Managed many projects in the mining industry

Project Manager at McArthur River Operations- Saskatchewan
  • Canada
  • August 2012 to January 2014

McArthur River Operations- Saskatchewan, Canada
Project Manager, August 2012- Date
Managed following projects: 1- 530L Electrical Room Upgrade (5KV Switchgears and Soft Starters)
2- Brine Pumps Mechanical Upgrade. ( Replacement of 1000m3/h pumps and piping)
3- 5KV Twin Power Feed
4- Shaft #3 Water for Industrial Usage
5- Boomerang Lake Discharge Upgrade
6- Fire Water Line Upgrade

Prepared project charter, project management plan, project construction and commissioning plans,
Prepared BWS, schedule, and activity network.
Prepared budgets monitored and controlled projects expenditure.
Managed design work.
Coordinated and supervised construction work in collaboration with the site construction management team.

Project Manager at Cigar Lake Uranium Mine Project
  • Canada
  • April 2010 to July 2012

Cigar Lake Uranium Mine Project- Saskatchewan, Canada
Project Manager, April 2010- July 2012
Managed engineering work for the following units: 1- ROM Storage and Reclamation
2- U/G Grinding
3- Water Circulation and Clarification.
4- Ore Slurry Hoisting.
5- Electrical Room.
6- Laboratory and Control Room
7- Slime Disposal and Storage.
Prepared engineering work package plan including scope of work, schedule, and estimates.
Supervised design team in collecting and reviewing the existing designs and other relevant technical information. The team had validated the existing technology and designed additional steps and facilities to optimize the process flow sheets.
Supervised all disciplines in completing deliverables (drawings, calculations and technical reports), reviewed and approved all these deliverables before submitting to client.
Defined constructability and maintainability - spatial and functional considerations in terms of people movement, material and equipment and installation/ construction.
Prepared the Work Breakdown Structure, defined project scope, estimated costs, and prepared, monitored and controlled schedule, cost and quality.

Project Manager for the Construction of Steam Boiler at Daura Refinery
  • Iraq - Baghdad
  • January 2006 to January 2008

Daura Refinery, Baghdad, Iraq
Project Manager for the Construction and start-up of 150 t/h steam boiler 2006-2008
Developed bid, conducted contract negotiations and prepared work plans, construction management plan.
Organized the site construction office and acquiring required resources (7 engineers, 80 employees, inspectors, administrators, site workshop, cranes, welding machines and other tools)
Analyzed results of civil work and proposed solutions to solve errors in foundations elevations and orientation and supervised repairs.
Analyzed inventory of equipment and made purchase orders for important missing parts (DCS software and main steam control valves)
Supervised the Redesign of many parts of the plant ( common steam collector, relocation of steam non return valves, main steam silencers and steel structure, burners local panels, and many piping rerouting)
Successfully started up and commissioned the plant and achieved required capacity and product parameters.


Cement

Iraq- Project Manager at Al-Merjal General Contracting Company
  • January 2002 to January 2008

2002-2008 Al-Merjal General Contracting Company, Iraq- Project Manager

Project Manager for Rehabilitation of 8 Gas Power Units at Fluor
  • United Arab Emirates
  • January 2005 to December 2005

Project Manager for Rehabilitation of 8* 22 MW capacity mobile gas power units 2005 GC: Fluor and AMEC

Developed work plans, construction activities, staffing, quality control plans, safety procedures and equipment and materials deliveries and prepared and issued progress payment invoices.
Successfully managed both projects with manpower at peak time of 15 engineers and 400 other employees.
Collected, analyzed all operating parameters of the plant before plant shutdown and all information from client and end user to pin point major bottlenecks affecting plant production capacity.
Liaison with operating company management and client to schedule stoppage of units and common plants like hydrogen unit, compressed air plant and water treatment plant and prepared effective schedule.
Supervised replacement of major parts of the boilers (capacity 715 t/h steam), 15000 total number of welding joints, maintenance of two and replacement of one water intake pumps (capacity 33000 c.m. /h each) replacement of turbines bearings and realignment of turbines, generators, screens, and revamping of compressors, hydrogen production unit, BFW pumps, field instrumentation, boiler and piping insulation, and piping and fittings.
Supervised construction of temporary and permanent compound of 40 rooms, 20 caravans and all service facilities (communication, security walls, and canteens)

Project Manager for Rehabilitation of 4 Thermal Power Units at Bechtel International Systems Inc
  • Iraq
  • January 2004 to January 2005

Project Manager for Rehabilitation of 4* 220 MW units and BOP 2004- 2005 GC: Bechtel International Systems Inc.,
Baiji Gas Power Station, Baiji-Iraq

Project and Site Manager at Kubaisah Cement Plant
  • Iraq
  • January 2000 to December 2001

Kubaisah Cement Plant, Anbar- Iraq
Project and Site Manager for the Rehabilitation of clinker crushers and transport system 2000-2001
Prepared bid and conducted contract negotiations and prepared work plans, procedures.
Identified, assessed, and analyzed clients requirements, developed specifications for materials and equipment to be purchased such as buckets, heat resistant plate, idlers and pneumatic cylinders.
Supervised the replacement of four cement clinker bucket conveyors (capacity 200 t/h each, total length 600 m) and designed, supervised fabrication and installation of four new chutes, replacement of crushers lining, insulation, field instrumentation and drive system.

