Amir Ebraheem Abdulraheem  El-zeny, 2nd electrical maintenance engineer

Amir Ebraheem Abdulraheem El-zeny

2nd electrical maintenance engineer

North&south sainai company for water and wastewater

Location
Egypt - Arish
Education
Bachelor's degree, computer & control systems
Experience
21 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 7 Months

2nd electrical maintenance engineer at North&south sainai company for water and wastewater
  • Egypt - Arish
  • My current job since April 2021
3rd engineer at 10th Of Ramadan City Authority
  • Egypt - Cairo
  • My current job since February 2014

10th Of Ramadan City Is Avery Big City with more than 100 Neighborhood & More Than 1700 Factory So It Has A Huge Waste Water Network Starting From
175mm to 1500 mm Pipeline &5 Pumping Station
A3 Station: 3 Pumps With Capacity Of 15000 m3/d 41 Station: 4 Pumps With Capacity Of 50000 m3/d
B4 Station: 4 Pump With Capacity Of 196000m3/d 3rd &4th Stage Station: 4 Pumps With Capacity Of 130000 m3 /d
Talat Mostafa Pump Station: 6 Pumps With Capacity Of 100000 m3/d
Waste Water Mechanical Treatment Station Has A Total Design Capacity Of (286000) m3/d And Actual Capacity (88000) m3/d
1st & 2nd Oxidation Ponds Aerated Have A Total Design Capacity Of (95000) m3/d For Each 3rd Oxidation Pond Non-Ventilated Has A Total Design Capacity Of ( 40000 ) m3/d

Responsibilites : For Self-Operating Stations,
Follow-Up Operations.
Make Sure That Maintenance Is
Performed as Planned.
Preparing The Daily & Monthly
Reports needed.

For Operating Through Others
Stations,
Make Sure That Contractor Is
Properly Operation As Egypt
Code.
Make Sure That Contractor Does
Maintenance Scheduled As Egypt
Code.
Make Sure That Contractor Repair
Faults Quickly.
Make Sure That Contractor
Performs The Terms Of The
Contract.
Prepare The Monthly Payment
Papers To The Contractor.

3ed Engineer at Greater Cairo Sanitary Drainage Company ( GCSDC )
  • Egypt - Cairo
  • September 2011 to January 2014

10th Of Ramadan City Is Avery Big City with Neighborhood & More Than 1700 Factory So It Has A Huge Waste Water Network Starting From 175mm to 1500 mm Pipeline &3 Pumping Station A3 Station: 3 Pumps With Capacity Of 15000 m3/d 41 Station: 4 Pumps With Capacity Of 50000 m3/d
B4 Station: 4 Pump With Capacity Of 196000m3/d
Responsibilites : For Network, Insuring That All
Maintenance Work Done As
Schedule.
Ensuring That Any Complain From
Any Citizen Or Factory Solve At
Time.
Preparing The Daily & Monthly
Report For Pump Station, Follow-
Up Operations & Make
Sure That Maintenance Is
Performed as planned
Preparing The Daily & Monthly
Reports needed.

Maintainance Engineer at Integra
  • Egypt - Zagazig
  • May 2009 to September 2011

ntenance Engineer
Description of site : 10th Of Ramadan Waste Water
Mechanical Treatment Station
Has A Total Design Capacity Of
(286000)m3/d And Actual
Capacity (80000) m3/d

Responsibilites : Preparing Periodic Maintenance
Schedule.
Make Sure That Maintenance Is
Performed as planned.
Ensuring That Any Failure
Happen To The System Of Work
Solve At Time.
Preparing The Daily & Monthly
Reports needed.

electrical site engineer at icotech
  • Egypt - Cairo
  • November 2007 to May 2009

Description of site :
10th of Ramadan waste water mechanical treatment
Station has a total design capacity of(286000)m3/day and
actual capacity (80000) m3/day

Responsibility :
arrange work inside the site .
helping in making maintenance plane
Insuring that all maintenance work done as schedule.
Insuring that any failure happen to the system
of Work solve at time.
Preparing the daily report needed.

electrical site engineer at Aris investment & trading CO
  • Oman - Muscat
  • August 2006 to September 2007

arrange work inside the site
Insuring that all work done as consultant drawing
helping at company marketing

computer maintainance engineer at abo ashraf trading
  • Oman
  • April 2004 to July 2006

assempling computer depending on customer needs and market need, make hardware and software maintainance for customer computers and networing

computer maintainance engineer at speed technilogy
  • Egypt
  • September 2002 to April 2004

assempling computer depending on customer needs and market need, make hardware and software maintainance for customer computers

Education

Bachelor's degree, computer & control systems
  • at faculty of engineering
  • July 2002

using plc to control proses of formatting petroleum pipeline

Specialties & Skills

Pump Stations
Waste Water Treatment
computer maintainance
Preparing Equipment specification
Preparing Equipment evaluation reports

Languages

English
Expert

Memberships

نقابة المهندسين المصرية
  • 50/08307
  • September 2002

Training and Certifications

Maintenance of gates and valves (Training)
Training Institute:
GCSDC training center

Hobbies

  • Football
    Iam el ahly fan the greatest football team in all of Africa, eager follower to the english premiere league
  • Reading
    Iam reading more than 25 book in the year most about history and novels