Quantity Surveyor
Sharaka Holdings
مجموع سنوات الخبرة :14 years, 11 أشهر
Preparation of BOQ & Breakdowns Preparation of Quotations
* Taking of Measurements from Drawing and Site Measurements
* Preparation of Monthly Valuations & Supporting Documents
* Preparation of Day Works, Extra Works and Variations Claims Conversant with
* Tender Drawings, Shop Drawings, Specifications, FIDIC Conditions
* Contract Agreement and Other Conditions
• The Invoices/Certified Interim Payment Certificates
_______________________
Amila Gayan Sanjaya
REFREES: Up on Request
3
A Leading Interior & Fit out Contractor in U.A.E)
Projects Commercially Involved (Post Contracting)Commercial Department
PROJECT : Nation Tower Project
PROJECT : Nation Tower Project- Abu Dhabi, UAE
CLIENT : International Capital Trading
CONSULTANT : Hill International/KEO
Interior Package (Joinery & Fit out)
Value: 195 M AED
Duties and Responsibilities (Post Contracting):
• Preparation of BOQ & Breakdowns Preparation of Quotations
• Taking of Measurements from Drawing and Site Measurements
• Preparation of Monthly Valuations & Supporting Documents
• Preparation of Day Works, Extra Works and Variations Claims Conversant with tender Drawings, Shop Drawings, Specifications, FIDIC Conditions
• Advance Payment Amounts in Tender Forms Participate Tender Submission Contract Agreement and Other Conditions
• The Invoices/Certified Interim Payment Certificates
PROJECT: Ritz Carlton Abu Dhabi
CLIENT: Abu Dhabi National Hotels
PROJECT MANAGER: Mace International
ENGINEER: OTAK US
Duties and Responsibilities (Post Contracting):
Taking of Measurements from Drawing and Site Measurements
Preparation of Monthly Valuations & Supporting Documents
Preparation of Day Works, Extra Works and Variations Claims Conversant with tender Drawings, Shop Drawings, Specifications, FIDIC Conditions
Advance Payment Amounts in Tender Forms Participate Tender Submission contract Agreement and Other Conditions
The Invoices/Certified Interim Payment Certificates
Projects Commercially Involved: (Pre and Post Contact)
• Building works
• Plumbing works
Main Duties involved
* Coordinate with consultant and prepare the shop drawings according to the designed drawings,
standards & architectural drawings.
* If there is designing part of above mentioned field or existing design changing according to site
condition, that will be done
* Guide the draftsman to draw relevant drawings using AutoCAD and submit to consultant
approval.
Order the material according to the resource plan
* Implementing Plumbing system, Fire detection and fighting system, Ventilation and Air
Conditioning duct and Gas system and panel boards.
* Detailed and accurate quantity take off and prepares monthly Contract Status and Claims Reports
* Guide the technicians to assemble and install the pumps. Guide the electricians to install the
designed panel board. Handover the system after the testing and commissioning.
Proposed Rocell Showroom at Trinco
CLIENT:Royal Ceramic
Taking of Measurements from Site Measurements
Preparation of Monthly Valuations & Supporting Documents
Guiding All Interior Works at Site
Managing projects from conception, pre-production through to completion.
Providing technical support to the project team and wider regional teams.
Managing project budgets and keeping costs down.
Responsible for the completion of all documentation.
Prepare contract documentation for procurement services and materials.
)