test for all backfilled soil/sand prior to any other activities to be initiated
Quantify all materials to be used as per client approved quality of materials
Prepare Schedule of Works and discussed with the client for approval
Inspection for the Scope of Works if followed as per approved schedule
Coordinate with Inspector prior to concreting works.
Coordinates and meet with clients and designer regarding various activities and other related project requirements.
Initiate coordination meeting with the client in prior to weekly and monthly reports
Prepare billing documentations.
Site Inspection prior to Approval of Inspector for every scope of works.
Inspect structures measurement, layout and elevation on the planned approved.
Conducts sampling of materials, mixing of materials as per approved designed mixtures.
Supervise mixing in batching plant as per approved by consultant.
Supervise during concreting works, laying of cement treated base and asphalt on site if the
Materials was still good, monitoring temperature if was still on prescribe temperature and
The methodology if followed on site.
Checking of all document/ checklist prior to inspection of Inspector
Review and recommend for approval the following Documents; Contractor Submittals Inspection
Plan, Test Plan Test results and other reports
Site Inspection prior to Approval of Inspector for every scope of works.
Inspect structures measurement, layout and elevation on the planned approved.
Conducts sampling of materials, mixing of materials as per approved designed mixtures.
Supervise mixing in batching plant as per approved by consultant.
Supervise during concreting works, laying of cement treated base and asphalt on site if the
Materials was still good, monitoring temperature if was still on prescribe temperature and
The methodology if followed on site.
Checking of all document/ checklist prior to inspection of Inspector
Review and recommend for approval the following Documents; Contractor Submittals Inspection
Plan, Test Plan Test results and other reports
Coordinate with Inspector for every scope of work to be initiated
Confirm with consultant regarding clarification/ interpretation of Contracts Drawings & Documents
Maintain Submittals and monitor an up to date submittal status log
Prepare QA/QC monthly report
Authorize to disapprove or rejects submittals found to be non- complying and to recommend for approval those complying with the approved specifications
Check/Witness/Inspect work, Equipment materials, manpower of contractor on a day to day basis to determine its acceptability by comparison with known standard & specifications
Certifies daily that all work performed on site/ off site conforms to other trade operation group all aspects of the projects.
Coordinates and assist other departments with QC task to ensure quality activities are in conformance with the requirements.
Inspection of materials upon arrival on site to verify compliance with the approved submittals.
Issues Non- conformance Notice, Deviation Notice to the subcontractor, failing construction material.
Prepare Evaluation Report for Subcontractors.
Supervise installation of formworks for retaining wall
Base preparation and concreting of pavement
Inspector of road surfacing and heavy equipment operation.
Construction of drainage works (Reinf. Conc. Box culvert
Supervise rebar, formworks, concreting works,
Prepares Daily Accomplishment Reports
Quantify Materials to be used on site