Ali Badr, Technical  Project and Sales Engineer

Ali Badr

Technical Project and Sales Engineer

TIG TESCO INTERNATIONAL LTD

Lieu
Arabie Saoudite - Jeddah
Éducation
Baccalauréat, Mechatronic Engineer
Expérience
12 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :12 years, 2 Mois

Technical Project and Sales Engineer à TIG TESCO INTERNATIONAL LTD
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis mars 2015

• Design, Drawing and Fabricating the Odor Control Systems in Sewage water Plants Department.

• Handling and Developing for Electro Mechanical Equipments in Sewage water plants Department

( Screens, Penstocks&Wiers, Conveyor, Grit/Sand Classifier, Aeration Blowers, Traveling Bridge, Cranes ).

• Handling Instrumentation Equipments ( Temperature controllers & Indicators, Paperless Recorders ), Green Building Technology ( BTU, Water & Electricity Meters, Automatic Meter Reading & Billing System).

• Handling and Developing for Control Valves
(Globe, Butter fly, Ball, PTFE Lined, PFA Lined, Pressure Reducing Valve, Self operating Temperature controller, Self operating Pressure controller, Regulators with Pneumatic Controlled etc and Electro Pneumatic Positioners, Pneumatic Positioners Actuators etc……

• Handling and Developing for pumping equipment ( dosing pump, Centrifugal pump, etc……)

• Contributing to the achievement of target revenue through effective sales process management

• Seek out and target new customers and new sales opportunities, initiate action plans to approach and secure new business for the Division.

• Effectively communicates with Customers and convinces them with the company’s products and services.

• Collaborate with sales teams to understand customer requirements, to promote the sale of company products, and to provide sales support.

• Developing long-term relationships with clients, through managing and interpreting their requirements

• Study and analyze the market and develop a sales strategy

• Prepare the Tender Estimation study, both Priced and Unpriced parts, according to the running market rates.

• Estimate the required directs Cost and indirect cost.
• Prepare the Resources (Labor & Equipment), Method statement, Technical Data Sheets etc.… for technical offer.
• Co-ordinate with suppliers and subcontractor.
• Review tender documents, DWG, BOQ & specs for any conflict between them.

• Attend site visit and study project location and the surrounding expected problems.

• Attend pre-tender meetings and prepare pre-tender clarification to Client.
• Budgeting and Financial Control for Projects.
• Cost Management for Projects.
• Finally prepare Financial & Technical Submittal.
• Project Planning and Control Techniques.
• Supervision of Installation and Commissioning

Electro Mechanical Engineer à Interyarn Textile Company
  • Egypte - Alexandrie
  • septembre 2013 à décembre 2014

• Supervision of Testing and Maintenance for Transformers & Diesel generator.
• Supervision of Installation, Testing and Commissioning for Rieter Textile
(Germany ) Machinery .
• Testing for Automation and Instrumentation System .
• Ensure resolving Technical Malfunction of Mechanical Machines.
• The Implementation of Preventive Maintenance for Electrical Panels.
• Testing and Maintenance for Electro Pneumatic system.

Electro Mechanical Engineer à Elshamadan Of manufactures food.
  • Egypte - Alexandrie
  • janvier 2012 à août 2013

• Supervision of the Maintenance for Diesel generator.
• Supervision of Installation and Commissioning for Mechanical machines.
• The Implementation of preventive maintenance for HVAC.
• Testing and Maintenance for Single Phase & Three Phase Motor .
• Design and Implementation of Electrical Panels.
• Testing and Maintenance for Automation and Instrumentation System .

Éducation

Baccalauréat, Mechatronic Engineer
  • à Alexandria University
  • juillet 2011

• Grade of B.Sc. certificate very good. • My rank is 8th among my department.

Specialties & Skills

Electro mechanical
Automation
Electrical Installation
Electrical Testing
Electrical Maintenance
Auto Cad 2D & 3D
Control System & Maintenance Equipment
electro mechanical equipment in Sewage water plants
Machines & Generators
Odor Control Systems in Sewage water plants Department
computer Skills
protection
power systems
power distribution
maintenance engineering

Langues

Anglais
Moyen

Formation et Diplômes

summer training (Formation)
Institut de formation:
Mantrac campany
Date de la formation:
July 2010
Durée:
40 heures
summer training (Formation)
Institut de formation:
Abu Quir for fertilizing campany
Date de la formation:
August 2009
Durée:
40 heures
ICDL (Formation)
Institut de formation:
unesco egypt icdl
Date de la formation:
January 2009
Durée:
40 heures
Embedded system microcontroller level 1 (AVR) (Formation)
Institut de formation:
new horizon alexandria
Date de la formation:
August 2008
Durée:
40 heures
PLC (level 2) [siemens ( s7-300) , siemens ( s7-400) ] (Formation)
Institut de formation:
alfa tech group
Date de la formation:
October 2011
Durée:
40 heures
PLC1 (level 1) [ LG , siemens ( s7-200) ] (Formation)
Institut de formation:
alfa tech group
Date de la formation:
October 2010
Durée:
40 heures
Embedded system microcontroller level 2 (AVR) (Formation)
Institut de formation:
alfa tech group
Date de la formation:
October 2011
Durée:
40 heures
Printed circuit board (PCB ) design (Formation)
Institut de formation:
alfa tech group
Date de la formation:
December 2010
Durée:
40 heures
Circuit breakers & Short Circuit Calculation With DOC Software (Formation)
Institut de formation:
ABB Group - Automation and Power Technologies
Date de la formation:
March 2016
Durée:
24 heures
summer training (Formation)
Institut de formation:
petrochemical campany
Date de la formation:
July 2009
Durée:
40 heures