IT Administrator
Al Fayhaa Construction and Contracting
Total des années d'expérience :27 years, 6 Mois
• Windows 2008/2019 Server Administration
• LAN Administration
• Office 365 Administration
• Azure AD Administration
• Network Infrastructure Maintenance
• Application support
• Software and Hardware Support
• Onsite and Offsite Support
Dec 2017 - Dec 2020 Project Manager
Integrated Computer Systems (ICS)
Project Management
Managing Multiple sites
Managing Teams
- Survey Team
- Back office team
- ISP and OSP Implementation teams
- Subcontractor main point of contact
- Vendor Prequalification
- Material Managment
Strategic Planning for project implementation
Communicate with customer regarding process, progress and
Reports on targeted and completed projects
Completed Projects
CDMSmith Project - ISP/OSP works @ RSAF - Tabuk
ISP Works
Implemented ISP works according to customer specifications
And standards
Completed 10 Buildings each with Data Communication Rooms
One Data Center, HUB for Main hub connectivity
OSP Works
Managed all aspects of outside plant works
From excavation, manhole installation, backfilling,
Fiber Optic cable pulling up,
Fiber Optic cable termination and Testing
All with High quality work standards
Identify areas which requires extra attention to increase
Manpower efficiencies
Continuous reporting on actual and projected completion dates
BTC GPT Project - Ongoing / Onhold - Riyadh/Eastern Region
AS2 - ISP /OSP Survey and Design
Manage Two(2) Groups - Survey Team and Back Office Team
Survey Team
Responsible for giving accurate accounting of the building existing infrastructure. Composed of Three(3) Teams, each team has 2 to 3 members.
a. Civil drawing
b. Power testing
c. OSP Route
Design - Back Office Team
Composed of 1 Supervisor, 1 Electrical Engineer and 4 Autocad Draftsman. Upon completion of the survey, the drawings and the power testing results are consolidated and being passed into stages until they reach the final design for implementation. The process comprised of packages;
a. Draft or Wash up package - rough drawings of site, buildings and rooms
b. SSP Package - This will include the existing points and recommended taps/points for the room/building, including electrical recommendations
c. CDR Package - Final stage which includes all approved design for recommended taps/points, electrical/power requirement, once approved, the package is ready for use for implementation.
;Each site has different building quantities, they are categorized per size of site according to the number of buildings, Class A has 25 or more buildings, Class B has 5 to 24 buildings and Class C has less than 5 buildings.
AS1 - Implementation
ISP Works
Includes installation of Galvanized and PVC Trunks, UTP/Fiber Optic cable pulling, Termination from cabinet to end points(Faceplates/Modules). After installation, line testing and labeling are done using calibrated testing equipment.
OSP Works
Excavation/Trenching in hard / Soft ground with required finishing surface (Asphalt / Concrete / Grass / Tiles Sand / Rock / Coral), including Supply and install 110mm HDPE/PECD duct with 10 x 20mm Sub ducts, spacer in every 2 Meters, Telecoms Warning Tape and Marker post.
All with High quality work standards, including safety procedures
Identify areas which requires extra attention to increase manpower efficiencies
Continuous reporting on actual and projected completion dates
System and Network Administrator
- Windows 2016 Server management
- End User Support
- LAN Design and Maintenance
- ERP Implementation and maintenane
Policies and Procedure Development
IT Project Design
IT Project Development
IT Infrastructure Administrator
WAN / LAN Administration
- MPLS and local Network management
System Support
- IFS
- D2M Solutions administration
System and Network Administrator
- Windows 2012 Server management
- End User Support
- LAN Design and Maintenance
Policies and Procedure Development
• Windows 2000 Server Administration
• LAN Administration
• MS Exchange 2000 Administration
• Internet Security and Administration
• Network Design and Analysis
• Develop and Implement IT Policies and Procedures
• Software and Hardware Support
• Onsite and Offsite Support
• Windows 2000 Server Administration
• LAN Administration
• MS Exchange 2000 Administration
• Internet Security and Administration
• Network Design and Analysis
• Develop and Implement IT Policies and Procedures
• Software and Hardware Support
• Onsite and Offsite Support
• Unix Sun Solaris Administration