ali ibrahim, deputy general manager

ali ibrahim

deputy general manager

AB POWER

Lieu
Turquie - Istanbul
Éducation
Diplôme supérieur, Mechanical Engineering
Expérience
23 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :23 years, 10 Mois

deputy general manager à AB POWER
  • Turquie
  • Je travaille ici depuis mai 2017

Management.Contracting lead.Technical advisor. Trading. Purchase. Team leader .Finance control

Strategic sales &marketing manager- middle east sales director.marketing development à ab power
  • Turquie - Istanbul
  • décembre 2012 à avril 2017

make trade with middle east and get order from customer for generator and lighting ballon system and heavy machinery - power plant spare part - oil and gas spare part and tools - electrical accessory tools and material we already sold approx. 4.5 million dollar for 2013 and 7 million dollar in 2014 and also we are doing export for any goods for our customer like tanks cars and construction machinery electrical equipment boards switchgear kiosk breakers wiring also

Procurement & Commercial Engineer à POWER PRODUCTION COMAPNY
  • Irak - Bagdad
  • février 2010 à septembre 2012

MAKE LIST FOR ALL NEEDS OF POWER PLANT AND MAINTENANCE PROGRAM SUCH MECHANICAL - ELECTRICAL - CONTROL - FUEL TRATMENT- CONTROL THE BUDDGET AND MONEY WITH THE CONTRACTOR FOLLOW THE RULES AND SHIPMENTS QUALITY

OPERATION AND MAINTENACE MANAGER à POWER PRODUCTION COMAPNY
  • Irak - Bagdad
  • juin 2000 à février 2010

JUNE 2000 START WORKING SHIFT ENGINEER ASS IN POWER PLANT SIEMENS STEAM TURBINE AND TG20 FIAT GAS TURBINE IN OPERATION DEPARTMENT AND ALSO IN GROUP OF MAINTENANCE FOR MAKING OVERALL MAINTENANCE TO THE 4 UNITS GAS &BOILER +TURBINE FOR 2 UNITS STEAM TURBIN WITH ALL COMMISION PROCESS

JAN 2001THEY TRANSFER ME TO 2 NEW GAS TURBINE PROJECT FRAME 9 GE GAS TURBINE 125 MW EACH TO INSTALL NEW POWER PLANT IN TURBINE AND AUXILIARY DEPARTMENT THE CONTRACTOR WAS DONG FANG COMPANY FROM CHINA IN THAT TIME WE FINISH ALL THE PROGRAM AND MAKING THE COMMISION TEST PLUS START OPERATION FOR ALL AUXILIARY EQUIPMENT SUCH WATER TREATMENT - FUEL TREATMENT - FIRE FIGHTING - TURBINE TEST WE SUCCES ALL THESE THING.

APRIL 2002 WORK IN SAME POWER PLANT SHIFT ENGINEER IN OPERATION DEPARTMENT AND MAKE ALL THE TRAINING FOR MY TEAM TO OPERATE THE UNITS IN SAFE AND GOOD CONDTION ALSO WRITE THE DEFECT MAKE ROOT CAUSE ANALYSIS HELP THE MAINTENANCE DEPARTMENT IN NIGHT TIME CONTROL ALL THR POWER PLANT TEAMS LIKE WATER AND FUEL TREATMENT ELECTIRIC GRID CCHOSSE THE LEADER TEAM MAK TEST FOR MY TEAM ALL THINGS BELOW THIS JOB.

SEP 2004 START INSTALL NEW GAS TURBINE LM6000 WITH BECHTEL AND FLOUR USA COMPANY 4 UNITS 43 MW EACH WITH ALL ACCESSORIES BELOWING IT FUEL -WATER FIREFIGHTING - GRID - TURBINE - CONTROL ROOM AND MAKE THE PROGRAM START THE UNITS IN OCTOBER 2005 WE HAVE MAKE ALL THE TEST AND COMMISION PROCESS THEY ADD INLET AIR COOLING SYSTEM (TIC) IT WAS THE NEWEST ONE IN IRAQ AND PREAPARE THE STUFF OF OPEARTING AND MAINTENANCE THE UNITS.

MARCH 2006 START PROGRAM FOR TRANSFER ALL GAS TURBINE FROM DISTILATE OIL TO HEAVY OIL CROUD OIL MAKE ALL THE PROGRAM WITH GE STUFF ADD ALL THE EXTRA ACCESSORIES EQUIPMENT PREAPRE THE LINES - HEAT EXCHANGER - FUEL SKIDS - FLASHING THE SYSTEM - HYD TEST - VANADIUM INHIBITOR SYSTEM - COMPRESSOR AND TURBINE WASHING SYSTEM - AND WE HAVE FINISH THE TRANSFER VERY GOOD IN PROFFESIONALY WITH THE FIRST START ON HEAVY FUEL PLUS MAKE THR FIRST WASHING PROGRAM.

