مجموع سنوات الخبرة :18 years, 1 أشهر

Civil Construction Manager في First Fix
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أكتوبر 2022

• As the Construction Manager at First Fix Company.
• I was responsible for overseeing the construction of Almoosa Hospitals in the Al-ehsaa Area.
• This challenging project required careful coordination and management of all aspects of the construction process, from the initial site preparation to the final finishing touches.
• Throughout the project, I worked closely with the design team, contractors, and subcontractors to ensure that the work was completed on schedule, within budget, and to the highest possible standards. I was also responsible for managing the project budget, monitoring construction progress, and ensuring compliance with all relevant safety and environmental regulations. Despite the many challenges that arose during the project, I am proud to say that we completed the work on time and to the complete satisfaction of our client.

Civil Project Engineer في Ramaco
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أغسطس 2020

P0125 - Floresta Tower (1B+2Podium+M+15F+3Penthouse+Roof+Amenities)
• Assist in initiating of the project execution plan (PEP).
• Assist with the administration, budget and scheduling of projects.
• Check the civil design of projects to ensure compliance with the plan.
• Review drawings, method statements and material submittals required for site execution.
• Coordinate with Construction Manager & Project Managers for daily programs and target activities.
• Coordinate with Design, Mechanical and Electrical departments and other related technical departments.
• Coordinate with Procurement and Purchasing department for material requests, specifications and deliveries.
• Supervise civil installations and operations to ensure compliance to design and equipment specifications as well as in the operational and safety standards.
• Supervise and provide instructions, technical advice and support to Foreman, Chargehand and other site team members of the project and ensure all works are completed as planned and scheduled.
• Oversee and monitor the daily works of the sub-contractors.
• Update of work progress and target completion of activities.
• Investigate site problems and recommend solutions.
• Implement occupational health & safety, environmental and quality standards in accordance with the company policies at the project site.
• Prepare daily reports for superiors as requested.
• Provide schedules for subordinates and ensure its clearness.
• Highlight the strengths of labors (or high performing labors) and provide recommendations.
• Perform other duties as may be assigned from time to time.

Senior Site Engineer Acting Shift Site Manager في BUTEC
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ مايو 2017

Arrange planning with team, Progress with reporting to PM/CM and follow daily with activities and needs. Coordinate and solve of logistics, delivery of material activities and solving the problems that can affect the needed targets in the plan.
Main construction works such as : execution 3m thick raft, heavy concrete works, 1to 3m walls thicknesses with height varies from 6m to 13m, suspended slabs including walls and partition walls, columns, strut beams..etc.
Technical Support for the project team, delivery of material, Ordering of material as per approved vendor, checking of invoicing to the client, Team leading on site group of 300 workers with general Forman, Forman and lead men , hold on heavy civil jobs together with construction team on site, delegate activities to the team to reach the main focal target from the team works.
Coordination with QA/QC and Follow up with the inspections and accelerate the procedure of inspections prior to concrete, rectify any urgent detail on site.
Supervise major concrete activities (3000 to 4000 cum of concrete per one item) and assure the good quality and finishing by the team.

Senior Site Construction Engineer في Builders Advanced Engineering
  • قطر - الدوحة
  • أغسطس 2018 إلى يونيو 2020

