مهندس مدني
Sinoma-cdi
مجموع سنوات الخبرة :1 years, 7 أشهر
Sinoma-CDI company
• From June 2021 to December 2022
• Project called (Construction of 109 buildings in kafr el-sheikh city)
• Worked as a site engineer in the implementation and supervision of 2
housing buildings consisting of a ground floor and 11 floors, from
Start to finish of concrete works and finishes. And handing
over The works to the Dorsh consulting office of the engineering
Authority of the armed forces.
- Dr. Ashraf Ragab`s Engineering Consultants Office
• From January 2019 to June 2021
• Project called: (Bashayer Al-Khair) in Alexandria, affiliated to
the engineering authority of the armed forces
• Worked as a consulting Engineer and supervised the implementation
Of concrete structures and finishes.
Sinoma-CDI company • From June 2021 to December 2022 • Project called (Construction of 109 buildings in kafr el-sheikh city) • Worked as a site engineer in the implementation and supervision of 2 housing buildings consisting of a ground floor and 11 floors, from Start to finish of concrete works and finishes. And handing over The works to the Dorsh consulting office of the engineering Authority of the armed forces. - Dr. Ashraf Ragab`s Engineering Consultants Office • From January 2019 to June 2021 • Project called: (Bashayer Al-Khair) in Alexandria, affiliated to the engineering authority of the armed forces • Worked as a consulting Engineer and supervised the implementation Of concrete structures and finishes.