Construction Site Manager
China Railway Construction Corporation Limited
مجموع سنوات الخبرة :10 years, 6 أشهر
Site Manager: KAP5 King Abdullah Ibn Abdul-Aziz Project for Development of The Security Facilities for Ministry of Interior KAP5
• Liaising with clients and reporting on progress to staff and the public and weekly monthly and 3-month look ahead plans
• Supervising construction workers and hiring subcontractors
• MR materials for each phase of the project
• Monitoring build costs and project progress
• Conducting quality and safety inspections
• Checking and preparing site reports,
• Maintaining quality control checks
• Motivating the workforce
• Day to day problem solving and dealing with any issues that arise
Project Name
: KAP5 King Abdullah Ibn Abdul-Aziz Project for Development of The Security Facilities for Ministry of Interior KAP5
Project Brief Description
:
This project is re-measured Turnkey basis for the detail design, engineering, material procurement with contract about sum of 2.6 Billion USD and 243 sites locating majorly in Riyadh, Dammam, Jeddah & Makkah areas, all over the Kingdome of Saudi Arabia. The scope of work includes Engineering, Procurement and Construction, including all labor, materials, Equipment and services for the detail engineering;
Responsibilities as QAQC
: • Develop and determine all standards to perform inspection and tests on all procedures and oversee all testing methods and maintain high standards of quality for all processes.
• Review quality of all materials at the site and ensure compliance with all project specifications and quality and collaborate with the department for all material procurement and maintain a quality of materials. Liaise the Technical Engineer for submission of material submittals to Consultant
• Coordinate with the consultant’s representative and Site In-charge for inspection.
• Report to the QA/QC Manager, control, and monitor all activities
ARCHITECT QAQC ENGINEER
KAFD The project consists of finishes for 5 Parcels every parcel consists of a housing tower, administration tower, project cost plus around 2 Billion SAR
Riyadh Bus Stops and Bus Rapid Transit (BRT) System Project is an integral part of the transportation facilities currently being developed for the city of Riyadh including the new Riyadh Metro. Contract Value sum of 2.7 Billion SARdivided to Two Phases
Responsibilities
: • Develop and determine all standards to perform inspection and tests on all procedures and oversee all testing methods and maintain high standards of quality for all processes. • Review quality of all materials at the site and ensure compliance with all project specifications and quality and collaborate with the department for all material procurement and maintain a quality of materials. Liaise the Technical Engineer for submission of material submittals to Consultant • Coordinate with the consultant’s representative and Site In-charge for inspection. • Report to the QA/QC Manager, control, and monitor all activities related to Quality. • Manage all work methods and maintain knowledge on all quality assurance standards and monitor continuous application for all quality assurance processes and recommend corrective actions for all processes.
Site Engineer :AL Farida Project
17 villas finish for Ewan Real estate investment
Responsibilities:
Manage plans, contracts, budgets, bills of quantities.
Assists the Senior design manager for the shop drawings
Assists the Senior Quantity Surveyor and Contracts Manager in all related duties.
Site Engineerر: Renovation project for Four Seasons Hotels at Sharm el Sheikh and
San Stiphano Alexandria
Responsibilities:
Follow up in the site with the subcontractors the working going as required and preparing subcontractors invoices.
Bachelors degree in architecture
mechanical design and production