Libya- Senior Development and Research Engineer at General Company for Chemical Industries
  • January 1997 to December 2001

1997-2001 General Company for Chemical Industries, Libya- Senior Development and Research Engineer

Senior Research and Development Engineer at 2- Industrial waste water treatment unit
  • Libya
  • January 1997 to January 2001

Senior Research and Development Engineer 1997-2001
Initiated, developed and evaluated proposals for the following projects: 1- Sulphuric acid re-concentration unit.
2- Industrial waste water treatment unit.
3- PVC packaging plant.
4- Industrial gases production plant.
5- Prefeasibility study for doubling of complex capacity.
6- Studied, analyzed and proposed solutions for many process problems in the process plants
7- Prepared technical specifications, SOW & BOQ and tender documents, and studied and analyzed offers for these projects

Power Generation
Baiji Thermal Power Station, Baiji- Iraq

Iraq- Project Manager at Fertilizers Projects Commission
  • Iraq - Baghdad
  • January 1989 to December 1996

1989-1996 Fertilizers Projects Commission, Iraq- Project Manager

Project Engineer design, construction and start-up at Fertilizers Projects Commission
  • Iraq - Baghdad
  • January 1993 to January 1994

Single Superphosphate Fertilizers Plant, Fertilizers Projects Commission, Anbar, Iraq
Project Engineer design, construction and start-up 1993-1994
Initiated the project and executed, with a team of three engineers, laboratory, bench scale and pilot plant trials to find the optimum operating parameters for the design of the plant to produce 100, 000 t/a of SSP and 150, 000 t/a of TSP fertilizer.
Supervised Design and fabrication, construction and commissioning of all material handling equipment.
Awarded a patent right from the Iraqi Patent Board for applying this process on the Iraqi ore for the first time.
Petrochemicals
Abu-Kammash Petrochemical Complex, Zuara- Lybia

Project Engineer at Reconstruction of Nitrogen Fertilizers Complex
  • Iraq - Baghdad
  • January 1992 to January 1993

Project Engineer for Reconstruction of Nitrogen Fertilizers Complex 1992-1993
Prepared work plans, schedule, budget and procedures.
Inspected, assessed extent of damage to equipment, and prepared SOW & BOQ for the required equipment and materials. This complex has two plants with capacities of 66, 000 t/a and 420, 000 t/a of prilled urea with ammonia plants, desalination units, steam boilers and other utilities and services. There was severe damage to major equipment like prilling tower, CO2 absorption tower.
Supervised removal of damaged equipment, installation of new equipment and fabrication of equipment in the local market and coordinated the work of six subcontractors.

Project Manager for Reconstruction and Restart at Fertilizers Projects Commission
  • Iraq - Baghdad
  • January 1991 to January 1992

Project Manager for Reconstruction and Restart up of the plant 4 M t/y capacity, 1991-1992
Inspected, assessed extent of damage to equipment and systems, and prepared SOW & BOQ. There was huge damage to bottleneck points in the plant like electrical substation, kilns burning zones and bearings, kilns feeding system.
Planned all activities, prepared detailed schedule, prepared detailed lists of required resources and prepared cost estimate and budget for the project.
Monitored and controlled progress of work.
Supervised and coordinated activities between subcontractors

Fertilizers
Ammonia and Urea Plant, Fertilizers projects Commission, Basra- Iraq

Project Manager at Plant 6 M
  • Iraq - Baghdad
  • January 1989 to January 1991

Project Manager for Plant 6 M t/y capacity 1989-1991. GC: Klöckner Industrie-Anlagen
Prepared a preliminary feasibility study to build a new phosphate processing plant.
Prepared work plans, budgets, and execution schedule.
Prepared technical specifications and tender documents, evaluated offers and prepared contract with the contractor.
Designed the general layout and proposed interconnecting points with the existing plant.
Headed approval team for the engineering work.

pm at Phosphate Beneficiation Plant
  • Iraq - Baghdad
  • January 1990 to December 1990

Contract was suspended late 1990 because of international sanctions

Phosphate Beneficiation Plant, Anbar- Iraq

Project Engineer at Phosphate Beneficiation Plant
  • Iraq
  • January 1987 to December 1988

Phosphate Beneficiation Plant- Anbar, Iraq
Project Engineer for 4 M t/y capacity Phosphate Plant 1987- 1988, GC F.L. Smidth of Denmark
Checked and approved engineering work (specifications, material balance, construction procedures, safety and quality assurance plans)
Coordinated construction activities of the phosphate beneficiation plant with general contractor (Sybetra of Belgium), subcontractor (F.L. Smidth of Denmark) and third party inspector (Bureau VERITAS) . The plant consisted of screening & crushing section, Two lines of Calcination, slaking section, and wet post treatment section (screening, milling, cyclones separation, centrifuges, filters)
Supervised start up and commissioning activities.
Designed and supervised major modifications in the plant especially in the transport systems and final product separation which resulted in increase of capacity by 10% and reduced down time considerably.
Phosphate Beneficiation Project - Anbar, Iraq

Anbar, Iraq- Production Engineer/Production Manager/Plant Manager at General Company for Phosphate
  • January 1978 to December 1988

1978-1988 General Company for Phosphate, Anbar, Iraq- Production Engineer/Production Manager/Plant Manager


Key Project Involvement
Mining& Mineral Processing

Education

Bachelor's degree, Mining Engineering
  • at University of Wales
  • September 1980

B.Sc. (Honors) in Mining Engineering, University of Wales, Cardiff, Wales, United Kingdom Member of Professional Engineers of Ontario (PEO) Canada Currently Perusing PMP Certification

Bachelor's degree, engineering
  • at university college cardiff uk
  • September 1980

Specialties & Skills

CONTRACT NEGOTIATIONS
ENGINEER
FABRICATION
PRODUCTION ENGINEER
PROJECT ENGINEER
PROJECT MANAGER
SOLUTIONS
TECHNICAL SPECIFICATIONS

Languages

Arabic
Expert
English
Expert

Memberships

Professional Engineers of Ontario (PEO) Canada
  • Member