construction manager
M/S DP. Consult: M/S: Dewan Architects+ Engineers Consultant.Contra M/S:Ginco Gineral Contracting
Total years of experience :9 years, 8 Months
, L, C
Responsible for:
•Structure works.
•Co-ordinate with sub-contractor.
• Arrange man power& equipment required
•Reviewing drawings.
•Reports (daily & weekly & monthly).
•Monitoring progress in site.
The project is individual villa ( pre-cast structure system ) with all activity till turn key
•Clint
(Telal El-Sokhna and Telal El Almain):
•Designed by ZAHA HADID.
•Consultant OKOPLAN for urban design.
•Main contractor is (Rooya for Construction).
•Project coast is 2, , , EGP.
•Project area 3 sq km in El-Ain El-Sokhna Egypt.
• villas & chalets, unit sizes from sqm to sqm.
•6 km beach front.
•Marina.
•5 & 3 Star Hotels.
•Restaurants.
•Sports Courts.
Treated water station in NEW QENA CITY -Egypt
2- Elevated Water Tank Project with () m3 capacity in New Asyut city
•Super Structure works (shaft wall) by sliding work system- Lift Slab Company “sub constructor”.
3- Infra structures
1- Water Distribution Works (with.5 Km length) in new Assiut City, Egypt.
2- Sanitary Sewer System works (.5 Km length) in New
mirdif development
Project includes : Consist of no .of (G+4) residential buildings.
Client
1-Main Drainage Line Project (5. km length) inth of Ramadan city, Egypt
2-Water Distribution works (with.5 Km length) in new
El Minia city, Egypt.
3- Sanitary Sewer System works (9.5 Km length