QA/QC Team Leader - Ammonia & Urea Fertilizer Project - KIMA - ASWAN - EGYPT
The project involves the construction of a fertilizer plant with an annual production capacity of 550, 000 tons of nitrogen-based fertilizers per year. The complex consists of one ammonia production unit of 1, 200 ton/day capacity, implementing the KBR “Purifier” technology; one Urea melt production unit of 1, 500 ton/day capacity, implementing the “Pool Reactor” technology of Stamicarbon; and one Urea granulation unit of 1, 500 ton/day capacity, implementing the urea granulation technology of Stamicarbon.
Key Responsibilities and Accomplishments
Dealing with Project Quality documents in accordance with company specs that fulfils requirements of ASME code and client's specifications, Such as:
Project Quality Plan
NDT scope
Approved Welding procedure
NDT Procedures…, etc.
Manage, develop and insure the submissions of all Quality Control submittals required to start the construction activities including the client's approval and in full compliance with the project schedule
Categorization of the rejected EIRs, Root cause analysis for rejected EIRs to avoid repetition.
For NCRs: Ensure that NCRs are replied and closed within the time frame mentioned in the PQP.
For the Audit Findings; Taking the corrective actions required within one week from receiving the Audit Findings.
For the punch list items: Closing the items as they are actually corrected within I day from being notified by the construction team
Planed, managed and organized construction projects from start to finish in line with schedule, standards specifications, requirements and budget, Plan, organize, direct, control and evaluate the project progress
P&S Construction Inc. Design Built -Contractors (http://www.psconstruction.net ) - USA
P&S Construction is Design Build Company working with the United States Corps of Engineering & Department of NAFVAC in United States, Djibouti, Singapore and Guam
Project Highlights
Quality Control Manager for $16M Construct Aircraft Maintenance Hanger and Telecom Facility Building in United States NAFVAC camp - Djibouti ( 2130 m2 & 16 M height of Pre-Engineering Building including the Hanger bay and offices area, firefighting, fire alarm, electrical, communication and security systems, Hanger access apron to the airport 1728M2 concrete, all underground utilities, domestic and fire hydrant water supply line, firefighting pump house, 2 water storage tanks capacity 200 M3/each, asphalt roads & security fence )
Quality Control Manager for $11.1 M Replacement of 1375 Air Condition units in United States NAVAC Camp - Djibouti
Key Responsibilities and Accomplishments
Monitor the progress and effectiveness of the project quality management system. Recommend and implement improvements when required
Plan, organize, direct, control and evaluate the project progress
Efficiently lead and managed team of construction workers, traders and sub-contractors
Monitored project progress through ongoing site inspections and informed management about project status, risks, challenges and modifications
Planed, managed and organized construction projects from start to finish in line with schedule, standards specifications, requirements and budget
Reviewed and administered operational plans, goals, objectives, policies, and operating procedures and maximized effectiveness
Oversaw and monitored operational activities, including schedule development, and assisted the production process
Plan, organize, direct, control and evaluate the project progress /Generate electrical BOQ and work with the suppliers
United Infrastructure Projects - UIProjects (http://www.uiprojects.net ) - USA
UIProjects is a major design/build company with over $1.9 Billion projects (Airports, Roads, Water Supply & Sanitation and Military Installation Camps for United States Corps of Engineering & NAVAC Departments, USAID and the United Nations in Afghanistan, Djibouti, and Bahrain &Dubai)
Project Highlights
Quality Control Manager / Electrical Team Leader for the company projects in United States NAVAC camp - Djibouti
$7.3M LAMS II Project Built 14, 000 M2 Apron, one Taxi way, 2 new 90 ft. *132.5 ft. sprung hangers, relocate of existing 3 Sprung Hangers, fire alarm, Power & Communication supplementary utilities)
$7.8M Water Distribution System (upgrade water network facility included install 3000 LM new ductile iron domestic water line and Fire Hydrant Loop and construction of 720 M2 Pre-Engineer Building for ROWPU System)
$3.2 M Satellite Fire Station Project (Construct 2 Bay apparatus areas, Offices, Fire Alarm, Fire Fighting, Security system, Communication. This project achieved LEED Silver Rating)
$5.4 M for Multiple Award Construction Contract Project, this project Consisted of fifteen Sub-tasks included renovation for old buildings, upgrade all electrical, communication, water and sewer underground utilities, upgrade the existing power plant and built new buildings inside the camp)
Key Responsibilities and Accomplishments
Ensured project efficiency through cost control and performance management of project teams and sub-contractors
Assuring that the quality of the work meets or exceeds the project’s contractual requirements
Conduct preparatory, initial and follow-up meetings to establish an understanding of the standards of care desired for each definable feature of work.
Conduct periodic follow-up inspections to verify that work is proceeding with the contract documents and the approved submittals.
Enlivened 6 projects after considered delays, resolved challenging contractor issues and replaced consultant or contractor when necessary to ensure timely and high-quality deliverables
Executed safety program on site, ensured all workers and sub trades adhere to protocols and guidelines - safe work procedure, conducted and documented regular safety meetings, ensured proper PPE was worn at all times, conducted daily hazard assessment, resulting 0 incidence
Provided effective solutions to challenges with a collaborative and communicative approach
Controlled project costs related to equipment and materials
Responsible for plans, controls and monitors the actual execution of all electrical related works of the project, to ensure that the project will be done in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards.
Responsible for all electrical work estimation for RFP & do all the quantity survey
Red Sea Engineers & Constructors work as a subcontractor to DynCorp International in Support Of the U.S CORPS OF ENGINEERS & AFGHANISTAN National Army
Project Highlights
ANA Garrison Phase 1 & 2 at Jamberi Jalalabad Afghanistan consisting of 55 K-Span Buildings, Armory, Galley, Post Office, Warehouses $125M projects under United States Corps of Engineering in Afghanistan
Key Responsibilities and Accomplishments
Make sure that finished product meets all customer specifications and quality requirements, document and report inspection findings and monitor corrective action.
Ensure calibration and maintenance is performed on inspection equipment &communicate with project engineers to ensure schematics are in compliance with the final product
Responsible for all electrical systems, Underground Utilities, HV/MV systems, Fire Alarms, Lightening Protection System, Telecommunication Systems, Security System, Explosion Proof System, and Interior Distribution System & Underground Utility