Altaf ur Rehman, Electrical Project Manager

Altaf ur Rehman

Electrical Project Manager

Saudi Electricity Company

Lieu
Arabie Saoudite - Khobar
Éducation
Master, Electronics Engineering
Expérience
24 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 5 Mois

Electrical Project Manager à Saudi Electricity Company
  • Arabie Saoudite - Dammam
  • Je travaille ici depuis septembre 2010

My responsibilities at Saudi Electricity Company included:

 Managed EPCM Lump sum turnery Projects (Pre-award & Post-award) ranging from SAR 5M to SAR 214M, through their Life Cycle (initiation to close out).
 Prepared Bid Package, attending pre/post bid clarifications/queries, evaluation of Technical Proposal and Contract award recommendation.
 Worked with the team on development of Scope of Work and Technical Specification for U/G & OHTL as well as communication projects.
 Prepared detailed project cost estimates including engineering, manpower, material, and construction.
 Assisted in the preparation of Detail design of overhead transmission line as well as underground cable projects from 11 kV to 230 kV. Also, conducted feasibility and planning studies.
 Worked on acquiring the Right of Way (ROW) for the projects and interfaced with permitting agencies and regulatory bodies (different ministries, Saudi Aramco etc.) for their approval.
 Collaborated with different stakeholders. Assessed and approved Change Orders /claims.
 Coordinated various meetings such as design review meeting & bi-weekly / weekly progress meetings.
 Prepared daily, bi-weekly, monthly and management reports / presentations.
 Checked drawings & other technical documents for compliance to standards & requirements.
 Ensured complete compliance of electrical safety codes and OH&S requirements at sites.

I managed and completed following projects at Saudi Electricity Company:

 Construction of 115kV U/G to connect Halfmoon BSP to DIE 4A S/S.
 Interconnection of Nariyah-3 S/S through 115kV OHTL.
 Deployment of Remote Fiber Testing System in Eastern Operating Area (Phase-I).
 Construction of 115kV underground cable to energize West to Second DIE Substation.
 Installation of 115kV Cable between DIE 4 A & DIE 4B as well as DIE 6 B to DIE 4B to energize DIE 4B Substation.
 Construction of 115kV U/G cable between Takhassusi S/S and Khalidiyah S/S.
 Construction of 115kV U/G cable between Khalidiya S/S and KAAP S/S.
 Deployment of Remote Fiber Testing System in Eastern Operating Area (Phase-II).
 Rerouting of SCADA channels in existing substations in EOA.

GBSS Engr. à Huawei Technologies, Saudi Arabia
  • Arabie Saoudite - Riyad
  • mai 2008 à juillet 2010

DETAILED EXPERIENCE:

 Installation, commissioning, testing and PAT of BSC6000 V9R8,
 Operations & Maintenance of BSC6000 V9R3 & V9R8.
 Expansion, Configuration, Upgradation and Testing of BSC’s
 Integration, Troubleshooting, inspection and PAT of BTS 3012.
 Expansion, Configuration and Testing of PCU’s
 Upgradation of Patch versions of BSC’s
 Expansion of Media between BSC’s and MSC’s. E1’s as well as STM’s
 Expansion of Ater, A, Pb and Abis interface connectivities.
 Troubleshooting and Testing of Microwave Transmission specially NEC and
Siemens and PCOM.
 Creating and Troubleshooting E1’s on MW equipment of NEC, SEIMENS and
PCOM.
 BTS Alarm Management

Telecommunication Engineer à Pakistan Telecommunication Company Limited
  • Pakistan - Lahore
  • juin 2001 à mai 2008

Working as Senior Engr. NOC CDMA (NSS+BSS)

Supervision of Installation, expansion and O&M of BSC6600.
 Expansion of Media connectivity between BSC and MSC.
 Trouble shooting of BTS’s.
 Operations & Maintenance of Huawei’s CDMA Mobile Switch (M800 MSC/VLR) and HLR;
 Creation of Code Points, Trunk Groups, Trunks, Routing, and C7 links for Faisalabad Telecom Region, Central Telecom Region, Lahore Telecom Region and Gujranwala Telecom Region;
 Traffic Analysis;
 Addition of trunks (E1’s) in case of congestion on overloaded routes in co-ordination with PCM and other exchanges;
 Address subscriber complaints and provide appropriate solutions;
 creation and modification of subscribers data on MSC/HLR
 Modification of different parameters of WLL subscribers like ESN, IMSI, A-key and MDN’s.
 Traffic Analysis of different sectors of BTS’s
 Alarm management of BSC and to manage to fix problem in minimum possible time.

Working as Engr. (Ericsson)
in Network Management Center (NMC):
 Operations & Maintenance of a multi-tandem network of 16 Ericsson AXE-10 Exchanges.
 Rectification of E1 and board alarms.
 Traffic Analysis of Lahore exchanges.
 Maintenance of Routes/Trunks in all Exchanges
 Health check of E1 on all routes to ensure quality communications.
 Scheduling and coordinating various maintenance tasks.
 Coordination with various departments within the organization to ensure smooth and rapid maintenance and recovery of exchanges.
 Managing a team of 9 Supervisors and technicians for fault free operations of the exchanges.
 Creation and maintenance of E1’s.
 Preparation of feasibility reports for the provision of ISDN (BRI’s/PRI’s) services to Internet Service Providers /Data Communication Companies;
 Creation, and Configuration of ISDN services;
 Calculation of ASR (Answer to Seizure Ratio), and CFR (Call Failure Ratio) based upon traffic reports;

Research Officer à National Institute of Silicon Technology Islamabad, Pakistan.
  • Pakistan
  • décembre 1999 à mai 2001

Responsibilities included designing, installation, configuration, commissioning and testing of solar cell modules based Photovoltaic Systems.

• Implementation of various domestic standard solar electric system networks i-e for home appliances etc.

• Maintenance and Operation of CZ single crystal growth machine.
• The process of fabrication of solar panels consisted of the steps
• Conversion of Poly Crystal Silicon into Single Crystal Silicon
• Slicing of single crystal Si in wafers.
• Designing of PN junction on wafers to make a solar cell.
• Designing of solar panel by interconnecting the 40 cells so that one panel is capable to provide 20 volts and 2 A current.
• Finally system is designed to meet the needs for different applications.

Éducation

Master, Electronics Engineering
  • à University of Engineering & Technology
  • février 2007

In doing MSc Engineering I passed 8 theory subjects and a final thesis. The title of my thesis was, "Network congestion problem in PTCL and its solution by packetizing the traffic through NGN."

Baccalauréat, Electronics and communication Engineering
  • à University of Engineering & Technology
  • septembre 1999

It was four years Bachelor Degree. with tremendous theory and lab sessions.

Specialties & Skills

Materials
Installation
Commissioning
Testing
MS Office
Primavera

Langues

Urdu
Expert
Anglais
Expert
Arabe
Moyen

Adhésions

Project Management Institute
  • MEMBER
  • March 2021

Formation et Diplômes

Project Management Professional (PMP) (Certificat)
Date de la formation:
March 2021
Valide jusqu'à:
March 2024