Alejandro Núñez, Ténès Sea Water Desalination Plant Project Coordination

Alejandro Núñez

Ténès Sea Water Desalination Plant Project Coordination

Abengoa

البلد
أسبانيا
التعليم
بكالوريوس,
الخبرات
14 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 10 أشهر

Ténès Sea Water Desalination Plant Project Coordination في Abengoa
  • أسبانيا
  • يوليو 2008 إلى سبتمبر 2012

I had been working in the company for four years coordinating several Projects and the most outstanding is the Construction of a Sea Water Desalination Plant in Ténès (Algeria) with a capacity of 200, 000 m3/day.
Additionally, I took part in several technical Specifications of Mechanical Equipments such as Expansion Joints for the Desalination itself for Qingdao Desalination Plant with a capacity of 100, 000 m3/day
Finally, I revised up thoroughly the Honaine Sea Water Desalination Plant Project with a capacity of 200, 000 m3/day.

Engineer Desalination Chief في Isolux Corsan
  • أسبانيا
  • أكتوبر 2004 إلى يونيو 2008

I had a role of conducting and supervising all the Engineering Projects made by the Company for both tendering and Construction.
Several examples are The Construction of Las Palmas III Desalination Plant (Racks X and XI) and the tendering projects related to AGUA Program such as Barcelona (Baix Llobregat, Sagunto, Denia, Campo de Dalias, Torrevieja, Mutxamell, Moncófa and the rest of 21 Great Desalination Plants in Spain.

Support Services في Ministry of Environment
  • أسبانيا
  • يوليو 2002 إلى يونيو 2004

Updating and registration of the different Works Certifications that took part by that time.

Engineer في Ministry of Environment
  • أسبانيا
  • مارس 1998 إلى يوليو 2002

Technical Attendance of the works to be done during the Construction of a 35000 m3/day MED Desalination Plant.

Research and Investigation في CEDEX
  • أسبانيا
  • مارس 1998 إلى ديسمبر 1998

Research and Investigation of the behaviour of cellulose triacetate membranes to be incorporated to a new rack to be build in Las Palmas III big Desalination Plant. Finally, the client did not accept this solution and opted for Hydranautics aromatic poliamide membranes.

Granted في Gran Canaria Isle Council
  • أسبانيا
  • سبتمبر 1997 إلى مارس 1998

Taking care of a pilot plant in order to select the best post-treatment for a 5000 m3/day Sewage Plant efluent in the South East of Gran Canaria. The plant itself consisted on a pilot to treat the effluent

الخلفية التعليمية

بكالوريوس,
  • في University of Las Palmas de Gran Canaria
  • يونيو 1997

After completing the six year period of Engineering Studies I made up the End of Studies Project (Handling Centre for Horticultural Products)

الثانوية العامة أو ما يعادلها,
  • في Tomás Morales High School
  • يونيو 1985

After completing my Studies at the Primary School of Las Palmas de Gran Canaria I went on with my Studies at High School for four years (until June 1985) with a qualification of a 7,2.

Specialties & Skills

Project Collaboration
Great Plains Software
Management Review
Management Science
Preparing and executing project plans
Good communications ability

اللغات

الانجليزية
متوسط
الالمانية
متوسط
الاسبانية
متمرّس
الفرنسية
مبتدئ