Key Responsibilities:
• Responsibility for execution one of the of biggest bridges in the State of Qatar Under Ministry of Works Ashghal.
• Evaluation of construction teams and selections of productive manpower specially rentals
• Coordinate and solve of logistics, delivery of material activities and solving the problems that can affect the needed targets in the plan On daily Basis with strong management presence.
• Attend Client & Consultant Meeting to update on progress and solve any issue that might affect the quality and HSE of the works.
• Supervise and follow up on the production teams for shuttering and concreting of the major concrete project.
• Professional Experience with professional teams in execution Heavy duty shutter formwork like Doka/RMDK/Manar Alomran/Akro/Peri.
• Construction of huge Bridge footings
• Construction for underpass bridge execution.
• Construction of Piers with height up to 18 m.
• Shoring of 90m length with various heights for spans from 8 to 14m high.
• Construction of Bridge Deck with all details including Abutments Diaphragms bottom deck webs and top deck with construction joints.
• Installation of Bridge bearing pads and all details for Bridge Supports including monolithic and hinged supports.
• Expansion joints Detailing and execution
• Post-tensioning Bridge Experience from A to Z.
• High Management Experience in cost controlling and resource preference and estimating for activities.
• Working under high safety requirements and procedures.
Key Project:
Project P017 East Industrial Road Bridge
Duration Dec2017-october 2019
Client Ashghal Qatar
Main Contractor Tekfen Construction/Aljaber Engineering
Sub-Contractor Builders Advanced
Consultant Parsons
Value 160 MQRS

Project Engineer Acting Site Manager في BUILDERS ADVANCED ENGINEERING AND CONSTRUCTION
  • قطر - الدوحة
  • فبراير 2016 إلى مايو 2017

Main Contractor : Schlumberger
Design Concultant : ACE.
Consultant : Artilea.
Main Role :Arrange planning & Progress and reporting to PM/CM and follow daily with activities and needs. Coordinate and solve of all logistic and delivery of material activities and solving the problems that can affect the needed targets in the plan, Attend Client & Consultant Meeting to update on progress and solve any issue that might affect the quality and HSE of the works, Technical Support for the project team, delivery of material, Ordering of material as per approved vendor.
NB: 3 months acting PM position due to emergency needs by PM.

Site Construction Manager في BUILDERS ADVANCED ENGINEERING AND CONTRACTING
  • قطر - الدوحة
  • يونيو 2015 إلى فبراير 2016

Project Name and Scope : Construction of 200x100x9m Reservoir including all accessories and waterproofing systems, Process Buildings, DAF building, Pump House, Piling, Shoring inside sea using Secant Piling (w/ swiss boring as subcon) and major dewatering activities with Aljabor Engineering.
Consultant : Fistner
Client :Kahramaa
Main Contractor : TTCL (TOYO THAI COORPORATION LIMITED), Acciona Aqua.
Main Role :Arrange planning & Progress and reporting to PM/CM and follow daily with activities and needs. Coordinate and solve of all logistic problems that can affect the needed targets in the plan, Attend Client & Consultant Meeting to update on progress and solve any issue that might affect the quality and HSE of the works, Technical Support for the project team, delivery of material, Ordering of material as per approved vendor, Checking and follow up on the production teams for shuttering and concreting of this major concrete project.

TECHNICAL COORDINATOR في BUTEC
  • قطر - الدوحة
  • يناير 2014 إلى يونيو 2015

Project Name and Scope :Marina District Cooling Plant.
Client : (MARAFEQ QATAR-QDVC)
Consultant : Marafeq Qatar
Design Consultant : AEB (Arab Engineering Bureau)
Client :Kahramaa
Main Contractor : BUTEC ADC Share Holder.
Main Role :Arrange Detailed Design For Civil, architectural and Utilities installation related to district cooling plant 90000RT details with our partner ADC and our approved design consultant, reporting to PM/CM and follow daily with activities and needs. Coordinate and solve of all Design & Construction problems and or updates that can affect the needed targets in the plan, Attend Client & Consultant, subcontractor technical Meetings to update on progress and solve any issue that might affect the progress of the works, Technical Support for the project team, delivery of material, Ordering of material as per approved vendor, Quantity Surveying for urgent and long lead items.

Site Construction Manager في BUTEC
  • قطر - الدوحة
  • أبريل 2012 إلى ديسمبر 2013

Client :HIA
Designer : Alghafari
Main Contractor : BUTEC JOHNSON CONTROLS.
Main Role :Arrange planning & Progress and reporting to PM/CM and follow daily with activities and needed to construct one of the critical parts CP69 HIA project “security fence for area Amiri interfacing with Passenger terminal”. Coordinate and solve of all Design & Construction problems and or updates that can affect the needed targets in the plan, Attend Client & Consultant, subcontractor technical Meetings to update on progress and solve any issue that might affect the progress of the works, Technical Support for the project team, delivery of material, Ordering of material as per approved vendor, Quantity Surveying for urgent and long lead items.