OCT 2007 OPERATION DEPARTMENT LEADER WE HAVE 4 SHIFT PLUS 178 PERSON ENGINEER AND TECH FOLLOW ALL THE OPEARTION RULES AND GIVE THE TRAINING FOROWRD THE DAILY REPORT TO PLANT MANAGER MAKE THE MAINTENANCE AND WASHING PROGRAM CALCULATE THE COUNSAMBTION AND GENERATION HAVE ALL THE CONECTION WITH OTHER MAINTENANCE DEPARTMENT SUCH MAECHNICAL - ELECTRICAL - CONTROL - PLANING AND REPORTING - MANAGEMENT - FUEL - OPEN THE WORK REQUEST FOLLOW THE SAEFTY FOR OPEARTION TEAM.

SEP 2008 TRANSFER TO ANTHOR PROJECT 8 UNITS FRAME 6 GAS TURBINE ITS NEW POWER PLANT AND I WAS THE MECHANICAL INSTALATION SUPERVISOR FOLLOWING ALL CONTRACT ITEMS WITH THE CONTRACTOR GIVE DAILY REPORT WITH ALL EXPLANASTION MAKE THE PLANING FOR WORK AND TIME SCHDULE CHECK THE QUALITY AND THE EQUIPMENTS GIVING PREMSION FOR SOME COUNSTRACTION PART FOLLOW THE TEST REPORT TILL HE CONTRACTOR FINISH THE COMMISION ON THE UNITS AND START THE POWER PLANT AND WITH PEAK LOAD ON DISTILATE AFTER TRANSFER TO HEAVY FUEL ALSO.

FEB 2010 WORK IN PROCURMENT DEPARTMENT AS MANAGER ASSISTANT FOR IMPOERT THE POWER PLANTS NEEDS FORM SPARE PART - MATIERIAL - TOOLS - EVERTHING THEY NEEDS PLUS CHECK THE MAINTENANCE PROGRAM NEED LIST CHOSSE THE BREND AND QUALITY COMPARE THE SPACEFICTION AND PRICE WITH ALL THIS JOB RULES TILL I LEFT THE WORK IN OCT 2011.

Éducation

Diplôme supérieur, Mechanical Engineering
  • à Technical institute
  • juillet 2000

high specialization diploma

Specialties & Skills

Mechanical Maintenance
Trade Sales
Generators
Power Plant Operations
fire fighting system
genrator sale and after sale
computer and MARK VI system
root cause analysis for power station
computer and MARK VI system
mechanical mantinance
start and shutdown power units and make black start
hot bath maintinance for gas turbine
water treatment for power station RO system
microsoft windows

Langues

Arabe
Expert
Anglais
Expert
Turc
Moyen

Formation et Diplômes

SHIFT ENGINEER POWER STATION (Certificat)
Date de la formation:
August 2006
Valide jusqu'à:
January 9999
POWER STATION GAS TURBINE & STEAM PROJECT MANAGER (Certificat)
Date de la formation:
June 2010
Valide jusqu'à:
January 9999
water treatment susutem for power station (Formation)
Institut de formation:
ministry of elecitrcity
Date de la formation:
July 2009
Durée:
40 heures
MINISTRY OF ELECITRICITY (Formation)
Institut de formation:
HMI & MK V & MK VI FOR GAS TURBINE FRAME 5 AND FRAME 9
Date de la formation:
September 2008
Durée:
60 heures
MANTINANCE AND OPERATE GAS AND STEAM TURBINE (GE & BECHTEL ) (Certificat)
Date de la formation:
June 2005
Valide jusqu'à:
September 2010
generator sale and after sale manager (Formation)
Institut de formation:
ab power
Date de la formation:
November 2013
Durée:
40 heures
INSTALL GAS TURBINE AND POWER STATION (Formation)
Institut de formation:
MECHANICAL AND OPERATIONS (DONG FANG COMPANY)
Date de la formation:
February 2001
Durée:
150 heures
GAS TURBINE AND STEAM TURBINE OPERATION AND MANTINANCE (Formation)
Institut de formation:
GENERAL ELECITRIC ( GE & BECHTEL) AMMAN JORDAN
Date de la formation:
May 2005
Durée:
120 heures
COMMISION AND START UP GAS TURBINE FRAME 9 GE (Formation)
Institut de formation:
MINISTRY OF ELECTRICITY IRAQ
Date de la formation:
April 2003
Durée:
60 heures

Loisirs

  • Book Reading
  • drive car