احمد فرج عبد الغنام, engioeer

احمد فرج عبد الغنام

engioeer

biltek Company ,

البلد
العراق
التعليم
بكالوريوس, قسم الكهرباء - قدره ومكائن
الخبرات
11 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 1 أشهر

engioeer في biltek Company ,
  • العراق - بغداد
  • أغسطس 2003 إلى أغسطس 2014

Companies which I worked with it and detail of this working :-
A- I worked as artistic for maintenance (cars electrical system ) from 1994 to 1998 .
B- I worked in United Alwaleed company for (contracting &general commerce ) and me
associate to yet since 2003
C- I carried out project as subcontractor with Turkish Biltek company at 4th Division (Iraqi
Army ) in Tikrit at (2005 - 2006 ), contract No.( W916QW-05-D-0008-0006 ) and cost
( 1, 983, 000$ ).the items :-
1- installation generator 1750KVA, control panel, distribution panel
and change over .
2- installation generator 1000KVA, control panel, distribution panel and
change over .
3- installation generator 625KVA, control panel, distribution panel and change
over .
D- I carried out project for our company (United Alwaleed ) for structure of reception
building at 4th Division (Iraqi Army ) in Tikrit at (2006 ), contract No.( W-06-1101) and cost
(39, 700$).
E- I carried out project for our company (United Alwaleed ) for structure of live tents at 4th
Division (Iraqi Army ) in Tikrit at (2006), contract No.(W91GYO-06-W-1165) and cost
( 99, 844$ ) .
F- I carried out project as subcontractor with Al-Foad company at 4th Division (Iraqi Army )
in Tikrit at (2005 - 2006 ), contract No.( W916QW-05-D-0008-0006 ) and cost (
1, 983, 000$ ) to structure of Motor Pool and workshop .
G- I worked as resident engineer with Daar Al-juboori company for
maintenance of didactic Tikrit hospital at (2007). The :-
1- Maintenance of generator 1500KVA . by me .
2- Maintenance of central air-condition system . by me.
3- Maintenance of emergency light system . by me .
4- Maintenance of general light system . by me .
5- Maintenance of black water drainage system .
6- Maintenance of interior telecom system .
7- Maintenance of dumb-waiters .
8- Maintenance of central Oxygen system
9- Maintenance of civilian works .
H - I worked as subcontractor for maintenance of central control system for Tikrit granary
and supply & install T.V system (cameras) and interior telecom. With cost ( 55000 $ ) at
(2007).
I- I carried out project for our company (United Alwaleed ) for structure of black water
drainage system at 4th Division (Iraqi Army ) in Tikrit at (2006 ), contract
No.( W91GFL-08-M-0218 ) and cost (9, 980$).
J- I carried out project as subcontractor with Turkish Biltek company at Bayji refinery in Bayji
at (2008 ), contract No.(W917BE-07-D-0001 ) and cost (1, 000, 000$).the items :-
1- Installation generator 500 KVA .
2- Installation control panel .
3- Installation distribution panel.
4- Installation change over panel .
5- Installation transformer 500 KVA .
6- Installation circuit breaker (high voltage/ 11000V ).
7- Supply and Install cable (high voltage/ 11000V ) for feeding .
8- Supply and Install cable( low voltage) multi-sizes and multi- distance for
feed the load .
K- I have work-shop ( Al-Haitham Engineering office ) for supply, Install and
maintenance \{cables+generators + stations+ transformers +panels ( multisizes
and multi-power)\}.
L- supply and install change-over . and maintenance of the generator 150KVA
and modulation it from manual to automatic.
M- I worked with Biltek Company as quality control QC \ Project Manager on
EOD project cost 00 from 1Mar 2009 to 1Nov2009 ؛ .
N- I had trained in Japan about operation and maintenance of Wheel loader
KAWASAKI " look at certification sheet bottom .
O- I worked with VERSAR US Army Corps of Engineers CETAG-Versar as
project engineer \ Quality assurance (QA) project engineer \ Quality
assurance (QA) Project Manager . look at certification sheet .
CEGRD-.mil
P- I had trained for SAFETY AWARENESS. Look at certification sheet bottom.

الخلفية التعليمية

بكالوريوس, قسم الكهرباء - قدره ومكائن
  • في جامعة الوصل - كلية الهندسة
  • يوليو 2003

النظام الجامعي لكليات الهخندسة في العراق : 1- تمنح البكالوريس بمدة 4 سنوات . 2- درجة النجاح الصغرى 50%

Specialties & Skills

Electrical Testing
Operating System Internals
Release Engineering
Control System Designer

اللغات

الانجليزية
متمرّس

العضويات

لايوجد
  • لايوجد
  • January 2007

التدريب و الشهادات

َQC , QA . project manager (تدريب)
معهد التدريب:
us army - corp engineer
تاريخ الدورة:
August 2007
المدة:
120 ساعة

الهوايات

  • كرة القدم
    لا توجد