Amir Hussain, PROJECT COORDINATOR SOUTH, IMPLEMENTATION/ACCEPTANCE

Amir Hussain

PROJECT COORDINATOR SOUTH, IMPLEMENTATION/ACCEPTANCE

Ericsson

Location
Pakistan - Hyderabad
Education
Bachelor's degree, Electronic
Experience
13 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 5 Months

PROJECT COORDINATOR SOUTH, IMPLEMENTATION/ACCEPTANCE at Ericsson
  • Pakistan - Hyderabad
  • August 2015 to July 2016

Have been a part of successful TRM SWAP/Post SWAP/Acceptance Teams of Ericsson on SWAP Project of Mobilink TRM for 3G network, involved in complete end to end SWAP/Post SWAP of Transmission Sides, Also Acceptance activities with customer, directly reporting to IM/CPM SWAP and CPM Acceptance.


 Managing the complete scope of PMCL TRM upgrade of Microwave from NEC equipment to Ericsson TN-Nods-R5/R6.
 Managing ASP’s for the timely delivery of the project.
 Timely reporting of all the updates to the management.
 Taking all the stakeholders of the project in confidence of the activities
 Managing the ATP count of the project and make sure all installations are getting done according to the quality standards
 Selecting ASP’s for the new clusters and assigning them the scope.
 Managing the complete ATP scope of TRM/MW Project.
 Managing Post ATP snags Rectifications and rescheduled ATP with PMCL.
 Soul responsible to Delivered complete project with Acceptance to PMCL.

RAN SUPERVISOR, IMPLEMENTATION/SWAP/POST SWAP RECTIFICATIONS/ACCEPTANCE at Ericsson
  • Pakistan - Multan
  • August 2013 to August 2015

Have been a part of successful RAN SWAP/Post SWAP/Acceptance Teams of Ericsson on MEGA SWAP Project of Mobilink GSM 2G/3G network since phase 1 currently involved in complete end to end SWAP/Post SWAP of BTS and Transmission Sides, Also Acceptance activities with customer, directly reporting to IM/CPM SWAP and CPM Acceptance.

Responsibilities

 Supervise Ericsson ASP’s on both indoor/outdoor installations of RBS6000 series including RBS 6101, 6102, 6301 and TXN- TMR6201.
 Supervise Ericsson ASP’s on both indoor/outdoor installation of transmission. Equipment Mini link R4/R5 Family, CN/Traffic Node- IP Based 2p, 6p, 20p and PDH/SDH links.
 Supervise SWAP/Post SWAP activities till Acceptance.
 Responsible Complete end to end integration of Sites RBS/TRM (RBS6000 Series 6301, 6101, 6102, 6201 & TMR-TN-R4 2P, 6P, 20P and CN nods).
 Responsible End to end trouble shooting both ends TRM/RBS after site went on-air till handed over to MS team.
 Post Swap technical BSS/TRM support to MS team on outages and Fault rectifications.
 Performing ATP of SWAP sites with Customer.
 Post ATP coordination with customer and ASP’s.
 Responsible for ATP of all New Expansions of MW-Links in south region.

SERVICES ENGINEER II EXPERIENCED (MS/FM) at Ericsson
  • Pakistan - Hyderabad
  • August 2007 to March 2013

Have been a part of successful RAN SWAP/Post SWAP/Acceptance Teams of Ericsson on MEGA SWAP Project of Mobilink GSM 2G/3G network since phase 1 currently involved in complete end to end SWAP/Post SWAP of BTS and Transmission Sides, Also Acceptance activities with customer, directly reporting to IM/CPM SWAP and CPM Acceptance.

Responsibilities

 Supervise Ericsson ASP’s on both indoor/outdoor installations of RBS6000 series including RBS 6101, 6102, 6301 and TXN- TMR6201.
 Supervise Ericsson ASP’s on both indoor/outdoor installation of transmission. Equipment Mini link R4/R5 Family, CN/Traffic Node- IP Based 2p, 6p, 20p and PDH/SDH links.
 Supervise SWAP/Post SWAP activities till Acceptance.
 Responsible Complete end to end integration of Sites RBS/TRM (RBS6000 Series 6301, 6101, 6102, 6201 & TMR-TN-R4 2P, 6P, 20P and CN nods).
 Responsible End to end trouble shooting both ends TRM/RBS after site went on-air till handed over to MS team.
 Post Swap technical BSS/TRM support to MS team on outages and Fault rectifications.
 Performing ATP of SWAP sites with Customer.
 Post ATP coordination with customer and ASP’s.
 Responsible for ATP of all New Expansions of MW-Links in south region.

