Site Supervisor
L.M Ericsson
Total years of experience :9 years, 9 Months
Supervise Installation of 4+0, 1+0 links using 15Ghz, 23Ghz, 7Ghz radios, 20p AMM
Configuration and Commissioning of installed links
Conducting of XPD alignment to ensure steady link performance.
Facilitate Acceptance Test Procedure (ATP)
Configuration and patching for IP via DU
Mapping of channels for cut over
Upgrade from 6p AMM to 20p AMM and also from MMU 2D to MMU 2H
Facilitate Quality Assurance (QA)
Mentor of ASP on installation procedure
Ensure installers follow safety process
Monitor installation of RBS 6000 series
Supervise connection of DC/AC power
Supervise connection of RF cabling and External radios
Connecting on site Transmission and verifying RBS installation for 3G.