مهندس تطبيقات الكترونية
PTS
Total years of experience :10 years, 3 Months
Read The Electrical Diagrams (Power & Control Diagrams) for Each Machine IN The Factory, also Read the Automation & Control Spare Parts catalogs and Wiring Manual
Testing all electric components (fuse-breaker-contactor-relay- motor-heater-sensor- inverter -timer-temperature controller-transformer and other).
Diagnose electrical problems on machine by tracing and finding short circuit.
Identify the faults in the maintenance schedules.
Electrical wiring work in the factory.
design some control panel in the factory.
Do some maintenance to electrical and mechanical faults in the plant factory systems such as central air system and central cooling system and a desalination plant pumping water
بكالوريوس خمس سنوات بتقدير عام جيد ومعدل تراكمي (68.16%)