2nd electrical maintenance engineer
North&south sainai company for water and wastewater
Total years of experience :21 years, 7 Months
10th Of Ramadan City Is Avery Big City with more than 100 Neighborhood & More Than 1700 Factory So It Has A Huge Waste Water Network Starting From
175mm to 1500 mm Pipeline &5 Pumping Station
A3 Station: 3 Pumps With Capacity Of 15000 m3/d 41 Station: 4 Pumps With Capacity Of 50000 m3/d
B4 Station: 4 Pump With Capacity Of 196000m3/d 3rd &4th Stage Station: 4 Pumps With Capacity Of 130000 m3 /d
Talat Mostafa Pump Station: 6 Pumps With Capacity Of 100000 m3/d
Waste Water Mechanical Treatment Station Has A Total Design Capacity Of (286000) m3/d And Actual Capacity (88000) m3/d
1st & 2nd Oxidation Ponds Aerated Have A Total Design Capacity Of (95000) m3/d For Each 3rd Oxidation Pond Non-Ventilated Has A Total Design Capacity Of ( 40000 ) m3/d
Responsibilites : For Self-Operating Stations,
Follow-Up Operations.
Make Sure That Maintenance Is
Performed as Planned.
Preparing The Daily & Monthly
Reports needed.
For Operating Through Others
Stations,
Make Sure That Contractor Is
Properly Operation As Egypt
Code.
Make Sure That Contractor Does
Maintenance Scheduled As Egypt
Code.
Make Sure That Contractor Repair
Faults Quickly.
Make Sure That Contractor
Performs The Terms Of The
Contract.
Prepare The Monthly Payment
Papers To The Contractor.
10th Of Ramadan City Is Avery Big City with Neighborhood & More Than 1700 Factory So It Has A Huge Waste Water Network Starting From 175mm to 1500 mm Pipeline &3 Pumping Station A3 Station: 3 Pumps With Capacity Of 15000 m3/d 41 Station: 4 Pumps With Capacity Of 50000 m3/d
B4 Station: 4 Pump With Capacity Of 196000m3/d
Responsibilites : For Network, Insuring That All
Maintenance Work Done As
Schedule.
Ensuring That Any Complain From
Any Citizen Or Factory Solve At
Time.
Preparing The Daily & Monthly
Report For Pump Station, Follow-
Up Operations & Make
Sure That Maintenance Is
Performed as planned
Preparing The Daily & Monthly
Reports needed.
ntenance Engineer
Description of site : 10th Of Ramadan Waste Water
Mechanical Treatment Station
Has A Total Design Capacity Of
(286000)m3/d And Actual
Capacity (80000) m3/d
Responsibilites : Preparing Periodic Maintenance
Schedule.
Make Sure That Maintenance Is
Performed as planned.
Ensuring That Any Failure
Happen To The System Of Work
Solve At Time.
Preparing The Daily & Monthly
Reports needed.
Description of site :
10th of Ramadan waste water mechanical treatment
Station has a total design capacity of(286000)m3/day and
actual capacity (80000) m3/day
Responsibility :
arrange work inside the site .
helping in making maintenance plane
Insuring that all maintenance work done as schedule.
Insuring that any failure happen to the system
of Work solve at time.
Preparing the daily report needed.
arrange work inside the site
Insuring that all work done as consultant drawing
helping at company marketing
assempling computer depending on customer needs and market need, make hardware and software maintainance for customer computers and networing
assempling computer depending on customer needs and market need, make hardware and software maintainance for customer computers
using plc to control proses of formatting petroleum pipeline