Resident Engineer - Project Manager
Planquadrat Middle East.Engineering consultancy
Total years of experience :36 years, 2 Months
* Construction contracts management and baseline line planning for construction
and coordinating the design key elements.
* Projects control, construction supervision for superstructure buildings and
infrastructures including roads, services and utilities.
* Execution and supervision for offshore construction and marine works; sea
canals, islands reclamation, shore revetment, breakwaters.
* Project visibility and cost-control.
Detailed
Managing the construction of residential complex buildings of Muhammad Bin Rashid Housing Establishment in Al Quoz - Dubai.
Leading the site supervision engineering team of 20 engineers of the different disciplines.
Providing the full control/coordination on the construction activities, applications to authority and the project contractors outputs.
Reporting to Clients the related reports.
Projects:
• Al Marmooka City Ajman; development of 250 buildings comprising accommodation, financial,
trading facilities and services.
• Dubai Health Care City; luxurious clinic complex.
• Dubai Industrial City; food industry factories.
Infrastructure / Acting RE - Roads.
Project: Sharjah Investment City (SIC)
Client: SNASCO
Land Development of 330 hectares investment.
Roads and Infrastructure work costing around AED 680 Millions, serving 1100 individual multiuse plot
properties.
The project comprises 50km of roads services and utilities, Oil & Gas Pipelines Protection (Culverts),
networks of Sewerage, Storm Water, Potable Water, Irrigation, Fire Fighting, District Cooling systems.
132/33/11 KV Electrical Power Sub-stations, trench corridors & Etisalat networks.
Position : RE - Sea Canals Excavation / Marine Engineer - Breakwaters & Sea Shore
Revetment
Project: Nujoom Islands Development - Sharjah
Client: Al-Hanoo Holding Co.
Earthwork phase II,
Contract costing AED 303 Millions, comprises; excavation of 15 km forming 7 marine canals in a property
land area of 5, 574, 000 m² and reclamation of 3 offshore and 6 inland islands.
Marine Rock Work / Island Reclamation.
Contract costing AED 240 Millions, comprises; 1.6 million cubic meters of rock structures to build water
breakers, rock barricade for offshore reclamation work and islands revetment.
Management and supervision for construction and rehabilitation projects around Iraqi governorates, in
coordination with Ministries of Education and Health; 150 School & Health Facilities, Roads.
Projects:
• THO-AL-FEQAR palace/Northern Tekreet City; 22, 000m2
superstructure palace on the old
Tekreet hill.
• AL-NASER Palace/ Baghdad; offshore superstructure, foundation constructed on underwater
concrete driven piles and surrounded by split floating gardens.
Projects:
• AL-FAW Palace project, a huge superstructure constructed on offshore reclamation artificial island,
foundation of 6500 concrete driven piles and two access bridge roads.
• AL-NEDAA 79 Project, complex resort buildings with flash leveled swimming pools inside of an
artificial island.
• AL-FARISS Palace; underground luxurious safe structure.
• Presidential Palaces Compound; High Quality Construction, Wide Spans Halls Linked by
High Link Bridges, Upper Floors Swimming Pools, Huge Domes/Sky Lights, Elevated
Entrances and Approach Roads.
• Utility Block: Power Substations Transformer/ H.V. / L.V. Rooms, District Cooling/Chilled
Water Stations, Domestic/Irrigation Water Tanks/Pump Stations, Sewerage Treatment
Plant and Services Lines/Corridors.