Consultant في ENERGO PROJEKT
  • قطر - الدوحة
  • يناير 2011 إلى أبريل 2012

• QP scope :Design of several structures such as BOX CULVERTS, RMU BUILDINGS, BLAST RESISTANT BUILDINGS, STEEL, PEDESTALS..etc under the knowledge of sap2000, & based on BS standards & QCS. Design also includes drafting works and bar bending schedules as per QP standards.
• Direct Communication with the Client Understanding and Solving Problems and finding solutions.
• KM scope :Supervision and follow up of design, material, quality plan and many other disciplines on the background of KM specification and BS standards per phase or developer projects.
Supervision of work includes following contractors in weekly basis on productivity and site conditions in order to maintain time schedules & quality of document to be submitted.

Design Coordinator في BUTEC
  • قطر - الدوحة
  • سبتمبر 2008 إلى ديسمبر 2010

Employer :BUTEC, Qatar (Branch of BUTEC WLL is Lebanese Company).
Title : Design Coordinator, Procurement Coordinator, and Site Inspector
Project : UMM BIRKA SUBSTATION “400/220/132/11KV” CONTRACT No. GTC / 144A / 2006
Consultant: ENERGO PROJETKT ENTEL
• Main Role :Coordination of all kinds of and services equipment with design structure and size such as" transformer bays, GIS. system and MEP, All drafting work, as built drawings, urgent designs, topographic data, All Civil quantity surveying "Concrete, reinforcement Steel, louvers, tiles, structural steel, grating, paint, Assurance that all works in compliances with client specification, Coordination Procurement, Experience with the design office “Qatari Engineering and Associates (QEA)” in understanding all types of structural calculation notes”, and comparing all the calculation with the design drawing, assure optimized designs to maintain quality and quantity of the design.

Structural Engineer في Creative Engineering Company
  • لبنان - بيروت
  • مايو 2006 إلى سبتمبر 2008

CEC is a lebanese company stated to held designs to sister company in USA named Midcities Engineering, Responsibilities
• Structural design of timber materials, projects located in LA city USA.
• Handled all drafting works.
• Developing a system "program" of spread sheets for all kinds of calculations and following all updates. Total number of sheets is 40 done on the same work book and linked all together. e.g. seismic analysis, wind analysis, gravity calculation loads…etc
• Total number of projects done in 2 years is about 500 structures including commercial centres, Luxurious Houses and so on.

الخلفية التعليمية

دبلوم عالي, Civil Engineering
  • في Lebanese University Faculty OF Engineering
  • سبتمبر 2006

Member of OEA Lebanon

Specialties & Skills

Contractors
SAP2000
Schedules
Autocad
Sap2000
CSC TEDDS
Microsoft Project
Primavera

اللغات

الانجليزية
متوسط
العربية
متمرّس

العضويات

Order of Engineers and Architects, Lebanon (OEA)
  • Part of the Certified Engineers and Architects in lebanon
  • January 2007
MMUP Certified UPDA Qatar Grade C
  • MMUP Certified UPDA Qatar Grade C
  • August 2014

التدريب و الشهادات

Project Management (تدريب)
معهد التدريب:
Order of engineers and Architects Beirut
تاريخ الدورة:
August 2018
المدة:
10 ساعات
UPDA (الشهادة)
تاريخ الدورة:
July 2014
صالحة لغاية:
June 2023
Master Degree (الشهادة)
تاريخ الدورة:
July 2006
صالحة لغاية:
January 2037
Diploma (الشهادة)
تاريخ الدورة:
September 2006
صالحة لغاية:
January 2037

الهوايات

  • Oud
    Oud Musician Player