Alfaizal Marajuki, Rural Infrastructure Engineer

Alfaizal Marajuki

Rural Infrastructure Engineer

ARMM SOCIAL FUND PROJECT

Lieu
Philippines
Éducation
Baccalauréat, B.S. Civil Engineering
Expérience
13 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 11 Mois

Rural Infrastructure Engineer à ARMM SOCIAL FUND PROJECT
  • Philippines
  • Je travaille ici depuis août 2011

• Responsible for the site validity, accessibility of the Proposed Sub Project Proposal.
• To honor and assist the Municipal Engineer in preparing Plans and Specification and the Estimate/Bill of Quantity.
• Preparing the lists of submittals of Construction Materials, Tools & Equipment and Permit for Commencements of work at site.
• Preparing Checklist, Request for Inspection, Materials submittal for Inspection, Testing and Construction monthly, weekly and Daily Reports.
• Site tracking on site as per approved Design drawing, Approved Material used at site and Progress of activities as per Schedule.
• Progress reporting of activities, tracking of Actual Manpower & Equipment usage and Actual Cost.
• Estimates Quantity of materials needed at site and site coordination with the project team to ensure the flow of construction activities as per given schedule and plan.
• Coordinate with the project design team and members of the project team for the availability of approved drawing at site, their status and approval.

SITE ENGINEER/ SUPERVISOR à ASAP GENERAL TRADING CONSTRUCTION AND MAINTENANCE GENERAL ENGINEERING
  • Philippines
  • février 2010 à mars 2011

• Responsible in supervising the project implementation both civil and structural works.

• Project controller in terms of quality & quantity of works.

• Assistant project Engineer

• Assist to prepare in Bid documents of the propose project.

• Preparing as built drawing of the revise plans of the project.

Éducation

Baccalauréat, B.S. Civil Engineering
  • à Western Mindanao State University
  • mars 2010

Certificate Of Recognition for Ranking 10th among the Most Outstanding Civil Engineering Students.

Specialties & Skills

Quantity Surveying
Civil Engineering
Cost Planning
Site Supervision
Estimates
 Prepared Plan and Specifications on Project  Prepared Estimates on Specified Plan  Thorough kno

Langues

Anglais
Moyen

Adhésions

Phillippine Institute of Civil Engineer, Inc. (PICE)
  • member
  • June 2011

Formation et Diplômes

 WORK IN FINANCIAL FORMULATION & TRAINING-WORKSHOP (Formation)
Institut de formation:
ARMM SOCIAL FUND PROJECT-PROJECT MANAGEMENT OFFICE & DEPARTMENT OF SOCIAL WELFARE & DEVELOPMENT
Date de la formation:
September 2011
 REFRESHER WORKSHOP ON GOETAG WITH GOOGLE (Formation)
Institut de formation:
ARMM SOCIAL PROJECT-PROJECT MANAGEMENT OFFICE IN PARTNERSHIP WITH DEPARTMENT OF SOCIAL WELFARE & DEV
Date de la formation:
May 2013
 ENCHANCEMENT TRAINING WORSHOP FOR RURAL INFRASTRUCTURE ENGINNERS (RIEs), (Formation)
Institut de formation:
ARMM SOCIAL FUND PROJECT-PROJECT MANAGEMENT OFFICE IN PARTNERSHIP WITH WSDW ARMM
Date de la formation:
May 2012
 COMPUTER-AIDED COST ESTIMATING FOR BUILDING CONSTRUCTION (Formation)
Institut de formation:
CRESCENT TECHNOLOGIES MANILA PHILIPPINES
Date de la formation:
May 2014
Durée:
16 heures
 ARMM SOCIAL FUND FOR PEACE & DEVELOPMENT (ASFPD) OPERATION & MAINTENANCE (O& M) PLAN ENHANCEMENT (Formation)
Institut de formation:
ARMM SOCIAL FUND PROJECT-PROJECT MANAGEMENT OFFICE & DEPARTMENT OF SOCIAL WELFARE & DEVELOPMENT
Date de la formation:
November 2012
 COMPUTER-AIDED CONSTRUCTION PROJECT MANAGEMENT ( USING PRIMAVERA 6.0 ) (Formation)
Institut de formation:
CRESCENT TECHNOLOGIES MANILA PHILIPPINES
Date de la formation:
May 2014
Durée:
25 heures
EMPLOYMENT FORUM EMPOWERING DYNAMICS & COMPETITIVE JOB SEEKERS (Formation)
Institut de formation:
Western Mindanao State University-Guidance And Counseling Center
Date de la formation:
March 2010
FINAL SCREENING OF QUALIFIED APPLICANTS FOR PROJECT STAFF IN BASILAN PROVINCE, ASFP-JICA (Formation)
Institut de formation:
ARMM Social Fund Project-Project Management Office
Date de la formation:
August 2011