Quality Management
ITP
Total years of experience :20 years, 7 Months
Review to improve
Area
Review to improve ITP and QCP as applicable on the project
•Review quality pack, loop folder and project drawing
•Executing EIL (Exemption Item List) punch list and remaining works.
•Attended Minute of Meeting for Percentage & Progress report of Quality report
•Witnessing Inspections of Testing cables Installations, Terminations in accordance of Project Standards.
•Responsible for the submission of RFI (ready for inspection)
•Responsible for Inspections & Installation of Cathodic Protections System, such like Magnesium Anode, Impress current Anodes & Pyramid Anodes.
•Monitor completed document against construction completed jobs
•Familiars about standards NFPA70, IEC, NETA.SAES(Aramco)
•Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment
•Reviewed ISS, P&ID, ILD and instrument location plan, hook up drawing and wiring diagram
•Responsible for any as built drawings and red line drawings
•Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation & electrical Workload
•Attended Quality and Construction meeting in weekly basis to discuss quality related issues
•Issued Non-Conformance report of all repetitive violation of company standard, specification, drawing, industry standard and codes
•Job involves compiling of number of input/output, cables routine decision correction of erection drawings, erection of control panel, cabling in work field, marking of cold checks for individual loop testing, Commissioning and testing
•Responsible for Documents hand over package to Consultant and Client.
Has been working as Quality Assurance & Control in Ambatovy project in Madagascar Africa,
•Responsible for ITP for the request of inspections. Encoding and monitoring of data sheet of Instruments.
•Issuances punch list and NON Conformances report.
•Compiling all Documents for the turn over packages. Insuring the documents are all completes after the whole inspection of every Systems are done.
•Reviewed ISS, P&ID, ILD and instrument location plan, hook up drawing and wiring diagram
•Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment
•Job involves compiling of number of input/output, cables routine decision correction of erection drawings, erection of control panel, cabling in work field, marking of cold checks for individual loop testing, Commissioning and testing
•Commissioning loop checks and some other works regarding for Inspections.
•Responsible for preparation of instrument specification, sheets for procurement.
Has been working as Commissioning and Quality contro inspectorl in Combine Cycle Power Plants in Qatalum Project at Messaid, Qatar
•Responsible for RFI to done the work with the safety coordinators and Qatalum Representative,
•Conduct of Final Test and Inspection before Start Up
•Requisitioning Material involve.
•Job involves compiling of number of input/output, cables routine decision correction of erection drawings, erection of control panel, cabling in work field, marking of cold checks for individual loop testing, Commissioning and testing
•Commissioning loop checks and some other works regarding for Inspections.
•Responsible for preparation of instrument specification, sheets for procurement.
•Responsible for Inspection and Commission and testing.
6).
Name of Company / Country
Has been working as E& I Inspector in multiphase desalination and power plants of gas and oil separation plant in Uhtmaniya,
Responsible for preparation of instrument specification, sheets for procurement.
•Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment
•Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation & electrical Workload
•Responsible for preparation of process instrumentation drawings, wiring diagrams, bill of materials, measuring loops etc.
•Involves in procurement of various primary and secondary instruments from various suppliers.
•Inspection of instruments and various vendor sites.
•Involved in instrumentation commissioning in gas plant in KSA.
8).
Name of Company / Country
Attended Quality and Construction meeting in weekly basis to discuss quality related issues
•Witnessing Inspections of Testing cables Installations, Terminations in accordance of Project Standards
•Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment
•Responsible for issuance of NON-Conformance report
•Familiar in Electrical standards like NFPA & IEEE
•Responsible for submission of Notification of Inspection
•Responsible for preparation of electrical and instruments.
•Responsible for all installation and termination wirings at the DCS cabinets.
•Team leader of electrical constructions.
Saudi Aramco PID Projects (MOH Collaboration) Jeddah
•BI-10-00060-4398 : Haradh Satellite maintain potential project
•BI-10-00060-4318 : On Shore maintain potential project Gas Up Stream Division
•BI-10-01032-5620 : Khuff Gas Project Haradh area.
•BI-10-01032-5653 : On Shore maintain potential project Gas Up Stream Division Haradh area
•BI-10-00060- 6600033989 : Hawtah Maintain Potential Project
•BI-10-01277 : On Shore maintain potential project Gas Up Stream Division
•BI-10-00791-3371: OMPPD Gas Upstream Project
exposure to data stream, drawings P and I, ID’s hazardous drawings.
•Highly skilled in setting up of control systems for power and desalination of plants by DCS system and ESD systems.
•Proceeding Inspection in installation of electrical power panel, LRP panels and other electrical constructions.
•Department of power projects in plant training.
•Trained in DCS System of power plant engineering by ABB and Honeywell
•ARAMCO certified with SAP No. 70016007 QC E&I inspector
•Well known to the Standards Electrical NFPA 70, IEC, NETA, SATIP, SAIC & GI
•Organize and see the implementation of the Quality monitoring through the (non) conformance (including recommendations, observations), Preventive action (PA) and Corrective action (CA) System
•Through the QA project team, verify and ensure that only the relevant documents are available with the construction crews. He will similarly make sure that all Quality documents are properly filed for future final documentation hand over to the Client.
GOSP 5 & 6 Abqaiq
Institute / Country Period (From – To)
Institute / Country Period (From – To)