QA QC Electric Engineer
Al Kifah ContractingCompany
Total des années d'expérience :14 years, 10 Mois
• Preparing the ITP/Method statement for Electrical and Low current system as per the specification and standard.
• Coordinating with the BMS team to make sure all the testing and commissioning going as per Project specification & standard.
• To attend Pre-Inspection Meetings and other meetings as required.
• Preparing The Inspection Assignment package for Critical Material and submit to Client for approval.
• Implements and ensure the effective QA/QC programmed to meet assigned project requirements.
• Verify all the materials with consultants as to conformance to plans and specification standards and make material inspection upon arrival at site.
• Conduct preliminary inspection and coordinate with resident engineer on any area need to be inspected as prerequisite to next activity.
Monitoring and controlling project scope by supervision and inspection of approval executed work at site, raising site instruction and non-conformity report (Internal NCRs) against the deviation from the project scope and specification.
• Make Sure that following the NEOM Schedule Q requirement during procurement, PIM & Material Testing stage procedure .
• Preparing the ITP/Method statement for Electrical and Low current system as per the specification and standard.
• Coordinating with the BMS team to make sure all the testing and commissioning going as per Project specification & standard.
• To attend Pre-Inspection Meetings and other meetings as required.
• Preparing The Inspection Assignment package for Critical Material and submit to Client for approval.
I worked on SABIC Jubail main building and global data center.Here The Client is SABIC. I worked on Five-Star Hotel Construction inRiyadh, Residential Building and High raise building.
I worked with this company on Mega project Al Haram Expansion Project Makka and MOi KAP Project Dammam.
To give full and extensive instruction to his team. To execute the works according to the latest approved revision of drawings and /or instruction of authorized authorities. To pass all instructions issued to him by the authorized representatives to his manager to handle contractually prior to commencement. Analyzing and resolving field problems.
Paper Machine from Electrical side, which has daily production of 250 Tons. An AGRO based Power plant having 12 MW Siemens makes turbine and also having 33kv hydil supply through grid
Maintenance of the Instruments like transmitter, Gauges, Pressure switches Positioner etc, calibration of the Instruments troubleshooting of technical problem in power plant and process plant.
I Completed my engineering in a reputed university of india.