Executive Engineer BSS O&M at warid telecom (abu dhabi group)
  • Pakistan - Karachi
  • December 2005 to July 2007

 Operation and maintenance of RBS (Ericsson) 2206, 2207 and RBS 2106/2107 for both 900 and 1800 GSM network. Sites Integration and troubleshooting of routine internal alarms.
 Connectivity of sites at the time of Expansion and Power on activities. Routine checking and FAULT ATTENDANCE at TRAFIC NODE and HUB SITES.
 Working on Microwave (Ericsson) MINILINK (CLASSIC, HIGH CAPACITY), TRAFFIC NODES.
 Involvement in Transmission links` up gradation (cutover) from low capacity to high capacity (Traffic node to HC and classic to Traffic node).
 Use of All kind of Testing Tools for RBS and MICROWAVE including Site Master (Anritsu S332C) & (Anritsu S331B) regarding VSWR & DTF &Software for Soft Testing of RBS and MSM for soft testing and access of Mini Link.
 Strong GSM BSS product knowledge with experience in routine maintenance and troubleshooting in the several of the following areas: OMC-R, BSC, BTS.
 Well-versed in the software loading for all sub-systems for upgrade and patching processes.
 Handling all PTCL (lease media) related issues and problems and good coordination’s with PTCL authorities.

BTS/Transmission Engineer at Norconsult Telematics
  • Pakistan - Multan
  • June 2005 to December 2005

Responsible of Siemens BS240 XL BTS Commissioning, Testing and Integration,
 Acceptance & Quality check.
 Working on Power Node Eltec Rectifiers. Also Responsible of Siemens Sral XD PDH and SDH (Testing & Acceptance).
 Participate TSS surveys.
 Responsible of all TRM PDH & SDH links acceptance and related documentations, checking B

BSS Engineer at Myson Engineering (Pvt) Ltd
  • Pakistan - Karachi
  • January 2005 to June 2005

 Supervise the Installation, testing and commissioning of Ericsson ‘BTS’ 2206 & 2207 cabinet.
 Supervise the laying of LDF 550A, RG8U, RG6U cables with proper connector.
 VSWR tests were performed at various BTS sites for the verification of the TX and RX (DTx1&DTx2) path with the help of Site master.
 Installation, mounting, Commissioning IDU & ODU “Ericsson” microwave (Mini Link 2E1, 16E1) units. Classic & Traffic Node Sites.
 Supervise the installation of directional Antennas with their specified orientation and proper tilts with TMA.
 Installation of BBS, Rectifier and all kind of A.C & D.C works and Troubleshooting all related faults.

Chief Technical Engineer South at Nutek Networks Pakistan (Pvt) Ltd
  • Pakistan - Karachi
  • August 2003 to December 2004

 Supervision the Teams regarding the Installations, commissioning and testing of BTS cabinets and cabling works.
 Supervision of the entire outdoors RF cabling and antennas, including the laying of RX/TX feeder cables.
 Complete testing of RX/TX antenna systems, including VSWR test.

BSS Trainee Engineer at MS Nortel Networks (Asia) Ltd
  • Pakistan - Karachi
  • September 2002 to May 2003

 Supervise the Installation, testing and commissioning of Nortel ‘BTS’ S8000 cabinet, ladder, rectifier & alarm module.
 Supervise the laying of LDF 550A, RG8U, RG6U cables with proper connector.
 VSWR tests were performed at various BTS sites for the verification of the TX and RX path with the help of Site master.
 Installation, mounting, Commissioning IDU & ODU “HARRIS” microwave (4E1, 8E1 & 16E1) protected and non-protected unit.
 Monitored BER alarm testing of the Microwave using the BERT tester.
 Supervise the installation of directional antennas with their specified orientation and proper tilts.
 Installation of Eltek Rectifier and all kind of A.C & D.C works.
 Troubleshooting all related faults.

Education

Bachelor's degree, Electronic
  • at DCET
  • January 2003

Bachelor of Electronics Engineering

Specialties & Skills

Languages

English
Expert

Training and Certifications

MINI-LINK HC Operation & Maintenance (Training)
Training Institute:
Ericsson Training Center Mölndal(SWEDEN)
Date Attended:
January 2007